Living Structure Inc
- Based in
- Novato
- On San Francisco permits
- Jun 2016 to Aug 2021
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2021 | Completed final sign-off Aug 2021 | 3850 26th St | to obtain final inspection for work approvd under pa# 201301188342. all work is completed.Details
to obtain final inspection for work approvd under pa# 201301188342. all work is completed. | |
| Aug 10, 2021 | Completed final sign-off Aug 2021 | 1939 29th Av | to renew permit appliction 2014-0307-0240: to obtain final allwork is completed.Details
to renew permit appliction 2014-0307-0240: to obtain final allwork is completed. | |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 324 Edna St | reduction of scope to work previously permited under pa 201809129879. omit previously permitted new laundry room on 1 st floor and new services to rear yard deck.Details
reduction of scope to work previously permited under pa 201809129879. omit previously permitted new laundry room on 1 st floor and new services to rear yard deck. | |
| Aug 5, 2020 | Completed final sign-off Mar 2022 | 620 Junipero Serra Bl | remodel & reconfigure bedrooms, replace all windows in kind (st facing custom painted wood to match), upgrade non-compliant stair to lower level, remodel kitchen & bathrooms, voluntary seismic strengthening. no change in bldg envelope.Details
remodel & reconfigure bedrooms, replace all windows in kind (st facing custom painted wood to match), upgrade non-compliant stair to lower level, remodel kitchen & bathrooms, voluntary seismic strengthening. no change in bldg envelope. | $195,000 |
| Feb 5, 2020 | Completed final sign-off Oct 2021 | 324 Edna St | reduction of scope to work previously permitted under application #201909129879: omit previously permitted rear addition at 1st floor level. remove extg 1st floor deck at rear. add new 1st and 2nd floor decks & property line parapet walls at rear convert extg non-habitable 1st floor spaceDetails
reduction of scope to work previously permitted under application #201909129879: omit previously permitted rear addition at 1st floor level. remove extg 1st floor deck at rear. add new 1st and 2nd floor decks & property line parapet walls at rear convert extg non-habitable 1st floor space | |
| Jan 24, 2020 | Never finaled issued Jan 2020, no final | 620 Junipero Serra Bl | remodel (e) kitchen and master bathroom. new appliances, cabinetry, finishes in kitchen, new halo led recessed lighting in kitchen and bath. new dual flush toto toilet, grohe fixtures in both. repair minor non-structural dryrot at shower pan. no change in exterior envelopeDetails
remodel (e) kitchen and master bathroom. new appliances, cabinetry, finishes in kitchen, new halo led recessed lighting in kitchen and bath. new dual flush toto toilet, grohe fixtures in both. repair minor non-structural dryrot at shower pan. no change in exterior envelope | $57,000 |
| Nov 26, 2019 | Completed final sign-off Feb 2020 | 1005 Baker St | revision to original pa #201804196815. changes to window 14 has been altered - window 16+17 has been added to scope.Details
revision to original pa #201804196815. changes to window 14 has been altered - window 16+17 has been added to scope. | |
| Apr 29, 2019 | Completed final sign-off Aug 2019 | 591 Buena Vista Ave West Av | installation of a new prefabricated heated spa at the rear yard of (e) sfd, including all necessary eletrical and plumbing.Details
installation of a new prefabricated heated spa at the rear yard of (e) sfd, including all necessary eletrical and plumbing. | $15,000 |
| Mar 15, 2019 | Completed final sign-off Nov 2020 | 347 Lexington St | rev to pa# 201802161542; to include decorative door vestibule and window trims, and front enrty door glass line panel.Details
rev to pa# 201802161542; to include decorative door vestibule and window trims, and front enrty door glass line panel. | $2,000 |
| Oct 18, 2018 | Completed final sign-off Jan 2025 | 933 Valencia St | add residential unit at recreation room. replace (e) front stair, (e) side gate. (e) ground floor doors & windows. add new door and windows.Details
add residential unit at recreation room. replace (e) front stair, (e) side gate. (e) ground floor doors & windows. add new door and windows. | $60,000 |
| Sep 12, 2018 | Completed final sign-off Oct 2021 | 324 Edna St | remove (e) 1st flr deck at rear. add (n) 1st & 2nd flr decks & property line parapet walls at rear. convert (e) non-habitable 1st flr space to habitable space. add (n) laundry rm. reconfigure (e) utility closet.Details
remove (e) 1st flr deck at rear. add (n) 1st & 2nd flr decks & property line parapet walls at rear. convert (e) non-habitable 1st flr space to habitable space. add (n) laundry rm. reconfigure (e) utility closet. | $131,000 |
| Apr 19, 2018 | Completed final sign-off Feb 2020 | 1005 Baker St | convert extg storage at rear of garage to conditioned bathrooms and bedrooms in additoin to removing wall between the extg stair to create a open communicating.Details
convert extg storage at rear of garage to conditioned bathrooms and bedrooms in additoin to removing wall between the extg stair to create a open communicating. | $230,000 |
| Feb 16, 2018 | Completed final sign-off Nov 2020 | 347 Lexington St | revision to pa 201609137594. reconstruct front facade including (n)windows and entry door. interior work for (n) single entry door and additional unit entries for other units in the building. work is to rectify sf planning notice of enforcement 2017004791 enf.Details
revision to pa 201609137594. reconstruct front facade including (n)windows and entry door. interior work for (n) single entry door and additional unit entries for other units in the building. work is to rectify sf planning notice of enforcement 2017004791 enf. | $65,000 |
| Oct 18, 2017 | Completed final sign-off Aug 2020 | 4368 17th St | recommencement and completion of work aproved under pa#2012-11-19-4528Details
recommencement and completion of work aproved under pa#2012-11-19-4528 | $50,000 |
| Aug 1, 2017 | Completed final sign-off Aug 2017 | 544 Noe St | revision to pa 2016-0603-9079 reduce scope of work, not creating laundry alcove in (e) garageDetails
revision to pa 2016-0603-9079 reduce scope of work, not creating laundry alcove in (e) garage | |
| Oct 3, 2016 | Completed final sign-off Nov 2020 | 349 Lexington St | units 347 & 349: interior work only, remodel kitchen and bath at upper unit - 347. remodel bath at middle unit - 349. partial seismic upgradeDetails
units 347 & 349: interior work only, remodel kitchen and bath at upper unit - 347. remodel bath at middle unit - 349. partial seismic upgrade | $25,000 |
| Sep 13, 2016 | Completed final sign-off Nov 2020 | 349 Lexington St | lightwell infill at blank neighbor's wall. new skylights at flat roof. replacement windows at front facade, new sliding glass door at rear of bld.Details
lightwell infill at blank neighbor's wall. new skylights at flat roof. replacement windows at front facade, new sliding glass door at rear of bld. | $55,000 |
| Aug 16, 2016 | Completed final sign-off Aug 2017 | 542 Noe St | revision to 201603041223; increase scope of work: bath remodel (3rd flr)Details
revision to 201603041223; increase scope of work: bath remodel (3rd flr) | $7,000 |
| Jun 8, 2016 | Expired or cancelled expired Apr 2024 | 933 Valencia St | side expansion of 2nd floor bay and enclosure of porch. relocation of 2nd floor star and construction of solid firewall. interior remodel of 2nd floor and replacement of existing frontside gate. all work approved per acoa 2019.0422 and separate bldg permit: 201810183599Details
side expansion of 2nd floor bay and enclosure of porch. relocation of 2nd floor star and construction of solid firewall. interior remodel of 2nd floor and replacement of existing frontside gate. all work approved per acoa 2019.0422 and separate bldg permit: 201810183599 | $35,000 |