Back to bathroom remodel contractors
Reilly Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Dec 2020
- Last 24 months
- 0 permits filed
22 permits since 2000: 14 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 13 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 4, 2019 | Completed final sign-off Apr 2019 | 1335 Union St | unit#10 - comply w/ nov # 201803280; (1) kitchen & (1) bath remodel, (1) new window, larger window to replace (e) and remove (1) window wall and built inDetails
unit#10 - comply w/ nov # 201803280; (1) kitchen & (1) bath remodel, (1) new window, larger window to replace (e) and remove (1) window wall and built in | $30,000 |
| Feb 10, 2017 | Completed final sign-off Mar 2019 | 1532 Church St | foundation & seismic upgrade, excavation for ftg.re configure (e) master bd rm to (n) dining rm. (n) internal stair. vertical addition at 3rd flr, 3 bed rooms, 2 full baths, washing dry,(n) roof & (2) skylights, construct (n) south 3 ft x 12 lightwell.Details
foundation & seismic upgrade, excavation for ftg.re configure (e) master bd rm to (n) dining rm. (n) internal stair. vertical addition at 3rd flr, 3 bed rooms, 2 full baths, washing dry,(n) roof & (2) skylights, construct (n) south 3 ft x 12 lightwell. | $200,000 |
| Mar 8, 2016 | Completed final sign-off Jul 2018 | 78 Havelock St | build out attic space to become habitable space including fam room & full bath w/skylight). new dormer up roof at rear. build out basement/garage to become finished space w/full bath, new storage space/art room. add interior stairways. remodel bath & laundry room @ 2nd floor.Details
build out attic space to become habitable space including fam room & full bath w/skylight). new dormer up roof at rear. build out basement/garage to become finished space w/full bath, new storage space/art room. add interior stairways. remodel bath & laundry room @ 2nd floor. | $200,000 |
| Jul 30, 2014 | Completed final sign-off Nov 2014 | 30 Macedonia St | remodel of kitchen and bath and adding new lights. high efficiency lights. no walls to be removed.Details
remodel of kitchen and bath and adding new lights. high efficiency lights. no walls to be removed. | $18,000 |
| Jul 3, 2014 | Completed final sign-off Oct 2014 | 424 Gold Mine Dr | renovate existing bathroomDetails
renovate existing bathroom | $15,000 |
| Jul 22, 2011 | Never finaled issued Jul 2011, no final | 298 Juanita Wy | install shower pan in remodeled bathroom.Details
install shower pan in remodeled bathroom. | $400 |