Block 5726, lot 025
521 Gates St
- City’s use
- Multi-Family Residential
- Built
- 1921
- Stories
- 2
- Units
- 2
- Rooms
- 5 bedrooms, 2 bathrooms
- Building
- 1,300 sq ft
- Lot
- 1,750 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 25, 2012 | Never finaled filed Apr 2012, never issued | 521 Gates St | to comply w/ complaint #201131961 & #201075166. legalize the garage at basement. legalize the interior stairs from 1st fl to 2nd fl. (n) toilet rm at basement. relocate water heater & furnace. (n) interior stair from basement to 1st flDetails
to comply w/ complaint #201131961 & #201075166. legalize the garage at basement. legalize the interior stairs from 1st fl to 2nd fl. (n) toilet rm at basement. relocate water heater & furnace. (n) interior stair from basement to 1st fl | $18,000 | |
| Oct 18, 2011 | Expired or cancelled withdrawn Jul 2012 | 521 Gates St | to comply with nov 201075166 & provide new interior stairs at 1st floor to 2nd floor. install a toliet room at 1st floor. relocate utility room to 1st floor and dryer and washer at 2nd floor. repair foundation.Details
to comply with nov 201075166 & provide new interior stairs at 1st floor to 2nd floor. install a toliet room at 1st floor. relocate utility room to 1st floor and dryer and washer at 2nd floor. repair foundation. | ||
| May 3, 2011 | Expired or cancelled withdrawn Jul 2012 | 521 Gates St | Forest Building Construction | nov 201075166, add bedroom and 1 bath on gr floor. add 1 garage on gr fl, add interior staircase between gr fl and 1st floor. add exterior stair case between gr fl and 1st flDetails
nov 201075166, add bedroom and 1 bath on gr floor. add 1 garage on gr fl, add interior staircase between gr fl and 1st floor. add exterior stair case between gr fl and 1st fl | $40,000 |
| Oct 25, 2010 | Completed final sign-off Oct 2010 | 521 Gates St | reroofingDetails
reroofing | $3,000 | |
| Oct 25, 2010 | Completed final sign-off Oct 2010 | 521 Gates St | Forest Building Construction | repair (e) siding, not visable from street, no structural work, exterior painting, repair broken concrete at front entrance 1'x4"x10'Details
repair (e) siding, not visable from street, no structural work, exterior painting, repair broken concrete at front entrance 1'x4"x10' | $2,500 |
| Apr 22, 2010 | Completed final sign-off Sep 2010 | 521 Gates St | Forest Building Construction | repair (e) wood w/ (n) 2x4 stud wall on 1st. flr. & 2nd. flr. remove (e) flr. jst. & replace (n) 2x12 flr. jst. on 1st. flr. replace 1st. flr. w/ 3/4" t & g plywood. install (n) shear wall on 1st. flr. revision to appl.#201003319406.Details
repair (e) wood w/ (n) 2x4 stud wall on 1st. flr. & 2nd. flr. remove (e) flr. jst. & replace (n) 2x12 flr. jst. on 1st. flr. replace 1st. flr. w/ 3/4" t & g plywood. install (n) shear wall on 1st. flr. revision to appl.#201003319406. | $5,000 |
| Mar 31, 2010 | Completed final sign-off Sep 2010 | 521 Gates St | Forest Building Construction | interior remodel: add two half bath at 2nd. flr. & 1st. flr. relocate (e) furnace to 2nd. flr. & 1st. flr. no exterior change.Details
interior remodel: add two half bath at 2nd. flr. & 1st. flr. relocate (e) furnace to 2nd. flr. & 1st. flr. no exterior change. | $16,000 |
| Feb 26, 2010 | Expired or cancelled cancelled Jan 2026 | 521 Gates St | replace existing gagage door. provide 200 sq" ventilation on new door.Details
replace existing gagage door. provide 200 sq" ventilation on new door. | $1,000 | |
| Jan 26, 2010 | Never finaled issued Jan 2010, no final | 521 Gates St | street spaceDetails
street space | ||
| Dec 23, 2009 | Expired or cancelled cancelled Aug 2022 | 521 Gates St | interior remodel: 1. add 1/2 bath at 1st and 2nd floor, 2. move (e) furnace to 1st floor, add (n) furnace to 2nd floor. no exterior changes.Details
interior remodel: 1. add 1/2 bath at 1st and 2nd floor, 2. move (e) furnace to 1st floor, add (n) furnace to 2nd floor. no exterior changes. | $16,000 | |
| Jul 13, 2009 | Completed final sign-off Jun 2010 | 521 Gates St | Forest Building Construction | shoring design: fir replacement of (e) foundation.Details
shoring design: fir replacement of (e) foundation. | $10,000 |
| Jul 13, 2009 | Completed final sign-off Sep 2010 | 521 Gates St | Forest Building Construction | for both units: new sheetrock & shearwall, electrical & plumbing. repair rotten drywall. location - bathroom, kitchen & 1 bedroom. replace kitchen broken floor tiles & living room carpet. replace broken kitchen cabinets. insulation, painting.Details
for both units: new sheetrock & shearwall, electrical & plumbing. repair rotten drywall. location - bathroom, kitchen & 1 bedroom. replace kitchen broken floor tiles & living room carpet. replace broken kitchen cabinets. insulation, painting. | $62,942 |
| Jul 1, 2009 | Never finaled issued Jul 2009, no final | 521 Gates St | street space permitDetails
street space permit | ||
| May 18, 2009 | Completed final sign-off Jul 2010 | 521 Gates St | Forest Building Construction | replace existing foundation.Details
replace existing foundation. | $20,000 |
| Oct 30, 2008 | Expired or cancelled withdrawn Jul 2012 | 521 Gates St | remodel (e) 2 story building and add a garage on the 1st floor. demo (e) rear walls, add a roof deck. add 1 bathroom on the 1st floor. add penthouse with 2 bedroom and 1 bathtroom. horizontal & vertical additionDetails
remodel (e) 2 story building and add a garage on the 1st floor. demo (e) rear walls, add a roof deck. add 1 bathroom on the 1st floor. add penthouse with 2 bedroom and 1 bathtroom. horizontal & vertical addition | $220,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.