Reilly Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Dec 2020
- Last 24 months
- 0 permits filed
22 permits since 2000: 14 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2020 | Completed final sign-off Mar 2021 | 461 Urbano Dr | replace dry rot beam and post at lower level.Details
replace dry rot beam and post at lower level. | $10,000 |
| Nov 10, 2020 | Completed final sign-off Mar 2021 | 2978 Folsom St | 1st fl: remove walls between great room.Details
1st fl: remove walls between great room. | $3,600 |
| Sep 3, 2019 | Completed final sign-off Sep 2019 | 331 27th Av | to obtain final inspeciton for work approved under pa # 201608296264. all work is complete.Details
to obtain final inspeciton for work approved under pa # 201608296264. all work is complete. | |
| Jan 4, 2019 | Completed final sign-off Apr 2019 | 1335 Union St | unit#10 - comply w/ nov # 201803280; (1) kitchen & (1) bath remodel, (1) new window, larger window to replace (e) and remove (1) window wall and built inDetails
unit#10 - comply w/ nov # 201803280; (1) kitchen & (1) bath remodel, (1) new window, larger window to replace (e) and remove (1) window wall and built in | $30,000 |
| Apr 26, 2018 | Completed final sign-off Aug 2018 | 1318 York St | replace kitchen cabinets & counter tops. upgrade electrical to current codeDetails
replace kitchen cabinets & counter tops. upgrade electrical to current code | $20,000 |
| Dec 19, 2017 | Completed final sign-off Dec 2017 | 1601 Castro St | to obtain final inspection for work approved under pa #201507272526 and 201507272525. all work is complete.Details
to obtain final inspection for work approved under pa #201507272526 and 201507272525. all work is complete. | |
| Mar 15, 2017 | Completed final sign-off May 2017 | 357 Haight St | 50 % or less dry rot repair. replace some damaged handrails and damaged threads and risers.Details
50 % or less dry rot repair. replace some damaged handrails and damaged threads and risers. | $3,000 |
| Feb 10, 2017 | Completed final sign-off Mar 2019 | 1532 Church St | foundation & seismic upgrade, excavation for ftg.re configure (e) master bd rm to (n) dining rm. (n) internal stair. vertical addition at 3rd flr, 3 bed rooms, 2 full baths, washing dry,(n) roof & (2) skylights, construct (n) south 3 ft x 12 lightwell.Details
foundation & seismic upgrade, excavation for ftg.re configure (e) master bd rm to (n) dining rm. (n) internal stair. vertical addition at 3rd flr, 3 bed rooms, 2 full baths, washing dry,(n) roof & (2) skylights, construct (n) south 3 ft x 12 lightwell. | $200,000 |
| Mar 8, 2016 | Completed final sign-off Jul 2018 | 78 Havelock St | build out attic space to become habitable space including fam room & full bath w/skylight). new dormer up roof at rear. build out basement/garage to become finished space w/full bath, new storage space/art room. add interior stairways. remodel bath & laundry room @ 2nd floor.Details
build out attic space to become habitable space including fam room & full bath w/skylight). new dormer up roof at rear. build out basement/garage to become finished space w/full bath, new storage space/art room. add interior stairways. remodel bath & laundry room @ 2nd floor. | $200,000 |
| Jul 27, 2015 | Expired or cancelled expired Mar 2026 | 1601 Castro St | soft story retrofit work to comly with sfbc chapter using 2012 iebc appendix a-4. full ada compliance of retail space under app#201507171786Details
soft story retrofit work to comly with sfbc chapter using 2012 iebc appendix a-4. full ada compliance of retail space under app#201507171786 | $40,000 |
| Jul 27, 2015 | Expired or cancelled expired Mar 2026 | 1601 Castro St | soft story retrofit work to comly with sfbc chapter using 2012 iebc appendix a-4. full ada compliance of retail space under app# 201507171786.Details
soft story retrofit work to comly with sfbc chapter using 2012 iebc appendix a-4. full ada compliance of retail space under app# 201507171786. | $20,000 |
| Mar 19, 2015 | Never finaled issued Mar 2015, no final | 331 West Portal Av | inkind repair/replacement of aluminimum storefront system (window, door) and portion of brick siding due to a smash-and-grab robberyDetails
inkind repair/replacement of aluminimum storefront system (window, door) and portion of brick siding due to a smash-and-grab robbery | $5,000 |
| Feb 18, 2015 | Never finaled issued Feb 2015, no final | 1601 Castro St | exploratory demo. demo a dispose of lath and plaster on interior walls and ceilings. one room approx. 1000 sq ft. exterior walls of room only. no interior walls or structural walls . ceiling demo not to exceed 100 sqft, wall demo not to exceed 100 sq ft.Details
exploratory demo. demo a dispose of lath and plaster on interior walls and ceilings. one room approx. 1000 sq ft. exterior walls of room only. no interior walls or structural walls . ceiling demo not to exceed 100 sqft, wall demo not to exceed 100 sq ft. | $1,200 |
| Jul 30, 2014 | Completed final sign-off Nov 2014 | 30 Macedonia St | remodel of kitchen and bath and adding new lights. high efficiency lights. no walls to be removed.Details
remodel of kitchen and bath and adding new lights. high efficiency lights. no walls to be removed. | $18,000 |
| Jul 3, 2014 | Completed final sign-off Oct 2014 | 424 Gold Mine Dr | renovate existing bathroomDetails
renovate existing bathroom | $15,000 |
| Jul 22, 2011 | Never finaled issued Jul 2011, no final | 298 Juanita Wy | install shower pan in remodeled bathroom.Details
install shower pan in remodeled bathroom. | $400 |
| Jul 22, 2011 | Never finaled issued Jul 2011, no final | 977 Dolores St | install shower pan in shower in the attic space room for exercise room above existing garage.Details
install shower pan in shower in the attic space room for exercise room above existing garage. | $400 |
| May 4, 2011 | Completed final sign-off Jul 2011 | 2199 Jackson St | repair and replace (e) roof joists at garage where roof deck is being replaced in kind. dry rot discovered in joists. existing roofing removed to repair damaged joists and will be replaced in kind with new roofing.Details
repair and replace (e) roof joists at garage where roof deck is being replaced in kind. dry rot discovered in joists. existing roofing removed to repair damaged joists and will be replaced in kind with new roofing. | $6,500 |
| May 4, 2011 | Completed final sign-off May 2011 | 2199 Jackson St | reroofing of garage roof adjacent to dwelling (private parking garage)Details
reroofing of garage roof adjacent to dwelling (private parking garage) | $5,000 |
| Jan 25, 2011 | Never finaled issued Jan 2011, no final | 757 Goettingen St | replace dryrot on (e) deck structure. less than 50% repair.Details
replace dryrot on (e) deck structure. less than 50% repair. | $3,800 |
| Dec 6, 2010 | Never finaled issued Dec 2010, no final | 185 Moffitt St | repair of rear deck due to dry rot. repair will be less than 50% of structure (no other work)Details
repair of rear deck due to dry rot. repair will be less than 50% of structure (no other work) | $1,800 |
| Mar 15, 2010 | Completed final sign-off Oct 2010 | 347 Presidio Av | file from "f" of barrier removal to clear the notice of accessibility violation compliance. upgrade front entry door, installl new commercial veritcal platform lifter, upgrade 1 (e) restroom to unisex access, repair or replace (e) steps for the vertical lifter spaceDetails
file from "f" of barrier removal to clear the notice of accessibility violation compliance. upgrade front entry door, installl new commercial veritcal platform lifter, upgrade 1 (e) restroom to unisex access, repair or replace (e) steps for the vertical lifter space | $13,200 |