Living Structure Inc
- Based in
- Novato
- On San Francisco permits
- Jun 2016 to Aug 2021
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 75 days from filing to permit and 607 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2020 | Completed final sign-off Mar 2022 | 620 Junipero Serra Bl | remodel & reconfigure bedrooms, replace all windows in kind (st facing custom painted wood to match), upgrade non-compliant stair to lower level, remodel kitchen & bathrooms, voluntary seismic strengthening. no change in bldg envelope.Details
remodel & reconfigure bedrooms, replace all windows in kind (st facing custom painted wood to match), upgrade non-compliant stair to lower level, remodel kitchen & bathrooms, voluntary seismic strengthening. no change in bldg envelope. | $195,000 |
| Oct 18, 2018 | Completed final sign-off Jan 2025 | 933 Valencia St | add residential unit at recreation room. replace (e) front stair, (e) side gate. (e) ground floor doors & windows. add new door and windows.Details
add residential unit at recreation room. replace (e) front stair, (e) side gate. (e) ground floor doors & windows. add new door and windows. | $60,000 |
| Apr 19, 2018 | Completed final sign-off Feb 2020 | 1005 Baker St | convert extg storage at rear of garage to conditioned bathrooms and bedrooms in additoin to removing wall between the extg stair to create a open communicating.Details
convert extg storage at rear of garage to conditioned bathrooms and bedrooms in additoin to removing wall between the extg stair to create a open communicating. | $230,000 |