Lam Chan
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Lam Engineering
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Feb 2014
48 permits since 2000 (engineer on 38 permits, architect on 6 permits, authorized agent-others on 2 permits, attorney on 1 permit, designer on 1 permit): 36 completed, 2 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 7, 2014 | Completed final sign-off Apr 2014 | 783 Clay St | Odysseus Builders | 1) relocate extg hand sink. 2)upgrade extg restroom t ada restroom.Details
1) relocate extg hand sink. 2)upgrade extg restroom t ada restroom. | $2,000 |
| Aug 29, 2013 | Completed final sign-off Jul 2014 | 72 Monterey Bl | reinforce existing foundation to comply with complaint# 201318061Details
reinforce existing foundation to comply with complaint# 201318061 | $8,000 | |
| Jul 23, 2013 | Completed final sign-off Jul 2014 | 72 Monterey Bl | extend (e) front staircase to 3rd floor, add 1 bathroom on 2nd floor. convert back staircase to bedrooms, demo back staircaseDetails
extend (e) front staircase to 3rd floor, add 1 bathroom on 2nd floor. convert back staircase to bedrooms, demo back staircase | $10,000 | |
| Jul 12, 2013 | Completed final sign-off Jul 2014 | 72 Monterey Bl | legalize ground level bedroom, office. add 2 bathrooms @ ground level, new staircase to ground level.Details
legalize ground level bedroom, office. add 2 bathrooms @ ground level, new staircase to ground level. | $40,000 | |
| Jul 9, 2013 | Completed final sign-off Aug 2015 | 2963 California St | Double Woods Construction | interior remodel only. 1)relocate kitchen to ground floor. new bedroom at 2nd floor. 2) add 2 bed room. one bath, one study room at ground floor.Details
interior remodel only. 1)relocate kitchen to ground floor. new bedroom at 2nd floor. 2) add 2 bed room. one bath, one study room at ground floor. | $110,000 |
| May 21, 2013 | Completed final sign-off Apr 2015 | 2040 15th Av | Forest Building Construction | kitchen remodel, legalize upstairs half bathroom, new staircase to basement, legalize basement-1 bedroom, 1 office & 1 bathroomDetails
kitchen remodel, legalize upstairs half bathroom, new staircase to basement, legalize basement-1 bedroom, 1 office & 1 bathroom | $15,000 |
| Mar 14, 2013 | Completed final sign-off Oct 2013 | 1419 Polk St | Hammerhead General Contractors Inc. | non structural interior remodel. barrier removal - new automatic door. new ada restroom. change use from book store to hair salon.Details
non structural interior remodel. barrier removal - new automatic door. new ada restroom. change use from book store to hair salon. | $12,000 |
| Apr 18, 2012 | Completed final sign-off Mar 2013 | 3226 Anza St | Forest Building Construction | add 1 bedroom, 1 bath at ground level. remodel kitchen, bathroom, and add 2nd bathroom at 2nd floorDetails
add 1 bedroom, 1 bath at ground level. remodel kitchen, bathroom, and add 2nd bathroom at 2nd floor | $10,000 |
| Apr 2, 2012 | Completed final sign-off Jul 2012 | 1802 Divisadero St | H Construction Co | barrier removal to comply with ada requirement for front entrance and ada restroom.Details
barrier removal to comply with ada requirement for front entrance and ada restroom. | $10,000 |
| Mar 5, 2012 | Expired or cancelled cancelled Nov 2024 | 10 Aptos Av | erect three story single family house.Details
erect three story single family house. | $800,000 | |
| Mar 1, 2012 | Expired or cancelled cancelled Feb 2024 | 500 Dellbrook Av | two stories addition at the rear. add 1 exercise room and 1 entertainment room.Details
two stories addition at the rear. add 1 exercise room and 1 entertainment room. | $70,000 | |
| Feb 2, 2012 | Completed final sign-off Nov 2012 | 732 Jackson St | S M I Construction Inc. | painting & install ada accessible front counter, repair (e) leaking plumbing fixtures, repair (e) hood canopy by patching etc., upgrade 1-3 compartment sinks, 1-2 compartment sink & add 5 hand sinksDetails
painting & install ada accessible front counter, repair (e) leaking plumbing fixtures, repair (e) hood canopy by patching etc., upgrade 1-3 compartment sinks, 1-2 compartment sink & add 5 hand sinks | $3,850 |
| Aug 19, 2011 | Expired or cancelled cancelled Nov 2024 | 636 Broadway | vertical & horizontal addition to existing build. new addition floor area 300 sq ft.Details
vertical & horizontal addition to existing build. new addition floor area 300 sq ft. | $400,000 | |
| Jul 13, 2011 | Completed final sign-off Nov 2011 | 1824 Divisadero St | Le's Plumbing & Construction | ada restroom upgrade, ada front entrance for nail salon. no change of use. barrier removal only.Details
ada restroom upgrade, ada front entrance for nail salon. no change of use. barrier removal only. | $12,000 |
| Jul 11, 2011 | Completed final sign-off Oct 2011 | 1720 Alemany Bl | New Improvement Construction | add one bedroom. legalize one existing bath and change existing utility room to new game room on proposed ground floor.Details
add one bedroom. legalize one existing bath and change existing utility room to new game room on proposed ground floor. | $25,000 |
| Jun 2, 2011 | Expired or cancelled expired Sep 2024 | 2882 Geary Bl | Amherst Associates Const, Forest Building Construction | conversion of two existing office into two residential apartment unit, unit #1 1,499 sq ft, unit #2 527 sq ft. under separate permit for installing fire sprinkler system for the entire building pa# 2013/07/05/1236.Details
conversion of two existing office into two residential apartment unit, unit #1 1,499 sq ft, unit #2 527 sq ft. under separate permit for installing fire sprinkler system for the entire building pa# 2013/07/05/1236. | $20,000 |
| Mar 11, 2011 | Completed final sign-off Dec 2011 | 76 Tioga Av | Alex Painting & Construction | interior remodel-add 1 bedroom & 1 bathroom at ground floor, removed (e) bathroom at 2nd floor & add 1 new bathroom & 1 bedroom at 2nd floor. add 1 bathroom at 3rd floor, repair exterior stuccoDetails
interior remodel-add 1 bedroom & 1 bathroom at ground floor, removed (e) bathroom at 2nd floor & add 1 new bathroom & 1 bedroom at 2nd floor. add 1 bathroom at 3rd floor, repair exterior stucco | $20,000 |
| Feb 9, 2011 | Expired or cancelled cancelled Jan 2026 | 76 Tioga Av | add one bedroom & 1 bathroom at ground floor; remove existing bath at 2nd floor & add 1 new bath & 1 bedroom at 2nd floor; add one bathroom at 3rd floor; repair exterior stucco.Details
add one bedroom & 1 bathroom at ground floor; remove existing bath at 2nd floor & add 1 new bath & 1 bedroom at 2nd floor; add one bathroom at 3rd floor; repair exterior stucco. | $20,000 | |
| Jan 10, 2011 | Completed final sign-off Oct 2011 | 1034 Potrero Av | add a gym room and 1/2 bath room at garage floor per plan. retain (e) four parking spaces in garage.Details
add a gym room and 1/2 bath room at garage floor per plan. retain (e) four parking spaces in garage. | $15,000 | |
| Nov 22, 2010 | Completed final sign-off Jun 2013 | 1863 42nd Av | 2-story horizontal rear addition of the (e) house. new addition w/ 2 bedrooms, & game room, 1 full bath at ground floors. 2 bedrooms, 1 full bath & 1 home office w/ full bath at 2nd floor.Details
2-story horizontal rear addition of the (e) house. new addition w/ 2 bedrooms, & game room, 1 full bath at ground floors. 2 bedrooms, 1 full bath & 1 home office w/ full bath at 2nd floor. | $120,000 | |
| Oct 18, 2010 | Completed final sign-off Mar 2015 | 439 Judah St | Jb Builders | unit 439: add 1 new game room and 1 new bath on proposed gr floor. relocate e kitchen, bath, and bedroom at 2nd fl, add 1 bedroom at 2nd floor. 441 relocate bath at 3rd fl. new skylightDetails
unit 439: add 1 new game room and 1 new bath on proposed gr floor. relocate e kitchen, bath, and bedroom at 2nd fl, add 1 bedroom at 2nd floor. 441 relocate bath at 3rd fl. new skylight | $20,000 |
| Oct 12, 2010 | Expired or cancelled withdrawn Feb 2012 | 76 Tioga Av | 1. three stories horizontal addition to rear of the (e) building. total addition area is 2649 sq ft. 2. remove one storage room at the (e) 2nd floor.Details
1. three stories horizontal addition to rear of the (e) building. total addition area is 2649 sq ft. 2. remove one storage room at the (e) 2nd floor. | $200,000 | |
| Sep 2, 2010 | Completed final sign-off Nov 2010 | 1714 Ulloa St | new deck at the rear of the building, 15' x 7'Details
new deck at the rear of the building, 15' x 7' | $10,000 | |
| Aug 25, 2010 | Completed final sign-off Jan 2011 | 2023 Polk St | interior remodel. no commercial use , only storage rooms at first/street level. relocate (e) windows at rear. add brace wall and replace (e) beam at 1st to 4th floor. repair damaged rear stair case less than 50%Details
interior remodel. no commercial use , only storage rooms at first/street level. relocate (e) windows at rear. add brace wall and replace (e) beam at 1st to 4th floor. repair damaged rear stair case less than 50% | $30,000 | |
| Jun 30, 2010 | Completed final sign-off Aug 2013 | 234 Pope St | to comply with complaint# 201040699. 1 story horizontal addition to rear of the (e) building. total additon area approx 153.37 sq. ft. removed 1 (e) bedroom on (e) 2nd floor. add 1 family room on proposed 2nd floor.Details
to comply with complaint# 201040699. 1 story horizontal addition to rear of the (e) building. total additon area approx 153.37 sq. ft. removed 1 (e) bedroom on (e) 2nd floor. add 1 family room on proposed 2nd floor. | $20,000 | |
| Jun 28, 2010 | Completed final sign-off Apr 2012 | 950 Plymouth Av | Forest Building Construction | two stories horizontal addition to rear of the exsiting building total. addition area is 457 sf. remove one bathroom @ the exsting 2nd floor.Details
two stories horizontal addition to rear of the exsiting building total. addition area is 457 sf. remove one bathroom @ the exsting 2nd floor. | $60,000 |
| Jun 21, 2010 | Expired or cancelled withdrawn Feb 2021 | 3143 24th St | erect 3 units condominium 5 stories with commercial.Details
erect 3 units condominium 5 stories with commercial. | $300,000 | |
| Jun 15, 2010 | Completed final sign-off Oct 2010 | 34 Colby St | Modern Construction Inc | remove (e) half bath at garage floor. add two full bath rooms, and a family room at garage floor. no work done at 2nd floorDetails
remove (e) half bath at garage floor. add two full bath rooms, and a family room at garage floor. no work done at 2nd floor | $40,000 |
| May 5, 2010 | Completed final sign-off Jul 2010 | 545 Randolph St | Sun Wu Liu Dba Golden Wu Construction In | interior remodel, add two bedrooms & one full bath at the proposed ground floor. relcoate the water heater at the proposed ground floor.Details
interior remodel, add two bedrooms & one full bath at the proposed ground floor. relcoate the water heater at the proposed ground floor. | $30,000 |
| May 5, 2010 | Completed final sign-off Apr 2011 | 843 Grant Av | Yu Kwan Construction Co. | revise the previous approved drawing app.#201003097864. change the (e) front entry design per plan.Details
revise the previous approved drawing app.#201003097864. change the (e) front entry design per plan. | $1,000 |
| Apr 22, 2010 | Completed final sign-off Sep 2010 | 521 Gates St | Forest Building Construction | repair (e) wood w/ (n) 2x4 stud wall on 1st. flr. & 2nd. flr. remove (e) flr. jst. & replace (n) 2x12 flr. jst. on 1st. flr. replace 1st. flr. w/ 3/4" t & g plywood. install (n) shear wall on 1st. flr. revision to appl.#201003319406.Details
repair (e) wood w/ (n) 2x4 stud wall on 1st. flr. & 2nd. flr. remove (e) flr. jst. & replace (n) 2x12 flr. jst. on 1st. flr. replace 1st. flr. w/ 3/4" t & g plywood. install (n) shear wall on 1st. flr. revision to appl.#201003319406. | $5,000 |
| Apr 20, 2010 | Expired or cancelled expired May 2023 | 45 Broadmoor Dr | 3 story horizontal addition to rear & side of the (e)building. extend (e) kitchen & add 1 new powder room on proposed 1st floor. extend (e) master bedroom & add 1 new office on proposed 3rd floor. excavate the basement/craw space from 4' ceiling to 9'. add bath at 1st floor & replace all (e) windowsDetails
3 story horizontal addition to rear & side of the (e)building. extend (e) kitchen & add 1 new powder room on proposed 1st floor. extend (e) master bedroom & add 1 new office on proposed 3rd floor. excavate the basement/craw space from 4' ceiling to 9'. add bath at 1st floor & replace all (e) windows | $50,000 | |
| Jan 4, 2010 | Never finaled filed Jan 2010, never issued | 1863 42nd Av | 2-story horizontal rear addition of the (e) house. new addition with 2 bedrooms, 1 game room, 1 full bath at ground floor; 2 bedrooms, 1 full bath & 1 home office with full bath at 2nd floor.Details
2-story horizontal rear addition of the (e) house. new addition with 2 bedrooms, 1 game room, 1 full bath at ground floor; 2 bedrooms, 1 full bath & 1 home office with full bath at 2nd floor. | $120,000 | |
| Dec 24, 2009 | Completed final sign-off Sep 2010 | 2806 Van Ness Av | Forest Building Construction | comply with nov 200923248. interior remodel. add 2 new bedrooms & closets at 4th floor. legalize bedrooms, home office at garage fl. add 11/2 baths at garage floor. no exterior change.Details
comply with nov 200923248. interior remodel. add 2 new bedrooms & closets at 4th floor. legalize bedrooms, home office at garage fl. add 11/2 baths at garage floor. no exterior change. | $16,000 |
| Dec 2, 2009 | Completed final sign-off Apr 2010 | 412 University St | Forest Building Construction | add 1 full bath at 2nd floor ( above garage/first floor)Details
add 1 full bath at 2nd floor ( above garage/first floor) | $6,000 |
| Jul 13, 2009 | Completed final sign-off Jun 2010 | 521 Gates St | Forest Building Construction | shoring design: fir replacement of (e) foundation.Details
shoring design: fir replacement of (e) foundation. | $10,000 |
| Jul 1, 2009 | Completed final sign-off Dec 2009 | 2211 25th Av | Forest Building Construction | interior remodel: add 2 new bedroom, 1 new bath, 1 game room at 1st floor; remofel (e) bath at 2nd floor & add 1 new bath at 2nd floor.Details
interior remodel: add 2 new bedroom, 1 new bath, 1 game room at 1st floor; remofel (e) bath at 2nd floor & add 1 new bath at 2nd floor. | $20,000 |
| Jun 12, 2009 | Completed final sign-off Apr 2010 | 527 Brunswick St | replace existing foundation at the rear of house.Details
replace existing foundation at the rear of house. | $10,000 | |
| May 28, 2009 | Completed final sign-off May 2010 | 500 Dellbrook Av | Forest Building Construction | tile existing upstair bathroom, paint upstair bedroom & living room, resurface (e) upstair hardwood floor.Details
tile existing upstair bathroom, paint upstair bedroom & living room, resurface (e) upstair hardwood floor. | $2,000 |
| May 15, 2009 | Completed final sign-off Jun 2013 | 712 08th Av | John Jin Hang Wai | horizontal rear addition of 3 story of the house including (1) family room, (3) bedrooms, (3) bathrooms, (2) offices, (1) study room & (1) play room.Details
horizontal rear addition of 3 story of the house including (1) family room, (3) bedrooms, (3) bathrooms, (2) offices, (1) study room & (1) play room. | $250,000 |
| May 6, 2009 | Expired or cancelled cancelled Aug 2022 | 238 Silver Av | install new washer/dry at rear of house, provid cover for the washer/dryer.Details
install new washer/dry at rear of house, provid cover for the washer/dryer. | $1,000 | |
| Feb 4, 2009 | Completed final sign-off Apr 2009 | 238 Silver Av | Forest Building Construction | to comply w/n.o.v. #200987720, #200988226, #200987701, #200987702, #200988311, remove stove, accessories, blocked area, garage 1 illegal kitchen & bathroom.Details
to comply w/n.o.v. #200987720, #200988226, #200987701, #200987702, #200988311, remove stove, accessories, blocked area, garage 1 illegal kitchen & bathroom. | $800 |
| Jan 8, 2009 | Completed final sign-off Oct 2009 | 155 Vernon St | add one bedroom, one office, two full bathrooms in existing garage level, enlarge rear windows.Details
add one bedroom, one office, two full bathrooms in existing garage level, enlarge rear windows. | $40,000 | |
| Dec 3, 2008 | Completed final sign-off Jan 2010 | 234 Pope St | repair & replace (e) foundation. install new anchor bolts, new concrete slab in basementDetails
repair & replace (e) foundation. install new anchor bolts, new concrete slab in basement | $20,000 | |
| Oct 30, 2008 | Expired or cancelled withdrawn Jul 2012 | 521 Gates St | remodel (e) 2 story building and add a garage on the 1st floor. demo (e) rear walls, add a roof deck. add 1 bathroom on the 1st floor. add penthouse with 2 bedroom and 1 bathtroom. horizontal & vertical additionDetails
remodel (e) 2 story building and add a garage on the 1st floor. demo (e) rear walls, add a roof deck. add 1 bathroom on the 1st floor. add penthouse with 2 bedroom and 1 bathtroom. horizontal & vertical addition | $220,000 | |
| Oct 8, 2008 | Completed final sign-off May 2009 | 223 Dore St | Forest Building Construction | repair water damaged sheetrock, electrical, framing, siding & roofing at the 2nd floor in the kitchen & bathroom area. new cabinets, appliance, bathroom fixtures, flooring.Details
repair water damaged sheetrock, electrical, framing, siding & roofing at the 2nd floor in the kitchen & bathroom area. new cabinets, appliance, bathroom fixtures, flooring. | $10,000 |
| Jun 24, 2008 | Completed final sign-off Aug 2008 | 1200 Vicente St | Hung's General Construction | work on unit 101 -1202 vicente only)( add new walls to provide for (2) new treatment rms. & replace doors revise locations of electrical outlets install shower in changing rms, repalce (e) 30" wide interiors doors with 36" wide doors)(9 resid'l & 5 comm'l whole bldg)(lots 50 thru 63)Details
work on unit 101 -1202 vicente only)( add new walls to provide for (2) new treatment rms. & replace doors revise locations of electrical outlets install shower in changing rms, repalce (e) 30" wide interiors doors with 36" wide doors)(9 resid'l & 5 comm'l whole bldg)(lots 50 thru 63) | $11,000 |
| May 18, 2004 | Never finaled issued May 2004, no final | 1547 Clay St | correction of complaint 200345217- demo exit car port deemed to be illegally construced. repair winDetails
correction of complaint 200345217- demo exit car port deemed to be illegally construced. repair win | $5,000 |