Jane Martin
- Listed as
- architect, designer
- Firm
- Shift Design Studio
- Based in
- San Francisco
- On San Francisco permits
- Jun 2011 to Jun 2023
28 permits since 2000 (architect on 27 permits, designer on 1 permit): 18 completed, 5 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2023 | Completed final sign-off Jan 2024 | 1853 Jones St | Wilkinson Preservation Fine Home Mainten | revised plans - make the elevator bigger. ref pa 202210275276Details
revised plans - make the elevator bigger. ref pa 202210275276 | $8,000 |
| Oct 27, 2022 | Completed final sign-off Jan 2025 | 1853 Jones St | Wilkinson Preservation Fine Home Mainten | install new residential elevator at existing secondary stairwell. elevator to serve 3 floors only: garage, second, third floors. all work within existing building envelope.Details
install new residential elevator at existing secondary stairwell. elevator to serve 3 floors only: garage, second, third floors. all work within existing building envelope. | $75,000 |
| Oct 18, 2018 | Completed final sign-off Jan 2025 | 933 Valencia St | Prospect Construction Inc, Living Structure Inc | add residential unit at recreation room. replace (e) front stair, (e) side gate. (e) ground floor doors & windows. add new door and windows.Details
add residential unit at recreation room. replace (e) front stair, (e) side gate. (e) ground floor doors & windows. add new door and windows. | $60,000 |
| Aug 1, 2018 | Completed final sign-off Feb 2019 | 1186 Valencia St | Nest Building | ti- interior partitions, sinks, janitor closet. no exterior workDetails
ti- interior partitions, sinks, janitor closet. no exterior work | $40,000 |
| Jul 31, 2018 | Completed final sign-off Jun 2021 | 1722 Quint St | Chl Construction Company | renovate (e) sfd, remodel entry, 1st flr, 2nf lr, bedrooms, bathrooms, kitchen , dining, living rm. enclose open air stairs at (e) entry. add bathroom, add media rm, add skylights. replace all windows, doors and gate. no work at rear yard landscape, patio or 2nd flr deckDetails
renovate (e) sfd, remodel entry, 1st flr, 2nf lr, bedrooms, bathrooms, kitchen , dining, living rm. enclose open air stairs at (e) entry. add bathroom, add media rm, add skylights. replace all windows, doors and gate. no work at rear yard landscape, patio or 2nd flr deck | $300,000 |
| Jul 20, 2018 | Never finaled issued Jan 2019, no final | 277 Marietta Dr | relocate extg stairs to basement from 1st floor. 2 new bedrooms and bathroom at extg basement. relocate e back stairs to rear yardDetails
relocate extg stairs to basement from 1st floor. 2 new bedrooms and bathroom at extg basement. relocate e back stairs to rear yard | $60,000 | |
| Apr 20, 2018 | Expired or cancelled withdrawn Aug 2018 | 152 22nd Av | residential remodel to include, reconfigure & enclose (e) stairs garage to 1st fl. renovate (e) kitchen & powder room, renovate 2nd fl bath,add washer/dryer.convert(e) attic to bedroom suite with roof deck above (e) 2nd fl sun room, (n) roof over back portion of 3r fl(not visible from st)Details
residential remodel to include, reconfigure & enclose (e) stairs garage to 1st fl. renovate (e) kitchen & powder room, renovate 2nd fl bath,add washer/dryer.convert(e) attic to bedroom suite with roof deck above (e) 2nd fl sun room, (n) roof over back portion of 3r fl(not visible from st) | $150,000 | |
| Apr 20, 2018 | Completed final sign-off Jun 2021 | 338 Jersey St | Wolfe Painting Co | renovate a protion of the (e) 1st flr apartment, including bathromm, kitchen, closets and interior partitions. relocate (e) bathroom and add window at bathroom (not visible from street) relocate and widen (e) exterior back door. remove (e) exterior door at bedroom. relocate (e) w/d. ele/plm sep prDetails
renovate a protion of the (e) 1st flr apartment, including bathromm, kitchen, closets and interior partitions. relocate (e) bathroom and add window at bathroom (not visible from street) relocate and widen (e) exterior back door. remove (e) exterior door at bedroom. relocate (e) w/d. ele/plm sep pr | $80,000 |
| Apr 20, 2018 | Completed final sign-off Oct 2018 | 297 Addison St | Matarozzi/Pelsinger Builders Inc. | residential remodel to include: add 1/2 bathroom at (e) stroage rm, widen (e) interior door at (e) bedroom. add closet at (e) bedroom, add opening with railing at (e) back yard deck, replace (e) extior steps with ramp. plm/ele by sep permitDetails
residential remodel to include: add 1/2 bathroom at (e) stroage rm, widen (e) interior door at (e) bedroom. add closet at (e) bedroom, add opening with railing at (e) back yard deck, replace (e) extior steps with ramp. plm/ele by sep permit | $80,000 |
| Dec 15, 2017 | Completed final sign-off Jan 2018 | 4343 03rd St | City Homes Construction Inc | electrical lighting plan and title 24 for 201708144735. maher naDetails
electrical lighting plan and title 24 for 201708144735. maher na | |
| Aug 16, 2017 | Completed final sign-off Jan 2019 | 2320 Bryant St | Bay Building Structures Inc | replace extg foundation. reconfigure extg interior stair between levels. convert extg 693 sq ft at garage level to conditioned space. add 1 bathroom and add 1 bedroom.Details
replace extg foundation. reconfigure extg interior stair between levels. convert extg 693 sq ft at garage level to conditioned space. add 1 bathroom and add 1 bedroom. | $80,000 |
| Aug 14, 2017 | Completed final sign-off Jan 2018 | 4343 03rd St | City Homes Construction Inc | tenant improvement new partial height partitions, install 2 new sinks, 7 spa chair, plumb/elec sep permits. maher n/aDetails
tenant improvement new partial height partitions, install 2 new sinks, 7 spa chair, plumb/elec sep permits. maher n/a | $10,000 |
| Jul 12, 2017 | Completed final sign-off Oct 2018 | 2717 Harrison St | repair and renovate existing stairs front exteriorDetails
repair and renovate existing stairs front exterior | $10,000 | |
| Nov 4, 2016 | Completed final sign-off Jul 2017 | 50 Burnside Av | Rich Armusewicz Construction | replace extg garage door with window, replace extg balcony with landing and spiral stair at back yard. replace extg int. stair, replace extg ground floor bathroom, new bedroom at ground floor. new 1 hour separation at extg garage.Details
replace extg garage door with window, replace extg balcony with landing and spiral stair at back yard. replace extg int. stair, replace extg ground floor bathroom, new bedroom at ground floor. new 1 hour separation at extg garage. | $25,000 |
| Nov 4, 2016 | Expired or cancelled cancelled Jan 2026 | 4424 Ulloa St | replace extg interior stairs, new bedroom and new bathroom at ground floor. replace extg door to rear yard change extg window to door at rear yard, new 1 hour enclosure at extg garage.Details
replace extg interior stairs, new bedroom and new bathroom at ground floor. replace extg door to rear yard change extg window to door at rear yard, new 1 hour enclosure at extg garage. | $25,000 | |
| Sep 13, 2016 | Expired or cancelled cancelled Jan 2026 | 101 Vicente St | accessibility compliance work only. modify extg entry, stairs and landings. add accessibilty lift.Details
accessibility compliance work only. modify extg entry, stairs and landings. add accessibilty lift. | $20,000 | |
| Mar 14, 2016 | Never finaled issued Jan 2017, no final | 937 Valencia St | exterior front garden wall work only, reduce extent of (e) garden wall.Details
exterior front garden wall work only, reduce extent of (e) garden wall. | $800 | |
| Oct 2, 2015 | Completed final sign-off Jul 2016 | 2130 Steiner St | repair deck and railing at existing top of garage. bijon wood decking, less than 50% repair. new railing at roof access at roof of 3 story bldg, voluntary structural upgrage at existing garageDetails
repair deck and railing at existing top of garage. bijon wood decking, less than 50% repair. new railing at roof access at roof of 3 story bldg, voluntary structural upgrage at existing garage | $10,000 | |
| Jun 8, 2015 | Never finaled issued Sep 2015, no final | 36 Macondray Ln | Boivin Environmental | replace roof deck solid guardrail with glass guardrail. replace section of (e) guardrail.Details
replace roof deck solid guardrail with glass guardrail. replace section of (e) guardrail. | $5,000 |
| Apr 1, 2015 | Never finaled issued Apr 2015, no final | 3375 21st St | Boivin Environmental | #3- demolish interior partitions per plan, demo ktichen chimney, patch at roof, relocate existing kitchen, reconfigure area of ceiling per plan, relocate existing ceiling lens, construct new interior partition per plan, relocate existing lavatory (sink only).Details
#3- demolish interior partitions per plan, demo ktichen chimney, patch at roof, relocate existing kitchen, reconfigure area of ceiling per plan, relocate existing ceiling lens, construct new interior partition per plan, relocate existing lavatory (sink only). | $40,000 |
| Dec 5, 2014 | Never finaled issued Jun 2015, no final | 1456 Hampshire St | Mulhall Construction Inc. | revision to 201407080749; add 106 square feet at ground floor, relocate (e) stair.Details
revision to 201407080749; add 106 square feet at ground floor, relocate (e) stair. | $15,000 |
| Sep 12, 2014 | Completed final sign-off Jul 2015 | 96 Gough St | cafe use in pet shop. no construction under this permit. all construction under pa# 2014/09/12/6226. n/a for maher ordinance.Details
cafe use in pet shop. no construction under this permit. all construction under pa# 2014/09/12/6226. n/a for maher ordinance. | ||
| Aug 5, 2014 | Expired or cancelled withdrawn Aug 2015 | 2495 Harrison St | interior partition to create 2nd bedroom, replace 3 existing windows, replace 2 existing doors; maher n/aDetails
interior partition to create 2nd bedroom, replace 3 existing windows, replace 2 existing doors; maher n/a | $4,000 | |
| Jul 3, 2014 | Completed final sign-off Oct 2014 | 424 Gold Mine Dr | Reilly Construction Inc | renovate existing bathroomDetails
renovate existing bathroom | $15,000 |
| May 7, 2013 | Completed final sign-off Aug 2013 | 2733 Harrison St | The Construction Guy | residential kitchen remodel, replace existing lightwell window, replace existing back door.Details
residential kitchen remodel, replace existing lightwell window, replace existing back door. | $20,000 |
| Nov 15, 2012 | Completed final sign-off Mar 2016 | 383 Fair Oaks St | Bonilla Construction | to comply with nov# 201102941, nov# 201197026 & nov# 200990223. remodel 1st & 2nd floor.(kitchen, bathroom, add closets) add 2nd residential unit @ garden level. demo (e) deck & stairs @ rear yard. horizontal addition @ garden level & 1st floor. (n) decks & stairs @ rear yard.Details
to comply with nov# 201102941, nov# 201197026 & nov# 200990223. remodel 1st & 2nd floor.(kitchen, bathroom, add closets) add 2nd residential unit @ garden level. demo (e) deck & stairs @ rear yard. horizontal addition @ garden level & 1st floor. (n) decks & stairs @ rear yard. | $200,000 |
| Jun 17, 2011 | Expired or cancelled cancelled Jan 2026 | 3010 20th St | unit #3010b-tenant improvement-new wholesale bakery, interior only to include kitchens (2) with accessory retailDetails
unit #3010b-tenant improvement-new wholesale bakery, interior only to include kitchens (2) with accessory retail | $50,000 | |
| Jun 6, 2011 | Completed final sign-off Jun 2012 | 937 Valencia St | Bonilla Construction | exterior work only: replace (e) north stair, relocate/replace (e) south stair, replace (e) side gate & (e) garage door.Details
exterior work only: replace (e) north stair, relocate/replace (e) south stair, replace (e) side gate & (e) garage door. | $18,000 |