Back to bathroom remodel contractors
Le's Plumbing & Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to Jul 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 14 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 2 expired or cancelled. Typically 8 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2020 | Completed final sign-off Feb 2021 | 496 Crestlake Dr | proposed to legalize one bedroom and one full bath on basement level and seismically strengthening (e) footing as shown on proposed plansDetails
proposed to legalize one bedroom and one full bath on basement level and seismically strengthening (e) footing as shown on proposed plans | $65,000 |
| Jul 5, 2019 | Completed final sign-off Oct 2019 | 228 Haight St | remodel (e) kitchen and (e) full bath; add 1 new full bath as shown on property plansDetails
remodel (e) kitchen and (e) full bath; add 1 new full bath as shown on property plans | $80,000 |
| Jan 13, 2012 | Expired or cancelled expired Dec 2013 | 1607 48th Av | proposed to remodel kitchen and bathroom on 2nd floor, add 2 bedrooms, one playing room, one full bath and 1/2 bath on ground floor as shown on plans. to comply with nov #201071606. replace in-kind wood. add 1 front window.Details
proposed to remodel kitchen and bathroom on 2nd floor, add 2 bedrooms, one playing room, one full bath and 1/2 bath on ground floor as shown on plans. to comply with nov #201071606. replace in-kind wood. add 1 front window. | $45,000 |
| Dec 27, 2011 | Expired or cancelled expired Dec 2013 | 1607 48th Av | replace bath tub, vanity, toilet, duplex (gfci), fan & lites,repl floor, tile wall (bathroom remodel, 2nd flr) no changes on walls and openingsDetails
replace bath tub, vanity, toilet, duplex (gfci), fan & lites,repl floor, tile wall (bathroom remodel, 2nd flr) no changes on walls and openings | $2,700 |
| Apr 7, 2009 | Completed final sign-off Aug 2009 | 2286 42nd Av | at ground floor: install a new bedroom & new bath room, and utility room.Details
at ground floor: install a new bedroom & new bath room, and utility room. | $22,000 |
| Feb 8, 2006 | Completed final sign-off Apr 2006 | 2230 Pacific Av | bathroom remodel- remove tab, lavatory, toilet, medicine chest, floor & wall panel. install new tub, new lavatory, faucets, toilets & medicine chest. build wooden frame for drop in tub. tile, floor wall behind tub/shower & tile wall around drop in tab frameDetails
bathroom remodel- remove tab, lavatory, toilet, medicine chest, floor & wall panel. install new tub, new lavatory, faucets, toilets & medicine chest. build wooden frame for drop in tub. tile, floor wall behind tub/shower & tile wall around drop in tab frame | $13,000 |