- Aug 2000 to Mar 2026
17 permits since 2000 (engineer on 15 permits, authorized agent-others on 1 permit, designer on 1 permit): 13 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2026 | In progress issued May 2026 | 1304 Valencia St | Pacific Edge Construction Inc | structural revision to pa# 202204202645-s1, replace an existing unreinforced masonry foundation in poor condition along property line with poured reinforced concrete foundation. add 1-bathroom with 1-sink and 1-toilet within (e) floor plan on 3rd floor.Details
structural revision to pa# 202204202645-s1, replace an existing unreinforced masonry foundation in poor condition along property line with poured reinforced concrete foundation. add 1-bathroom with 1-sink and 1-toilet within (e) floor plan on 3rd floor. | $13,201 |
| Jun 13, 2025 | In progress issued Jun 2025 | 2171 39th Av | Canseco Construction Corp | reise the foundation plan and details for p/a 2022-0310-9681 to include about 60 linear feet of shallow foundation elements and temporary shoring of property line footings not previously shown on the approved drawings. excavation limited to less than 24 inches.Details
reise the foundation plan and details for p/a 2022-0310-9681 to include about 60 linear feet of shallow foundation elements and temporary shoring of property line footings not previously shown on the approved drawings. excavation limited to less than 24 inches. | |
| Apr 28, 2025 | In progress issued May 2025 | 3020 20th Av | Big Boys Construction Inc. | g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added.Details
g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added. | $195,000 |
| Aug 2, 2024 | Completed final sign-off Feb 2026 | 30 Surrey St | Perez Construction Llc. | interior renovation and alterations to the rear facade including replacing existing windows and door with a multi-sliding door within a new opening.Details
interior renovation and alterations to the rear facade including replacing existing windows and door with a multi-sliding door within a new opening. | $25,000 |
| Jun 28, 2023 | Completed final sign-off Dec 2025 | 2765 Filbert St | Amador General Construction Inc | remodel kitchen, 2 bathrooms & interior space.Details
remodel kitchen, 2 bathrooms & interior space. | $250,000 |
| Mar 21, 2022 | Completed final sign-off Aug 2023 | 549 Bowdoin St | Beyond The Horizon Construction | remodel of kitchen, removal of load bearing wall. new interior stair linking level 1 to level 2. level 1: new glass door system to rear yard + minor interior structural work around new stair.Details
remodel of kitchen, removal of load bearing wall. new interior stair linking level 1 to level 2. level 1: new glass door system to rear yard + minor interior structural work around new stair. | $200,000 |
| Aug 19, 2020 | Completed final sign-off Jun 2021 | 106 Stanyan St | Terence Mcmahon Construction | structural improvements and finish upgrades to an existing unit in a duplex located at 106 stanyan st. improvements include full remodel of master bathroom, fixture changes to guest bath, new kitchen cabinets, and appliances, move existing kitchen wall, patch flooring.Details
structural improvements and finish upgrades to an existing unit in a duplex located at 106 stanyan st. improvements include full remodel of master bathroom, fixture changes to guest bath, new kitchen cabinets, and appliances, move existing kitchen wall, patch flooring. | $33,000 |
| Sep 20, 2019 | Completed final sign-off May 2020 | 455 Scott St | Hammerhouse Construction | demolish existing kitchen cabinetry and install new cabinets. install appliances, plumbing and electrical fixtures. structural work as per structural drawings.Details
demolish existing kitchen cabinetry and install new cabinets. install appliances, plumbing and electrical fixtures. structural work as per structural drawings. | $45,000 |
| Oct 18, 2018 | Completed final sign-off Jan 2025 | 933 Valencia St | Prospect Construction Inc, Living Structure Inc | add residential unit at recreation room. replace (e) front stair, (e) side gate. (e) ground floor doors & windows. add new door and windows.Details
add residential unit at recreation room. replace (e) front stair, (e) side gate. (e) ground floor doors & windows. add new door and windows. | $60,000 |
| Mar 26, 2018 | Completed final sign-off Oct 2025 | 2487 47th Av | construct (n) 3rd story, extend 1st & 2nd stories 2'-4". full seismic upgrade. remodel (e) ground flr. remodel (e) 1st flr bathroom & bedrooms.Details
construct (n) 3rd story, extend 1st & 2nd stories 2'-4". full seismic upgrade. remodel (e) ground flr. remodel (e) 1st flr bathroom & bedrooms. | $250,000 | |
| Oct 27, 2016 | Completed final sign-off Jun 2017 | 546 44th Av | Cht Properties Development | 3rd floor - window replacement; 2nd floor - kitchen remodeling, (n) laundry room, replacement of 2 windows & 1 (n) skylight; 1st floor - (n) livable area (755 sq ft) (n) bath, (n) bedroom & family room, relocate mech, room structural/plumbnig, mech, electrical per plan and as requiredDetails
3rd floor - window replacement; 2nd floor - kitchen remodeling, (n) laundry room, replacement of 2 windows & 1 (n) skylight; 1st floor - (n) livable area (755 sq ft) (n) bath, (n) bedroom & family room, relocate mech, room structural/plumbnig, mech, electrical per plan and as required | $154,000 |
| Dec 28, 2015 | Completed final sign-off Dec 2018 | 2312 Castro St | J.W.D. Construction | vertical extendsion adding master bedroom on third floor. horizontal extendsion first floor out into the back yard. changing the front facade.Details
vertical extendsion adding master bedroom on third floor. horizontal extendsion first floor out into the back yard. changing the front facade. | $150,000 |
| Nov 20, 2015 | Expired or cancelled withdrawn Dec 2015 | 2312 Castro St | J.W.D. Construction | fix fire damage from the neighbor, changing living area & kitchen location, relocate internal staircase, strengthen (e) walls and frames for future 3/f addition, changing front & back windows & door location, add 8' height deck in the back.Details
fix fire damage from the neighbor, changing living area & kitchen location, relocate internal staircase, strengthen (e) walls and frames for future 3/f addition, changing front & back windows & door location, add 8' height deck in the back. | $150,000 |
| Oct 19, 2015 | Completed final sign-off Nov 2016 | 45 Castenada Av | Dragon's Power | kitchen remodel. removal of 2 (e) rear/side window and 1 (e) patio door. install new patio doors to (e) balcony. install new hot tub at rear on (e) ground level on (e) pad.Details
kitchen remodel. removal of 2 (e) rear/side window and 1 (e) patio door. install new patio doors to (e) balcony. install new hot tub at rear on (e) ground level on (e) pad. | $50,000 |
| May 9, 2014 | Completed final sign-off Dec 2014 | 3867 Jackson St | Aaron Gordon Construction Inc | lwr basement (n) doors, & radiation heating 1st flr, garage wall, /bd rm & bath remodel, 2nd flr (n) walls reconfigure bathroom & kitchen-remove bd rm ,3rd flr bath remodel, reconfiguration for addt'l bd rm, remove columns @ rear, new colums & beam support of (e) terrace. (n) windows (n) garage doorDetails
lwr basement (n) doors, & radiation heating 1st flr, garage wall, /bd rm & bath remodel, 2nd flr (n) walls reconfigure bathroom & kitchen-remove bd rm ,3rd flr bath remodel, reconfiguration for addt'l bd rm, remove columns @ rear, new colums & beam support of (e) terrace. (n) windows (n) garage door | $350,000 |
| Nov 29, 2011 | Completed final sign-off Sep 2014 | 2774 34th Av | Shek Builders Inc | 521 sq. ft. 2nd story addition consisting of 2 bedrooms & 1 bathroom.Details
521 sq. ft. 2nd story addition consisting of 2 bedrooms & 1 bathroom. | $50,000 |
| Aug 24, 2000 | Completed final sign-off Aug 2001 | 56 Casa Wy | repair (e)roof deck & deck rails,reinforce structural,beautify glazing arch windowsDetails
repair (e)roof deck & deck rails,reinforce structural,beautify glazing arch windows | $5,000 |