Ken Eng
- License
- C17256
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Aston Periera & Assoc.
- On San Francisco permits
- Dec 2004 to Sep 2005
5 permits since 2000 (architect on 5 permits): 4 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cannon Constructors North Inc (2)
- Engineers
- Kam Wing Yan
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2005 | Completed final sign-off Sep 2006 | 909 Montgomery St | Cannon Constructors North Inc | oti-3, 4th floor, me.Details
oti-3, 4th floor, me. | $49,750 |
| Sep 21, 2005 | Completed final sign-off Jul 2006 | 909 Montgomery St | Cannon Constructors North Inc | oti-3, 3rd floor, el. otiDetails
oti-3, 3rd floor, el. oti | $182,000 |
| Mar 17, 2005 | Completed final sign-off Jun 2005 | 200 Kansas St | oti-1 2nd floor el ,spDetails
oti-1 2nd floor el ,sp | $14,500 | |
| Feb 17, 2005 | Completed final sign-off Apr 2005 | 111 Sutter St | oti-1 3rd floor el lsDetails
oti-1 3rd floor el ls | $1,500 | |
| Dec 7, 2004 | Never finaled issued Dec 2004, no final | 909 Montgomery St | remove the existing stair which connects the 2nd and 3rd floor close the (e) hole with compositeDetails
remove the existing stair which connects the 2nd and 3rd floor close the (e) hole with composite | $22,500 |