Joyce Cheng
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- A & J Design Associates Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Nov 2024
79 permits since 2000 (engineer on 63 permits, architect on 9 permits, designer on 5 permits, authorized agent-others on 3 permits): 58 completed, 1 in progress, 8 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 1, 2024 | Completed final sign-off Sep 2025 | 746 18th Av | Jian's Builder Corp | to comply with nov #202426380 2nd fl: remodel (e) kitchen & bathroom. add toilet room. 1st fl: install (n) bathroom, 2 bedrooms & family roomDetails
to comply with nov #202426380 2nd fl: remodel (e) kitchen & bathroom. add toilet room. 1st fl: install (n) bathroom, 2 bedrooms & family room | $60,000 |
| Dec 20, 2023 | Completed final sign-off Jun 2025 | 521 Cortland Av | to comply w/ accessible entrance program per ordinance 51-16. abe# 201911228605. change entrance door and electrical power door operator.Details
to comply w/ accessible entrance program per ordinance 51-16. abe# 201911228605. change entrance door and electrical power door operator. | $4,000 | |
| Nov 22, 2023 | Completed final sign-off Dec 2023 | 2340 Geary Bl | to comply with accessible entrance program 51-16, abe#: 202308148242Details
to comply with accessible entrance program 51-16, abe#: 202308148242 | $15,000 | |
| Jul 24, 2023 | Never finaled issued Aug 2023, no final | 754 Paris St | Kwok Pun Leung Const. Co ***Check I D** | revision to pa# 202104017763, relocate bedroom & kitchen area at 1/f adu unit, add a toilet room at 1/f adu unit.Details
revision to pa# 202104017763, relocate bedroom & kitchen area at 1/f adu unit, add a toilet room at 1/f adu unit. | $3,500 |
| Mar 1, 2023 | Completed final sign-off Oct 2023 | 1542 26th Av | Electric Current Construction Inc. | revision to pa# 202108025579, revised rear stairs from 2/f to 1/f, revised location of washer/dryer at 1/f, add a door in garage area.Details
revision to pa# 202108025579, revised rear stairs from 2/f to 1/f, revised location of washer/dryer at 1/f, add a door in garage area. | |
| Jan 27, 2023 | Completed final sign-off May 2023 | 1427 Taraval St | Lt Construction Inc | rebuild in-kind existing damaged 2nd exit stairs in lightwell area. relocate furnaces and water heaters in garage area.Details
rebuild in-kind existing damaged 2nd exit stairs in lightwell area. relocate furnaces and water heaters in garage area. | $25,000 |
| Oct 7, 2022 | Completed final sign-off Jun 2023 | 1331 Vicente St | Wei Dang Builders Inc. | remove family room and toliet room. install 2 bed rooms and 2 bath rooms, remodeling (e) bathroom, add 1 bath room and 1 toielet room, relocate kitchen interrior stairs, add 2nd fl. roof deck and sky lightDetails
remove family room and toliet room. install 2 bed rooms and 2 bath rooms, remodeling (e) bathroom, add 1 bath room and 1 toielet room, relocate kitchen interrior stairs, add 2nd fl. roof deck and sky light | $180,000 |
| May 27, 2022 | Completed final sign-off Oct 2024 | 2230 27th Av | The Passion Construction Inc | 2/f: remodel existing kitchen & bathroom. add a toilet room. 1/f: install 2 bedrooms, 1 bathroom, sink & countertop, a laundry room. no exterior work.Details
2/f: remodel existing kitchen & bathroom. add a toilet room. 1/f: install 2 bedrooms, 1 bathroom, sink & countertop, a laundry room. no exterior work. | $180,000 |
| Feb 7, 2022 | Completed final sign-off Mar 2022 | 65 Blake St | C & K Housing Const Co *Ck Id* | to comply with nov 202185726. repair/replace the damaged post and post footing. no exterior work, interior only.Details
to comply with nov 202185726. repair/replace the damaged post and post footing. no exterior work, interior only. | $8,000 |
| Sep 27, 2021 | In progress issued Nov 2024 | 1623 44th Av | Peter Liu Construction Inc | alteration and addition at rear building for 1st flr, 2flr and 3 fl. adu at 1st flr.Details
alteration and addition at rear building for 1st flr, 2flr and 3 fl. adu at 1st flr. | $180,000 |
| Aug 6, 2021 | Completed final sign-off Dec 2021 | 451 Castro St | Rossi Builders Inc. | barrier removal for main entrance door. provide electrical power door. replace (e) front window and tiles in kind.Details
barrier removal for main entrance door. provide electrical power door. replace (e) front window and tiles in kind. | $7,000 |
| Feb 16, 2021 | Completed final sign-off Mar 2022 | 21 Hawkins Ln | title 24 for pa# 201811166136 as requested by inspector.Details
title 24 for pa# 201811166136 as requested by inspector. | ||
| Nov 6, 2020 | Completed final sign-off Sep 2022 | 115 Ewing Tr | 1/f only: enlarge existing social room. relocate existing bathroom and laundry room.Details
1/f only: enlarge existing social room. relocate existing bathroom and laundry room. | $50,000 | |
| Nov 6, 2020 | Never finaled issued Apr 2021, no final | 349 Vicente St | Coit Construction | alteration to (e) building. 1st flr - add 1 bathroom, fam room and bedroom. 2nd flr - remodel kitchen, add 1 bathroom. remove deck at lightwellDetails
alteration to (e) building. 1st flr - add 1 bathroom, fam room and bedroom. 2nd flr - remodel kitchen, add 1 bathroom. remove deck at lightwell | $80,000 |
| Oct 28, 2020 | Completed final sign-off Feb 2021 | 801 Valencia St | barrier removal work. request unreasonable hardship for front entrance. provide accessible restroom. relocated sinks, walk-in cooler in working area.Details
barrier removal work. request unreasonable hardship for front entrance. provide accessible restroom. relocated sinks, walk-in cooler in working area. | $10,000 | |
| Oct 28, 2020 | Expired or cancelled withdrawn Aug 2021 | 1346 27th Av | proposed a rear deck and stair @ 2/f.Details
proposed a rear deck and stair @ 2/f. | $17,000 | |
| Nov 13, 2019 | Completed final sign-off Sep 2020 | 300 Kearny St | to comply with accessible business entrance program provide electrical power door buttons (top & bottom). repair (e) folding door to one panel to fit in (e) opening.Details
to comply with accessible business entrance program provide electrical power door buttons (top & bottom). repair (e) folding door to one panel to fit in (e) opening. | $5,000 | |
| Jun 28, 2019 | Completed final sign-off Mar 2020 | 1638 42nd Av | Arbutus Construction Inc | remodel (e) kitchen and bathroom. add a (n) bathroom. new electrical. add a skylight in bathroomDetails
remodel (e) kitchen and bathroom. add a (n) bathroom. new electrical. add a skylight in bathroom | $38,000 |
| Jun 18, 2019 | Expired or cancelled cancelled Jan 2026 | 2817 35th Av | 2nd flr only. infill interior light court. relocated interior stairs. remodel kitchen and bathroom, add 1 full bathroom. 3 (n) skylights. (n) rear deck and stairs to rear yard. remove lath and plaster. (n) electrical and plumbing.Details
2nd flr only. infill interior light court. relocated interior stairs. remodel kitchen and bathroom, add 1 full bathroom. 3 (n) skylights. (n) rear deck and stairs to rear yard. remove lath and plaster. (n) electrical and plumbing. | $80,000 | |
| Jun 18, 2019 | Completed final sign-off Sep 2019 | 470 Chenery St | Lt Construction Inc | 2nd flr - add (n) bathroomDetails
2nd flr - add (n) bathroom | $12,000 |
| Jun 18, 2019 | Never finaled issued Sep 2019, no final | 253 Molimo Dr | proposed to remove dry rot deck at 2nd flr only (top level) and replace the (e) sliding door to a window at rear of building. lower level deck to remain unchanged.Details
proposed to remove dry rot deck at 2nd flr only (top level) and replace the (e) sliding door to a window at rear of building. lower level deck to remain unchanged. | $4,500 | |
| Mar 27, 2019 | Completed final sign-off Oct 2020 | 2270 21st Av | unit legalization per ordinance 43-14 @ 1st flr. (2nd flr remodeling under separate permit)Details
unit legalization per ordinance 43-14 @ 1st flr. (2nd flr remodeling under separate permit) | $57,000 | |
| Feb 7, 2019 | Completed final sign-off Sep 2022 | 1608 Cayuga Av | Huang Hua Construction Company | unit legalization per ord# 43-14 at 1st flr w/ 2 bedrooms, 1 bath and kitchen.Details
unit legalization per ord# 43-14 at 1st flr w/ 2 bedrooms, 1 bath and kitchen. | $45,000 |
| Feb 7, 2019 | Completed final sign-off Oct 2019 | 822 Arkansas St | Cal - Pacific Constr. Inc. | front bldg: unit legalization per ord# 43-14 at 1st flr.Details
front bldg: unit legalization per ord# 43-14 at 1st flr. | $46,000 |
| Nov 19, 2018 | Expired or cancelled cancelled Nov 2022 | 1542 42nd Av | unit legalization per ordinance no. 43-14 @ 1st floor. legalize existing habitable rooms into new unit.Details
unit legalization per ordinance no. 43-14 @ 1st floor. legalize existing habitable rooms into new unit. | $30,000 | |
| Nov 16, 2018 | Never finaled issued Nov 2018, no final | 449 Bella Vista Wy | proposed to remove dry rot deck at rear of building. change the sliding door to window at rear.Details
proposed to remove dry rot deck at rear of building. change the sliding door to window at rear. | $6,000 | |
| Nov 16, 2018 | Expired or cancelled expired Apr 2022 | 21 Hawkins Ln | rev to #201710302609. to remain single family dwelling. install playroom, bedroom, toilet room @ 1st fl. change sliding dr to sliding window & remove the deck/stairs at 2nd floor rear of bldg. relocate (e) laundry room from 3/f to 2/f, enlarge (e) master bathroom w/ new shower.Details
rev to #201710302609. to remain single family dwelling. install playroom, bedroom, toilet room @ 1st fl. change sliding dr to sliding window & remove the deck/stairs at 2nd floor rear of bldg. relocate (e) laundry room from 3/f to 2/f, enlarge (e) master bathroom w/ new shower. | ||
| Jul 27, 2018 | Never finaled issued Jan 2019, no final | 1638 Quint St | Vk Construction | unit legalization per ord# 43-14 @ 1st flr w/ 1 bedroom and 1 bath.Details
unit legalization per ord# 43-14 @ 1st flr w/ 1 bedroom and 1 bath. | $40,000 |
| Jun 6, 2018 | Never finaled issued May 2019, no final | 51 Seal Rock Dr | decks on upper and lower floors to be removed and replace with new trex. replace (e) doors & windows.Details
decks on upper and lower floors to be removed and replace with new trex. replace (e) doors & windows. | $10,000 | |
| Mar 29, 2018 | Completed final sign-off Apr 2019 | 1887 34th Av | Lao's Construction | add one adu unit @ ground floor per ord# 162-16. 1st floor (n) unit with two bedrooms, one bath and one kitchen. 2nd floor remodel (e) kitchen & bathroom, add 1/2 bath.Details
add one adu unit @ ground floor per ord# 162-16. 1st floor (n) unit with two bedrooms, one bath and one kitchen. 2nd floor remodel (e) kitchen & bathroom, add 1/2 bath. | $55,000 |
| Mar 29, 2018 | Completed final sign-off Dec 2018 | 200 Faxon Av | Peter Liu Construction Inc | legalize dwelling unit @ 1st floor to comply with ord# 43-14. 2 bedrooms, 2 baths, 1 living rm and 1 kitchen.Details
legalize dwelling unit @ 1st floor to comply with ord# 43-14. 2 bedrooms, 2 baths, 1 living rm and 1 kitchen. | $32,000 |
| Mar 29, 2018 | Expired or cancelled cancelled Oct 2020 | 1475 Chestnut St | vertical & horizontal addition. roof deck on (n) 4th flr. rebuilt interior stairs alteration to (e) bldg: 1st flr (n) bath, enlarged (e) bedrm, (n)interior stairs to 3rd flr, enclosed (e) light well. 2nd & 3rd flr remodel kitchens, bathrms & (n) laundry rms. 4th flr (n) 3 beds & 2 baths.Details
vertical & horizontal addition. roof deck on (n) 4th flr. rebuilt interior stairs alteration to (e) bldg: 1st flr (n) bath, enlarged (e) bedrm, (n)interior stairs to 3rd flr, enclosed (e) light well. 2nd & 3rd flr remodel kitchens, bathrms & (n) laundry rms. 4th flr (n) 3 beds & 2 baths. | $380,000 | |
| Aug 3, 2017 | Completed final sign-off Mar 2018 | 1630 Noriega St | Dliu Construction | work on 2nd floor only - remodeling (e) kitchen, bathroom, add 1 bathroom. change (e) living room to 2 bedroom. add 1 skylight, less than 1' above the roof. new furnace & water heater.Details
work on 2nd floor only - remodeling (e) kitchen, bathroom, add 1 bathroom. change (e) living room to 2 bedroom. add 1 skylight, less than 1' above the roof. new furnace & water heater. | $15,000 |
| Nov 17, 2016 | Never finaled issued Nov 2016, no final | 1320 Portola Dr | Vk Construction | replace (e) dry rot stairs in kindDetails
replace (e) dry rot stairs in kind | $12,000 |
| Nov 4, 2016 | Completed final sign-off Feb 2017 | 1 Federal St | apt #3 - comply with 201640991; to remove storage room and walk in closet room at existing studio. n/a maher ordinanceDetails
apt #3 - comply with 201640991; to remove storage room and walk in closet room at existing studio. n/a maher ordinance | $500 | |
| Oct 7, 2016 | Completed final sign-off Jan 2017 | 175 Miraloma Dr | Lao's Construction | rebuild new retaining wall at (e) rear yard. 201600981Details
rebuild new retaining wall at (e) rear yard. 201600981 | $25,000 |
| Sep 27, 2016 | Expired or cancelled cancelled Oct 2022 | 130 Otsego Av | enclosed (e) lightwell on north side. rebuild (e) entrance stairs in kind at front building. rebuild interior stairs. remodeling (e) kitchen & bathroom at 2nd floor. install master bedroom & bathroom at 1st floor. repair (e) foundation at 1st floor. total 12"= depth excavation.Details
enclosed (e) lightwell on north side. rebuild (e) entrance stairs in kind at front building. rebuild interior stairs. remodeling (e) kitchen & bathroom at 2nd floor. install master bedroom & bathroom at 1st floor. repair (e) foundation at 1st floor. total 12"= depth excavation. | $150,000 | |
| Mar 14, 2016 | Completed final sign-off May 2018 | 501 Junipero Serra Bl | Jimmy Wong | rebuild (e) interior stairs. relocate (e) kitchen. change (e) kitchen to bedroom. add 1 bath room on 2nd floor. add 2 bedrooms, 2 bathrooms at on 1st floor. new family room with with bar on 1st floor. rebuild rear yard door gate.Details
rebuild (e) interior stairs. relocate (e) kitchen. change (e) kitchen to bedroom. add 1 bath room on 2nd floor. add 2 bedrooms, 2 bathrooms at on 1st floor. new family room with with bar on 1st floor. rebuild rear yard door gate. | $280,000 |
| Jan 27, 2016 | Completed final sign-off Feb 2022 | 2432 42nd Av | C & K Housing Const Co *Ck Id* | rear (2) stories horizontal rear addtion. add adu at the ground floor.Details
rear (2) stories horizontal rear addtion. add adu at the ground floor. | $200,000 |
| Jun 30, 2015 | Expired or cancelled cancelled Jan 2020 | 3131 Quintara St | unit legalization from single family to two family dwelling pe ordinance 43-14Details
unit legalization from single family to two family dwelling pe ordinance 43-14 | $19,700 | |
| Feb 2, 2015 | Completed final sign-off Oct 2015 | 2058 47th Av | C.L. Construction Co. | install new 2 bedrooms & 1 bathroom @ 1st floor. remodel existing bathroom & kitchen @ 2nd floor.Details
install new 2 bedrooms & 1 bathroom @ 1st floor. remodel existing bathroom & kitchen @ 2nd floor. | $55,000 |
| May 13, 2013 | Completed final sign-off Jan 2014 | 2339 26th Av | E - 5 Construction Inc | proposed relocated interior (e) stairs. not adding any habitable space at ground floorDetails
proposed relocated interior (e) stairs. not adding any habitable space at ground floor | $10,000 |
| Dec 17, 2012 | Completed final sign-off May 2013 | 2526 31st Av | Success Construction ***See Notes*** | propose to install 2 bedrooms and one full bath on 1st floor.Details
propose to install 2 bedrooms and one full bath on 1st floor. | $25,000 |
| Oct 23, 2012 | Completed final sign-off Mar 2013 | 700 Capitol Av | J P E Construction | remodel (e) bathroom & add new bathroom on 2nd floor. install new family room, 1 bedroom & 1 toilet room on ground floor (garage/1st floor)Details
remodel (e) bathroom & add new bathroom on 2nd floor. install new family room, 1 bedroom & 1 toilet room on ground floor (garage/1st floor) | $30,000 |
| Sep 28, 2012 | Completed final sign-off Jun 2013 | 2455 42nd Av | W F Construction Co | 2nd fl: replace all windows. new lighting in living room. remodel bath and kitchen. 1st floor: new bathroom, bedroom and hallwayDetails
2nd fl: replace all windows. new lighting in living room. remodel bath and kitchen. 1st floor: new bathroom, bedroom and hallway | $25,000 |
| May 9, 2012 | Completed final sign-off Jun 2015 | 1681 48th Av | Ray Woo Construction And Consulting Llc | revision to pa# 2012-0301-5204-alteration to (e) building, relocated kitchen & bedroom. replace all windows & front stairs, exterior wall sidings. structural retrofit & new foundationDetails
revision to pa# 2012-0301-5204-alteration to (e) building, relocated kitchen & bedroom. replace all windows & front stairs, exterior wall sidings. structural retrofit & new foundation | $80,000 |
| May 4, 2012 | Completed final sign-off Mar 2013 | 301 Holly Park Cr | Jimmy Wong | remodel (e) bathroom, relocate interior stairs & closet on 2nd floor. install bedroom, bathrooms & structural retrofit on 1st floorDetails
remodel (e) bathroom, relocate interior stairs & closet on 2nd floor. install bedroom, bathrooms & structural retrofit on 1st floor | $60,000 |
| May 4, 2012 | Completed final sign-off Jul 2012 | 2136 Alemany Bl | Ke Construction Co. | relocated (e) kitchen & change the (e) kitchen to home office on 2nd floor. remodel (e) bathroom on 2nd floorDetails
relocated (e) kitchen & change the (e) kitchen to home office on 2nd floor. remodel (e) bathroom on 2nd floor | $29,000 |
| Mar 5, 2012 | Completed final sign-off May 2012 | 186 Pixley St | Vk Construction | remodeling (e) kitchen & bathroom at 2nd floorDetails
remodeling (e) kitchen & bathroom at 2nd floor | $20,000 |
| Feb 27, 2012 | Completed final sign-off Aug 2012 | 932 Wawona St | J P E Construction | comply with nov# 201174656-change laundry room to storage room, install a new storage room at (e) garage area. all work at 1st floor remove the illegal kitchen at laundry room area.Details
comply with nov# 201174656-change laundry room to storage room, install a new storage room at (e) garage area. all work at 1st floor remove the illegal kitchen at laundry room area. | $5,000 |
| Feb 9, 2012 | Completed final sign-off Apr 2012 | 2824 California St | Chubby Construction | proposed a beauty salon to existing vacant store. no massage service.Details
proposed a beauty salon to existing vacant store. no massage service. | $30,000 |
| Oct 28, 2011 | Completed final sign-off Jan 2012 | 18 Prospect Av | comply with nov# 201153507-removed all structures build without permits. replace windows at (e) rear wallDetails
comply with nov# 201153507-removed all structures build without permits. replace windows at (e) rear wall | $7,500 | |
| Sep 28, 2011 | Completed final sign-off Apr 2012 | 1875 17th Av | Lao's Construction | proposed remodel of existing kitchen, bath, relocate interior stairs, cover light court with skylight at 2nd fl, add new bath 2nd fl, install 2 bedrooms,1 full bath,hallway, replace windows rear gr flDetails
proposed remodel of existing kitchen, bath, relocate interior stairs, cover light court with skylight at 2nd fl, add new bath 2nd fl, install 2 bedrooms,1 full bath,hallway, replace windows rear gr fl | $38,000 |
| May 3, 2011 | Completed final sign-off Jul 2011 | 2148 Bay Shore Bl | Golden Hammer | repair fire damaged floor sheathing and floor joists. proposed new full bath and storages at gr fl. upgrade elec light and outlet at 2nd fl. replace sheetrock at bedroom, living room @ 2nd floor.Details
repair fire damaged floor sheathing and floor joists. proposed new full bath and storages at gr fl. upgrade elec light and outlet at 2nd fl. replace sheetrock at bedroom, living room @ 2nd floor. | $20,000 |
| Apr 26, 2011 | Completed final sign-off Dec 2011 | 12 Lexington St | Yiu Cheong Construction Co Inc | unit #14-remodel/relocate kitchen, dining room, bathroom & laundry room on main level. add a toilet room (bathroom)Details
unit #14-remodel/relocate kitchen, dining room, bathroom & laundry room on main level. add a toilet room (bathroom) | $25,000 |
| Mar 16, 2011 | Completed final sign-off Apr 2011 | 1802 Balboa St | Hong's Custom Builders | change to bathroom plan (refer to p/a 201103031299) provide occupant load verification for fire department assembly permit.Details
change to bathroom plan (refer to p/a 201103031299) provide occupant load verification for fire department assembly permit. | $1,500 |
| Jan 21, 2011 | Completed final sign-off Feb 2011 | 1033 Irving St | to comply w/nov #201185629 - propose to remove rear shed (1-story approx 7'-6" ht, no foundation to remove), built without required bldg permit.Details
to comply w/nov #201185629 - propose to remove rear shed (1-story approx 7'-6" ht, no foundation to remove), built without required bldg permit. | $10,000 | |
| Oct 8, 2010 | Completed final sign-off Jan 2013 | 8 Hidalgo Tr | Vida Building Systems | construct a 1-story extension to existing single family residence into rear yard, approx 18' x 20' incl roof deck.Details
construct a 1-story extension to existing single family residence into rear yard, approx 18' x 20' incl roof deck. | $125,000 |
| Aug 17, 2010 | Completed final sign-off Dec 2010 | 572 40th Av | Golden Hammer | legalize 2 bedrooms hall from (e) social room, remove illegal kitchen at ground floor. remove the tub & shower @ the bathroom at ground.Details
legalize 2 bedrooms hall from (e) social room, remove illegal kitchen at ground floor. remove the tub & shower @ the bathroom at ground. | $15,000 |
| Jul 23, 2010 | Expired or cancelled expired Mar 2013 | 1704 Vallejo St | C G Adams Construction | proposed remodeling of (e) kitchen in unit # 1704 on the 3rd floor, new lighting comply wiht cec 150 (k).Details
proposed remodeling of (e) kitchen in unit # 1704 on the 3rd floor, new lighting comply wiht cec 150 (k). | $45,000 |
| Apr 14, 2010 | Completed final sign-off Oct 2010 | 1468 Valencia St | Lorber Company Inc Dba Superior Builders | revision to 200806043600. scope of work: 1. provide construction details shown on delta 1,2 and 3 sheet a3,a4,s3. 2. provided udate accessible restrooms and ramp on 1st floor office space. 3. update cost to reflect accurate cost under 200806043600.Details
revision to 200806043600. scope of work: 1. provide construction details shown on delta 1,2 and 3 sheet a3,a4,s3. 2. provided udate accessible restrooms and ramp on 1st floor office space. 3. update cost to reflect accurate cost under 200806043600. | $632,215 |
| Sep 28, 2009 | Completed final sign-off Feb 2010 | 1574 43rd Av | High Quality Home Builder Construction | relocate interior stairs, add 1 full bathroom @ 2nd floor. new bedroom & family room and bathroom at ground floor. add anchaor bolts in (e) wall @ ground floor.Details
relocate interior stairs, add 1 full bathroom @ 2nd floor. new bedroom & family room and bathroom at ground floor. add anchaor bolts in (e) wall @ ground floor. | $5,500 |
| Jan 30, 2009 | Expired or cancelled withdrawn May 2012 | 1468 Valencia St | change of use from retail to laundromat at floor.Details
change of use from retail to laundromat at floor. | $150,000 | |
| Jan 30, 2009 | Completed final sign-off Feb 2009 | 2491 40th Av | revision to pa #200901079753: relocate washer & dryer on ground floor.Details
revision to pa #200901079753: relocate washer & dryer on ground floor. | ||
| Oct 22, 2008 | Completed final sign-off Mar 2009 | 3425 Divisadero St | C G Adams Construction | remodeling existing bathrm, kitchen & dining rm at 3rd fl.Details
remodeling existing bathrm, kitchen & dining rm at 3rd fl. | $35,000 |
| May 15, 2008 | Completed final sign-off Jan 2009 | 360 Valdez Av | Evan Construction | 2 (n) bedrooms, storage room, family room, utility room @ ground floor. reduced (e) bathroom, and rebuild (e) stairs. install new windows @ ground floor. install new beam @ ground floor.Details
2 (n) bedrooms, storage room, family room, utility room @ ground floor. reduced (e) bathroom, and rebuild (e) stairs. install new windows @ ground floor. install new beam @ ground floor. | $35,000 |
| May 2, 2008 | Completed final sign-off Sep 2009 | 253 Sanchez St | Ac And Company | to demolish 1 story storage unit with toliet room (rear building).Details
to demolish 1 story storage unit with toliet room (rear building). | |
| May 2, 2008 | Never finaled issued Jul 2009, no final | 253 Sanchez St | Ac And Company | to erect 1 story storage with toilet room at rear of existing 3 unit bldg.Details
to erect 1 story storage with toilet room at rear of existing 3 unit bldg. | $100,000 |
| Aug 10, 2007 | Completed final sign-off Feb 2008 | 1758 44th Av | proposed bedroom, family room and bathroom at ground floor. install deck and stairs at rear of building. remodel one bath and kitchen at second floor. add new bathroom and skylight at second floor. replace (e) window as shown on plan.Details
proposed bedroom, family room and bathroom at ground floor. install deck and stairs at rear of building. remodel one bath and kitchen at second floor. add new bathroom and skylight at second floor. replace (e) window as shown on plan. | $50,000 | |
| May 7, 2007 | Expired or cancelled cancelled Jan 2010 | 500 Sutter St | replace the (e) sidewalk on sutter street. (this supercedes the sidewalk repairs shown in pa# 2006/04/17/9134) modify storefronts for accessibility.Details
replace the (e) sidewalk on sutter street. (this supercedes the sidewalk repairs shown in pa# 2006/04/17/9134) modify storefronts for accessibility. | $200,000 | |
| Dec 22, 2006 | Completed final sign-off Jan 2008 | 2612 Sacramento St | proposed alteration and repair to exiting rear building damaged. repair & replace material, replace plumbing fixtures, change (e) ladder to stairs & new furnace.Details
proposed alteration and repair to exiting rear building damaged. repair & replace material, replace plumbing fixtures, change (e) ladder to stairs & new furnace. | $70,000 | |
| Sep 29, 2006 | Completed final sign-off Nov 2007 | 3917 Noriega St | Kwok Pun Leung Const. Co ***Check I D** | proposed a new restaurant to (e) retail store, change of occupancy.Details
proposed a new restaurant to (e) retail store, change of occupancy. | $80,000 |
| Dec 15, 2005 | Completed final sign-off Apr 2007 | 2125 Beach St | Igor Kurikov | remodeling (e) 2/f (add bathroom,remodel kitchen,add washer/dryer).Details
remodeling (e) 2/f (add bathroom,remodel kitchen,add washer/dryer). | $30,000 |
| Aug 22, 2005 | Completed final sign-off Apr 2006 | 4031 18th St | Yellow Zone Construction | propsoed remodeling existing 2nd floor and 3rd floor convert existing kitchen to bedrm relocate (e)Details
propsoed remodeling existing 2nd floor and 3rd floor convert existing kitchen to bedrm relocate (e) | $35,000 |
| Mar 24, 2005 | Expired or cancelled expired Jan 2006 | 1411 Shafter Av | proposed alteration to (e0 g/f. install family room and bath room @ g/f.Details
proposed alteration to (e0 g/f. install family room and bath room @ g/f. | $18,000 | |
| Mar 10, 2005 | Completed final sign-off Jul 2005 | 825 24th Av | remodeling existing 2/f relocated kitchen and both rm)Details
remodeling existing 2/f relocated kitchen and both rm) | $20,000 | |
| Mar 8, 2005 | Expired or cancelled expired Mar 2006 | 372 Ellis St | rev.appl#200410267736 per owner's request & re-submit for approval. change fan & exhaust duct forDetails
rev.appl#200410267736 per owner's request & re-submit for approval. change fan & exhaust duct for | ||
| Jan 11, 2005 | Completed final sign-off Jun 2005 | 800 Athens St | proposed install bedrms, bathrm & storage at ground floorDetails
proposed install bedrms, bathrm & storage at ground floor | $35,000 | |
| Jan 3, 2005 | Completed final sign-off Apr 2005 | 1677 Bush St | proposed remodeling of existing unit 13 at 2nd floor. unit 20 at 3rd flr as shown on plansDetails
proposed remodeling of existing unit 13 at 2nd floor. unit 20 at 3rd flr as shown on plans | $28,000 |