Le's Plumbing & Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to Jul 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 14 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2020 | Completed final sign-off Feb 2021 | 496 Crestlake Dr | proposed to legalize one bedroom and one full bath on basement level and seismically strengthening (e) footing as shown on proposed plansDetails
proposed to legalize one bedroom and one full bath on basement level and seismically strengthening (e) footing as shown on proposed plans | $65,000 |
| Jul 5, 2019 | Completed final sign-off Oct 2019 | 228 Haight St | remodel (e) kitchen and (e) full bath; add 1 new full bath as shown on property plansDetails
remodel (e) kitchen and (e) full bath; add 1 new full bath as shown on property plans | $80,000 |
| Apr 18, 2013 | Completed final sign-off Jul 2013 | 4638 Anza St | kitchen work: replace cabinets, sink, dishwasher machine, disposal, range, upgrade electrical, lights, painting.Details
kitchen work: replace cabinets, sink, dishwasher machine, disposal, range, upgrade electrical, lights, painting. | $10,500 |
| Jan 13, 2012 | Expired or cancelled expired Dec 2013 | 1607 48th Av | proposed to remodel kitchen and bathroom on 2nd floor, add 2 bedrooms, one playing room, one full bath and 1/2 bath on ground floor as shown on plans. to comply with nov #201071606. replace in-kind wood. add 1 front window.Details
proposed to remodel kitchen and bathroom on 2nd floor, add 2 bedrooms, one playing room, one full bath and 1/2 bath on ground floor as shown on plans. to comply with nov #201071606. replace in-kind wood. add 1 front window. | $45,000 |
| Dec 27, 2011 | Expired or cancelled expired Dec 2013 | 1607 48th Av | replace bath tub, vanity, toilet, duplex (gfci), fan & lites,repl floor, tile wall (bathroom remodel, 2nd flr) no changes on walls and openingsDetails
replace bath tub, vanity, toilet, duplex (gfci), fan & lites,repl floor, tile wall (bathroom remodel, 2nd flr) no changes on walls and openings | $2,700 |
| Jul 13, 2011 | Completed final sign-off Nov 2011 | 1824 Divisadero St | ada restroom upgrade, ada front entrance for nail salon. no change of use. barrier removal only.Details
ada restroom upgrade, ada front entrance for nail salon. no change of use. barrier removal only. | $12,000 |
| Feb 3, 2010 | Completed final sign-off May 2010 | 4430 20th St | install new powder room in existing walk-in closet next to utility room on first floor, unit 4430Details
install new powder room in existing walk-in closet next to utility room on first floor, unit 4430 | $7,000 |
| Apr 30, 2009 | Completed final sign-off Sep 2009 | 1773 Grove St | work @ unit# 1773 only. remove & replace (e) cabinets. no strutural work. no new lighting.Details
work @ unit# 1773 only. remove & replace (e) cabinets. no strutural work. no new lighting. | $8,171 |
| Apr 30, 2009 | Completed final sign-off Sep 2009 | 1773 Grove St | comply with physical inspection report# 3r-5223. item# 2 (general bldg) under separate permit. (no c.f.c until all items including #2 completed).Details
comply with physical inspection report# 3r-5223. item# 2 (general bldg) under separate permit. (no c.f.c until all items including #2 completed). | $6,500 |
| Apr 7, 2009 | Completed final sign-off Aug 2009 | 2286 42nd Av | at ground floor: install a new bedroom & new bath room, and utility room.Details
at ground floor: install a new bedroom & new bath room, and utility room. | $22,000 |
| Sep 25, 2008 | Completed final sign-off Sep 2009 | 1773 Grove St | beam retrofit at garage level to comply with item# 2 of physical inspection report# 3r-5223.Details
beam retrofit at garage level to comply with item# 2 of physical inspection report# 3r-5223. | $12,000 |
| Jul 17, 2006 | Completed final sign-off Feb 2007 | 2331 12th Av | remove (e) wall in kitchen, remodel the kitchen (no structural)Details
remove (e) wall in kitchen, remodel the kitchen (no structural) | $18,800 |
| Mar 15, 2006 | Completed final sign-off Oct 2006 | 44 Brussels St | remove 2 illegal kitchen at groundfloor - restore (e0 wetbarDetails
remove 2 illegal kitchen at groundfloor - restore (e0 wetbar | $5,000 |
| Feb 8, 2006 | Completed final sign-off Apr 2006 | 2230 Pacific Av | bathroom remodel- remove tab, lavatory, toilet, medicine chest, floor & wall panel. install new tub, new lavatory, faucets, toilets & medicine chest. build wooden frame for drop in tub. tile, floor wall behind tub/shower & tile wall around drop in tab frameDetails
bathroom remodel- remove tab, lavatory, toilet, medicine chest, floor & wall panel. install new tub, new lavatory, faucets, toilets & medicine chest. build wooden frame for drop in tub. tile, floor wall behind tub/shower & tile wall around drop in tab frame | $13,000 |
| Sep 5, 2002 | Completed final sign-off Sep 2002 | 632 Visitacion Av | repl garage door w/ wood garage doorDetails
repl garage door w/ wood garage door | $1,000 |
| Aug 20, 2002 | Completed final sign-off Mar 2003 | 181 Thrift St | stripped off roof, install plywood, attic insulation, new entrance door, security door. install ceilDetails
stripped off roof, install plywood, attic insulation, new entrance door, security door. install ceil | $38,900 |