Mahya Salehi
- Listed as
- architect
- Firm
- Mahya Salehi Fadardi
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2020 to Jul 2025
20 permits since 2000 (architect on 20 permits): 8 completed, 6 in progress, 5 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 18, 2025 | In progress filed Jul 2025, not yet issued | 42 Allen St | a mandatory seismic upgrade unconditioned garage of ab-106 and ab-107. conversion of(e)unconditioned garage & storage spaces into 2 adu & utility room in the(e)3 level multi-family building as indicated on drawings.demolition of the(e)storage rooms in the rear yard.Details
a mandatory seismic upgrade unconditioned garage of ab-106 and ab-107. conversion of(e)unconditioned garage & storage spaces into 2 adu & utility room in the(e)3 level multi-family building as indicated on drawings.demolition of the(e)storage rooms in the rear yard. | $350,000 | |
| Jun 24, 2025 | In progress filed Jun 2025, not yet issued | 2038 Mcallister St | Urban Nest Inc, White Construction Builders Inc | construction of new one (1) detached 1-story, type v-b, adu with 2 bedrooms & 2 bathrooms. pv & f/a under sep permit(s). exist main building is 3-story, 5 units residential r-2 occupancy. adding accessory (1) unit.Details
construction of new one (1) detached 1-story, type v-b, adu with 2 bedrooms & 2 bathrooms. pv & f/a under sep permit(s). exist main building is 3-story, 5 units residential r-2 occupancy. adding accessory (1) unit. | $80,000 |
| Jun 5, 2025 | In progress filed Jun 2025, not yet issued | 853 Rhode Island St | limited to: (n) 4" concrete slab on grade; (n) wood 2nd level with (n) stair to rear yard; (n) 2 panel sliding door and fixed window on rear facade of 2nd levelDetails
limited to: (n) 4" concrete slab on grade; (n) wood 2nd level with (n) stair to rear yard; (n) 2 panel sliding door and fixed window on rear facade of 2nd level | $60,000 | |
| Feb 27, 2025 | In progress issued Feb 2026 | 1449 Hyde St | Vizcon Construction, Urban Nest Inc | conversion of (e) unconditioned storage space into (n) 775sf adu with 1 bed & 1 bath,storage room, trash toter enclosure & 1hr hallway connecting the adu to building foyer. (n)wood framed steps on (e) sloped concrete floor.replace rear yard deck with new.Details
conversion of (e) unconditioned storage space into (n) 775sf adu with 1 bed & 1 bath,storage room, trash toter enclosure & 1hr hallway connecting the adu to building foyer. (n)wood framed steps on (e) sloped concrete floor.replace rear yard deck with new. | $150,000 |
| Dec 25, 2024 | In progress issued Aug 2025 | 46 Cresta Vista Dr | Macken Construction | revision to pa#202311080463 specifically concerns deck area & basement level. revised details for new deck columns; adding underpinning details. revising length of opening at basement level & adjustment to shear wall @ each sides of door opening.revised title 24.providing drainage & grading drawingsDetails
revision to pa#202311080463 specifically concerns deck area & basement level. revised details for new deck columns; adding underpinning details. revising length of opening at basement level & adjustment to shear wall @ each sides of door opening.revised title 24.providing drainage & grading drawings | $5,000 |
| Apr 7, 2024 | In progress issued Oct 2024 | 1466 15th Av | Am Construction Inc | partial conversion of(e)unconditioned 1st fl to(n)conditioned area.(n)conditioned areas include 1b,1ba,a music & family room and wetbar.103 sf addition to (e)garage & 106 sf rear addition to conditioned space.demolition of(e) stairs in the lgihtway.interior remodel of upper level.Details
partial conversion of(e)unconditioned 1st fl to(n)conditioned area.(n)conditioned areas include 1b,1ba,a music & family room and wetbar.103 sf addition to (e)garage & 106 sf rear addition to conditioned space.demolition of(e) stairs in the lgihtway.interior remodel of upper level. | $200,000 |
| Jun 7, 2023 | Completed final sign-off Jul 2024 | 849 Dolores St | Am Construction Inc | conversion of addition to existing 527 sf family room & bath to become a 550 sf adu unit per oridinance 95-17.Details
conversion of addition to existing 527 sf family room & bath to become a 550 sf adu unit per oridinance 95-17. | $70,000 |
| Sep 21, 2022 | Completed final sign-off Jul 2023 | 2901 Pine St | Kieran Collins Construction | limited to interior remodel. infill of 250 sf(n)fl to (e)opening to below on 2nd level to expand occupiable area.open to below is enlcosed from above.addition of one(n)bedroom on en-suite bedroom & bath on the 2nd level.total proposed:3 beds/3.5 baths.remodel (e) kitchen as shown on the plans.Details
limited to interior remodel. infill of 250 sf(n)fl to (e)opening to below on 2nd level to expand occupiable area.open to below is enlcosed from above.addition of one(n)bedroom on en-suite bedroom & bath on the 2nd level.total proposed:3 beds/3.5 baths.remodel (e) kitchen as shown on the plans. | $100,000 |
| Sep 20, 2022 | Completed final sign-off Nov 2022 | 2975 Cesar Chavez St | Fortunate Construction Llc | add insulation and drywall to (e) framing at attic level. not for occupied usage.Details
add insulation and drywall to (e) framing at attic level. not for occupied usage. | $5,000 |
| Jul 20, 2022 | Never finaled issued Jun 2023, no final | 4160 20th St | White Construction Builders Inc | to comply with nov# 202293305. partial conversion of existing basement level into 530 sf adu unit.Details
to comply with nov# 202293305. partial conversion of existing basement level into 530 sf adu unit. | $150,000 |
| Apr 4, 2022 | Completed final sign-off May 2022 | 531 Hill St | Zeus Construction Corp. | to comply with nov 201700141, 202287240, and 202287250. to leaglize work including half bath and living room per plans and to address any other items in complaint. no structural work done.Details
to comply with nov 201700141, 202287240, and 202287250. to leaglize work including half bath and living room per plans and to address any other items in complaint. no structural work done. | $5,000 |
| Jan 12, 2022 | Never finaled filed Jan 2022, never issued | 919 Ingerson Av | interior remodel of the (e) sfh & addition of (n) second floor over the rear half of the (e) structure. (n) second floor to include one (n) bedroom & one (n) bathroom. to comply w/ nov# 20096567 by legalizing (e) storage room on ground floor.Details
interior remodel of the (e) sfh & addition of (n) second floor over the rear half of the (e) structure. (n) second floor to include one (n) bedroom & one (n) bathroom. to comply w/ nov# 20096567 by legalizing (e) storage room on ground floor. | $80,000 | |
| Dec 2, 2021 | Completed final sign-off Jun 2024 | 418 Capp St | White Construction Builders Inc | ground level interior conversion of existing garage into a 2bd/2ba unit.Details
ground level interior conversion of existing garage into a 2bd/2ba unit. | $80,000 |
| Dec 2, 2021 | Never finaled issued Jun 2022, no final | 2709 Baker St | San Francisco Investment Development | demolish (e) secondary staircase from 2nd fl to 3rd fl as indicated on plans. extend floor. demolish staircase (18 sqft) + enclose open deck area to create a (n) 90 sqft laundry. demo (e) interior walls around kitchen on 3rd fl to create an open kitchen. extend indicated on plans.Details
demolish (e) secondary staircase from 2nd fl to 3rd fl as indicated on plans. extend floor. demolish staircase (18 sqft) + enclose open deck area to create a (n) 90 sqft laundry. demo (e) interior walls around kitchen on 3rd fl to create an open kitchen. extend indicated on plans. | $50,000 |
| Nov 8, 2021 | Expired or cancelled expired Feb 2025 | 610 Illinois St | T C Construction | unit #303: interoir kitchen renovation, bath renovation level 1, bath renovation level 2.exterior ventless carrier, mini split heat pump dual zone.Details
unit #303: interoir kitchen renovation, bath renovation level 1, bath renovation level 2.exterior ventless carrier, mini split heat pump dual zone. | $28,000 |
| Oct 21, 2021 | Completed final sign-off Feb 2022 | 2034 Greenwich St | San Francisco Investment Development | (e) living room walls to be demolished on 2/f & 3/f. new beams & posts. installed to create openings btween living room & dining.Details
(e) living room walls to be demolished on 2/f & 3/f. new beams & posts. installed to create openings btween living room & dining. | $15,000 |
| May 5, 2021 | Completed final sign-off Sep 2022 | 898 Carolina St | White Construction Builders Inc | build rear stairs per approved variance ref: 2020-003848varDetails
build rear stairs per approved variance ref: 2020-003848var | $12,000 |
| Apr 8, 2021 | Completed final sign-off Nov 2022 | 2975 Cesar Chavez St | Fortunate Construction Llc | revision to pa# 202009093811; room expansion on ground level & level 2, additional sqft 395 added conditioned space on ground level and level 2Details
revision to pa# 202009093811; room expansion on ground level & level 2, additional sqft 395 added conditioned space on ground level and level 2 | $8,000 |
| Oct 6, 2020 | Never finaled filed Oct 2020, never issued | 152 12th Av | to erect a type v-b, 1-story workshop in rear yard setback.Details
to erect a type v-b, 1-story workshop in rear yard setback. | $15,000 | |
| Sep 21, 2020 | Never finaled filed Sep 2020, never issued | 152 12th Av | addition of conditioned floor areas on the existing ground level and second level. interior remodel of the existing residence. repairs and minor changes to street facade. new rear facade.Details
addition of conditioned floor areas on the existing ground level and second level. interior remodel of the existing residence. repairs and minor changes to street facade. new rear facade. | $160,000 |