Reilly Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Dec 2020
- Last 24 months
- 0 permits filed
22 permits since 2000: 14 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 304 days from filing to permit and 512 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2017 | Completed final sign-off Mar 2019 | 1532 Church St | foundation & seismic upgrade, excavation for ftg.re configure (e) master bd rm to (n) dining rm. (n) internal stair. vertical addition at 3rd flr, 3 bed rooms, 2 full baths, washing dry,(n) roof & (2) skylights, construct (n) south 3 ft x 12 lightwell.Details
foundation & seismic upgrade, excavation for ftg.re configure (e) master bd rm to (n) dining rm. (n) internal stair. vertical addition at 3rd flr, 3 bed rooms, 2 full baths, washing dry,(n) roof & (2) skylights, construct (n) south 3 ft x 12 lightwell. | $200,000 |
| Mar 8, 2016 | Completed final sign-off Jul 2018 | 78 Havelock St | build out attic space to become habitable space including fam room & full bath w/skylight). new dormer up roof at rear. build out basement/garage to become finished space w/full bath, new storage space/art room. add interior stairways. remodel bath & laundry room @ 2nd floor.Details
build out attic space to become habitable space including fam room & full bath w/skylight). new dormer up roof at rear. build out basement/garage to become finished space w/full bath, new storage space/art room. add interior stairways. remodel bath & laundry room @ 2nd floor. | $200,000 |