Back to kitchen remodel contractors
Living Structure Inc
- Based in
- Novato
- On San Francisco permits
- Jun 2016 to Aug 2021
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 59 days from filing to permit and 988 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2020 | Completed final sign-off Mar 2022 | 620 Junipero Serra Bl | remodel & reconfigure bedrooms, replace all windows in kind (st facing custom painted wood to match), upgrade non-compliant stair to lower level, remodel kitchen & bathrooms, voluntary seismic strengthening. no change in bldg envelope.Details
remodel & reconfigure bedrooms, replace all windows in kind (st facing custom painted wood to match), upgrade non-compliant stair to lower level, remodel kitchen & bathrooms, voluntary seismic strengthening. no change in bldg envelope. | $195,000 |
| Jan 24, 2020 | Never finaled issued Jan 2020, no final | 620 Junipero Serra Bl | remodel (e) kitchen and master bathroom. new appliances, cabinetry, finishes in kitchen, new halo led recessed lighting in kitchen and bath. new dual flush toto toilet, grohe fixtures in both. repair minor non-structural dryrot at shower pan. no change in exterior envelopeDetails
remodel (e) kitchen and master bathroom. new appliances, cabinetry, finishes in kitchen, new halo led recessed lighting in kitchen and bath. new dual flush toto toilet, grohe fixtures in both. repair minor non-structural dryrot at shower pan. no change in exterior envelope | $57,000 |
| Oct 3, 2016 | Completed final sign-off Nov 2020 | 349 Lexington St | units 347 & 349: interior work only, remodel kitchen and bath at upper unit - 347. remodel bath at middle unit - 349. partial seismic upgradeDetails
units 347 & 349: interior work only, remodel kitchen and bath at upper unit - 347. remodel bath at middle unit - 349. partial seismic upgrade | $25,000 |