Jonathan Fitzgibbon
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Norwood Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Aug 2026
99 permits since 2000 (contractor on 99 permits, authorized agent-others on 3 permits, designer on 1 permit): 70 completed, 19 in progress, 6 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 3529 19th St | Norwood Construction | revision to 202607215335, expand the (e) wall opening between the kitchen & living room. install new header cover opening & suporting postsDetails
revision to 202607215335, expand the (e) wall opening between the kitchen & living room. install new header cover opening & suporting posts | $10,000 |
| Aug 3, 2026 | In progress issued Aug 2026 | 3531 19th St | Norwood Construction | revision to 202607215325, expand the (e) wall opening between the kitchen & living room. install new header cover opening & suporting postsDetails
revision to 202607215325, expand the (e) wall opening between the kitchen & living room. install new header cover opening & suporting posts | $10,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 3529 19th St | Norwood Construction | demo existing kitchen and remodel, new cabinets, new plumbing and electrical, tiles, replace plaster drywall with 5/8" type x sheetrock at kitchen only, replace 5 windows, u=0.27 max, back of home, non street facing. same size and location. all work like for likeDetails
demo existing kitchen and remodel, new cabinets, new plumbing and electrical, tiles, replace plaster drywall with 5/8" type x sheetrock at kitchen only, replace 5 windows, u=0.27 max, back of home, non street facing. same size and location. all work like for like | $120,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 3531 19th St | Norwood Construction | demo existing kitchen and remodel, new cabinets, new plumbing and electrical, tiles, replace plaster drywall with 5/8" type x sheetrock @ kitchen only, replace 1 windows, u=0.27 max, back of home, non street facing. same size and location. all work like for likeDetails
demo existing kitchen and remodel, new cabinets, new plumbing and electrical, tiles, replace plaster drywall with 5/8" type x sheetrock @ kitchen only, replace 1 windows, u=0.27 max, back of home, non street facing. same size and location. all work like for like | $120,000 |
| May 4, 2026 | In progress issued May 2026 | 1328 Greenwich St | Norwood Construction | replace cabnetry doors in kitchen, new countertop, new electrical in kitchen and living room, & new drywall and painting.Details
replace cabnetry doors in kitchen, new countertop, new electrical in kitchen and living room, & new drywall and painting. | $20,000 |
| Apr 1, 2026 | In progress issued Jun 2026 | 535 Oak Park Dr | Norwood Construction | (n) 9 sq ft front facade bay window. replace stucco at front and side facade w/ (n) siding. interior renovation at 2/f. kitchen, bedrooms, and bathrooms. (n) finishes on (e) ext stair structure. (n) 2/f windows and skylights. (n) lighting and mech supply ducting at 2/f. (e) gas furnace to remain.Details
(n) 9 sq ft front facade bay window. replace stucco at front and side facade w/ (n) siding. interior renovation at 2/f. kitchen, bedrooms, and bathrooms. (n) finishes on (e) ext stair structure. (n) 2/f windows and skylights. (n) lighting and mech supply ducting at 2/f. (e) gas furnace to remain. | $140,000 |
| Mar 3, 2026 | In progress issued Mar 2026 | 462 Kansas St | Norwood Construction | interior remodel of the lower unit in existing 2 unit residential building (r-3). work includes replacement of cabinets, finishes, plumbing, lighting, ventilation, new electrical subpanel, enlargement of existing mechanical room, installation of stacked washer/dryer in bathroom. no structural work.Details
interior remodel of the lower unit in existing 2 unit residential building (r-3). work includes replacement of cabinets, finishes, plumbing, lighting, ventilation, new electrical subpanel, enlargement of existing mechanical room, installation of stacked washer/dryer in bathroom. no structural work. | $20,000 |
| Jan 26, 2026 | In progress issued Mar 2026 | 306 Arlington St | Norwood Construction | 2/f: remove (2) kitchen structral beams and reinforce (e) ceiling framing. reconfigure kitchen plumbing fixtures. infill rear swing door and replace rear sliding window with french door to access rear deck/yard. ref bpa 202512051114.Details
2/f: remove (2) kitchen structral beams and reinforce (e) ceiling framing. reconfigure kitchen plumbing fixtures. infill rear swing door and replace rear sliding window with french door to access rear deck/yard. ref bpa 202512051114. | $36,000 |
| Jan 5, 2026 | In progress issued Jan 2026 | 58 San Benito Wy | Norwood Construction | revision to pa# 202504043761: adding new 3/4" plywood sub-floor to kitchen and new 2 x 10 joists to kitchen ceiling - in kind replacement.Details
revision to pa# 202504043761: adding new 3/4" plywood sub-floor to kitchen and new 2 x 10 joists to kitchen ceiling - in kind replacement. | $1,000 |
| Dec 8, 2025 | In progress filed Dec 2025, not yet issued | 4633 19th St | Norwood Construction | renovation of (e) single family residence including rear addition.Details
renovation of (e) single family residence including rear addition. | $450,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 306 Arlington St | Norwood Construction | remodel kitchen and bathroom like for like. new electrical and plumbing and drywall for both. new cabinets.Details
remodel kitchen and bathroom like for like. new electrical and plumbing and drywall for both. new cabinets. | $100,000 |
| Dec 5, 2025 | Completed final sign-off Mar 2026 | 1330 06th Av | Norwood Construction | remove wood siding and replace with wood siding. using same materials like for like, non street visible.Details
remove wood siding and replace with wood siding. using same materials like for like, non street visible. | $10,000 |
| Oct 22, 2025 | In progress issued Dec 2025 | 1735 47th Av | Norwood Construction | revision to approved pa#: 202410283881. add new roof deck and roof hatch per a13-057.Details
revision to approved pa#: 202410283881. add new roof deck and roof hatch per a13-057. | $50,000 |
| Apr 17, 2025 | In progress issued Apr 2025 | 1731 47th Av | Norwood Construction | new underpinning along (e) south permiter conc foundation that shares with southern neighbor at 1735 47th ave. this accomodates foundation replacement at 1735 47th ave. ref 202410283881Details
new underpinning along (e) south permiter conc foundation that shares with southern neighbor at 1735 47th ave. this accomodates foundation replacement at 1735 47th ave. ref 202410283881 | $26,000 |
| Apr 17, 2025 | In progress issued Apr 2025 | 1739 47th Av | Norwood Construction | new underpinning along (e) south permiter conc foundation that shares with southern neighbor at 1735 47th ave. this accomodates foundation replacement at 1735 47th ave. ref 202410283881Details
new underpinning along (e) south permiter conc foundation that shares with southern neighbor at 1735 47th ave. this accomodates foundation replacement at 1735 47th ave. ref 202410283881 | $28,000 |
| Apr 4, 2025 | Completed final sign-off Sep 2026 | 58 San Benito Wy | Norwood Construction | renovation of existing bathrooms(3) and a kitchen. no exterior works or increase in square footage.Details
renovation of existing bathrooms(3) and a kitchen. no exterior works or increase in square footage. | $155,000 |
| Mar 19, 2025 | Completed final sign-off May 2025 | 2538 Great Hy | Norwood Construction | ref 202308033695 & 202503122086 - underpinning below (e) north property line footing required due to work at property lineDetails
ref 202308033695 & 202503122086 - underpinning below (e) north property line footing required due to work at property line | $5,000 |
| Mar 19, 2025 | Completed final sign-off May 2025 | 2530 Great Hy | Norwood Construction | ref 202308033695- underpinning below (e) south property line footing required due to work at property lineDetails
ref 202308033695- underpinning below (e) south property line footing required due to work at property line | $5,000 |
| Mar 12, 2025 | In progress issued Mar 2025 | 2534 Great Hy | Norwood Construction | revision to permit 202308033695 to address discovered shared footing at side property lines. structural work only - update detail 5/s5.1. no other changes or scope.Details
revision to permit 202308033695 to address discovered shared footing at side property lines. structural work only - update detail 5/s5.1. no other changes or scope. | |
| Feb 25, 2025 | Completed final sign-off Apr 2025 | 1746 48th Av | Norwood Construction | replace 57' of fence at south side. 25' of fence at 75" height matching with existing and 32' of fence at 98" height.Details
replace 57' of fence at south side. 25' of fence at 75" height matching with existing and 32' of fence at 98" height. | $6,000 |
| Jan 6, 2025 | In progress issued May 2026 | 253 Chattanooga St | Norwood Construction | widen vehicle door of detached garage. remove interior non-bearing partian walls.Details
widen vehicle door of detached garage. remove interior non-bearing partian walls. | $10,000 |
| Nov 13, 2024 | In progress issued May 2025 | 1735 47th Av | Norwood Construction | new horizontal addition @ rear yard. new vertical 3rd floor addition & decks. new exterior cladding throughout. modifications to front facade. reconfiguration of interior walls. new interior stairs, relocate interior bathrooms & kitchen.Details
new horizontal addition @ rear yard. new vertical 3rd floor addition & decks. new exterior cladding throughout. modifications to front facade. reconfiguration of interior walls. new interior stairs, relocate interior bathrooms & kitchen. | $600,000 |
| Nov 7, 2024 | Completed final sign-off Apr 2025 | 1746 48th Av | Norwood Construction | to abate nov 202419103- (n) garden shed in rear yard (100sf) varience aproved for heightDetails
to abate nov 202419103- (n) garden shed in rear yard (100sf) varience aproved for height | $12,000 |
| Aug 13, 2024 | Completed final sign-off Aug 2025 | 944 Rivera St | Norwood Construction | revision to pa 2023-0908-6169 enlarge new patio (previously approved) including retaining walls, built in bench and steps up to gradeDetails
revision to pa 2023-0908-6169 enlarge new patio (previously approved) including retaining walls, built in bench and steps up to grade | $3,000 |
| Aug 8, 2024 | Completed final sign-off Feb 2025 | 462 Kansas St | Norwood Construction | revision to pa # 2023-0428-6738 remove skylight from scope of workDetails
revision to pa # 2023-0428-6738 remove skylight from scope of work | |
| Jul 22, 2024 | Completed final sign-off Aug 2025 | 2218 15th St | Norwood Construction | kitchen, primary bathroom and guest bath remodel. upgrade the electrical, plumbing, drywall, painting and refinish flooring. kitchen and bath's renovations in like kindDetails
kitchen, primary bathroom and guest bath remodel. upgrade the electrical, plumbing, drywall, painting and refinish flooring. kitchen and bath's renovations in like kind | $100,000 |
| Jun 25, 2024 | Completed final sign-off Jul 2025 | 1746 48th Av | Norwood Construction | on 1st floor: convert closet to tv room, add closets to primary bedroom, enclose laundry. on 2nd floor: kitchen and dining room remodel. remove unpermitted convienience stair and low roof deck per eg-03Details
on 1st floor: convert closet to tv room, add closets to primary bedroom, enclose laundry. on 2nd floor: kitchen and dining room remodel. remove unpermitted convienience stair and low roof deck per eg-03 | $55,000 |
| May 20, 2024 | Completed final sign-off Oct 2024 | 487 Belvedere St | Norwood Construction | replace (1) 60 min. fire rated window at same location and size. not visible from the street.Details
replace (1) 60 min. fire rated window at same location and size. not visible from the street. | $5,000 |
| May 3, 2024 | Completed final sign-off May 2025 | 1738 48th Av | Norwood Construction | (n) exterior convience stair from 2nd floor to grade, (n) portion of 9 foot wood fence at rear yard, (n) plumbing outdoor shower head, (n) hot tub electrical hook ups.Details
(n) exterior convience stair from 2nd floor to grade, (n) portion of 9 foot wood fence at rear yard, (n) plumbing outdoor shower head, (n) hot tub electrical hook ups. | $10,000 |
| May 2, 2024 | Completed final sign-off Aug 2024 | 201 Laguna St | Norwood Construction | replace kitchen cabinetry, add new kitchen lighting, new waterline for fridge. drywall, painting, countertop.Details
replace kitchen cabinetry, add new kitchen lighting, new waterline for fridge. drywall, painting, countertop. | $20,000 |
| May 1, 2024 | Completed final sign-off May 2024 | 3256 Washington St | Norwood Construction | to obtain final inspection for work approved under 202012150982. all work is completedDetails
to obtain final inspection for work approved under 202012150982. all work is completed | |
| Feb 7, 2024 | Completed final sign-off Jul 2025 | 944 Rivera St | Norwood Construction | revision to pa# 202309086169. relocate entry closet, and door to garage at 1st floor. relocate w/d from 2nd floor to 1st floor. rebuild extg stairs.Details
revision to pa# 202309086169. relocate entry closet, and door to garage at 1st floor. relocate w/d from 2nd floor to 1st floor. rebuild extg stairs. | $12,000 |
| Jan 24, 2024 | Completed final sign-off Oct 2025 | 315 Holly Park Cr | Norwood Construction | revision to pa# 202110049737, exterior: replace front facade (e) windows in-kind in existing frame. demo (e) shack & stairs between decks, (n) bigger doors to deck @ rear of house. interior: add sink in laundry, move family room wall @ south side 3'-4" from property line. minor revisions to kitchen-Details
revision to pa# 202110049737, exterior: replace front facade (e) windows in-kind in existing frame. demo (e) shack & stairs between decks, (n) bigger doors to deck @ rear of house. interior: add sink in laundry, move family room wall @ south side 3'-4" from property line. minor revisions to kitchen- | $65,000 |
| Jan 3, 2024 | Completed final sign-off Feb 2025 | 5916 California St | Norwood Construction | kitchen and 1 bathroom remodel. no structural work.Details
kitchen and 1 bathroom remodel. no structural work. | $80,000 |
| Jan 3, 2024 | Completed final sign-off Feb 2025 | 5914 California St | Norwood Construction | kitchen and one bathroom remodel. no structural work.Details
kitchen and one bathroom remodel. no structural work. | $80,000 |
| Oct 20, 2023 | In progress issued Feb 2024 | 1101 Guerrero St | Norwood Construction | to comply with accessible business entry program of sf. ordinance 51-16. abe3: 202210205086Details
to comply with accessible business entry program of sf. ordinance 51-16. abe3: 202210205086 | $2,000 |
| Sep 26, 2023 | Completed final sign-off Dec 2023 | 201 Laguna St | Norwood Construction | demo existing bathroom. remove bathtub. install new drywall. install new tile. bath remodel.Details
demo existing bathroom. remove bathtub. install new drywall. install new tile. bath remodel. | $20,000 |
| Sep 8, 2023 | Completed final sign-off Aug 2025 | 944 Rivera St | Norwood Construction | convert (e) 1st fl garage/storage into 2 rooms down, 1 bathrm, engry and 1 car garage; 2nd fl remodel e) bathroom and add 1/2 bath; remodel kitchen and relocated w/d; 2 front windows to be replaced. tunnel entrance to be enclosed. new rear patioDetails
convert (e) 1st fl garage/storage into 2 rooms down, 1 bathrm, engry and 1 car garage; 2nd fl remodel e) bathroom and add 1/2 bath; remodel kitchen and relocated w/d; 2 front windows to be replaced. tunnel entrance to be enclosed. new rear patio | $285,000 |
| Aug 21, 2023 | Completed final sign-off Dec 2023 | 487 Belvedere St | Norwood Construction | replace 7 windows and one back sliding door. in (e) openings u less than or equal to .30. replace drywall in the hallway. approx 120 sq ft in kind.Details
replace 7 windows and one back sliding door. in (e) openings u less than or equal to .30. replace drywall in the hallway. approx 120 sq ft in kind. | $10,000 |
| Aug 3, 2023 | In progress issued Mar 2025 | 2534 Great Hy | Norwood Construction | 3rd story vertical addition; (e) small 3rd story room will be removed) and inteiror alt including new windows and cladding at front and rear facades. new exterior stair at rear.Details
3rd story vertical addition; (e) small 3rd story room will be removed) and inteiror alt including new windows and cladding at front and rear facades. new exterior stair at rear. | $625,000 |
| Jul 5, 2023 | Completed final sign-off Dec 2023 | 487 Belvedere St | Norwood Construction | amend to pa202303304685 for additional work: remodel of 1 additional bathroom (#3). new plumbing & electrical fixtures, new sheetrock, tile. no structural work. all work in-kind. no floor layout change. no wall layout change.Details
amend to pa202303304685 for additional work: remodel of 1 additional bathroom (#3). new plumbing & electrical fixtures, new sheetrock, tile. no structural work. all work in-kind. no floor layout change. no wall layout change. | $25,000 |
| Apr 28, 2023 | Completed final sign-off Feb 2025 | 462 Kansas St | Norwood Construction | interior re model 2nd fl remodel kitchen and bath, add new bath and laundry, fill in lightwell in kitchen.Details
interior re model 2nd fl remodel kitchen and bath, add new bath and laundry, fill in lightwell in kitchen. | $75,000 |
| Apr 19, 2023 | Completed final sign-off Nov 2024 | 487 Belvedere St | Norwood Construction | create an opening in the main floor for a new spiral stairway, install new spiral stairway, install guardrail at stairway openingDetails
create an opening in the main floor for a new spiral stairway, install new spiral stairway, install guardrail at stairway opening | $10,000 |
| Apr 12, 2023 | Completed final sign-off Aug 2024 | 364 Crescent Av | Norwood Construction | addition of a roof cable at the 3rd fl. rear of bld see variance approval 2022-001532 var. new roof cable will allow an (e) storage room to be converted to a bedroom with eero window to rear yard. addition = 45sf area. 2 windows and revised exterior kitchen door at rear.Details
addition of a roof cable at the 3rd fl. rear of bld see variance approval 2022-001532 var. new roof cable will allow an (e) storage room to be converted to a bedroom with eero window to rear yard. addition = 45sf area. 2 windows and revised exterior kitchen door at rear. | $45,000 |
| Mar 30, 2023 | Completed final sign-off Dec 2023 | 487 Belvedere St | Norwood Construction | two bathroom remodel. new plumbing, electric, drywall, tile. no structral work.Details
two bathroom remodel. new plumbing, electric, drywall, tile. no structral work. | $50,000 |
| Sep 23, 2022 | Completed final sign-off Feb 2023 | 95 Judah St | Norwood Construction | demo (e) kitchen cabinetry, install new cabintry and countertop. no structural work, no wall demoDetails
demo (e) kitchen cabinetry, install new cabintry and countertop. no structural work, no wall demo | $6,000 |
| Apr 5, 2022 | Completed final sign-off Aug 2022 | 25 Baywood Ct | Norwood Construction | revision to pa# 202009265149. update kitchen & laundry layout. (n) door to living area at 1st fl. updated windows & doors schedule. reduce scope of voluntary structural work at 2nd fl. eliminate addition of voluntary structural elements in areas which are not remodeled.Details
revision to pa# 202009265149. update kitchen & laundry layout. (n) door to living area at 1st fl. updated windows & doors schedule. reduce scope of voluntary structural work at 2nd fl. eliminate addition of voluntary structural elements in areas which are not remodeled. | $1,000 |
| Mar 14, 2022 | Completed final sign-off Nov 2023 | 2527 14th Av | Norwood Construction | revision to pa# 202112174627. replace (e) foundation with new foundation between (e) lightwell & garage. modify foundation work due to (e) condition.Details
revision to pa# 202112174627. replace (e) foundation with new foundation between (e) lightwell & garage. modify foundation work due to (e) condition. | $5,000 |
| Feb 23, 2022 | Expired or cancelled cancelled Jan 2026 | 101 Randall St | Norwood Construction | revision to no-plan pa# 202110120202. replace siding in 2 lightwells. replace 3 windows in lightwells. blocking up doors per plan. widen kitchen & parlot doors. widen master bathroom & master closet doors.Details
revision to no-plan pa# 202110120202. replace siding in 2 lightwells. replace 3 windows in lightwells. blocking up doors per plan. widen kitchen & parlot doors. widen master bathroom & master closet doors. | $10,000 |
| Dec 17, 2021 | Completed final sign-off Nov 2023 | 2527 14th Av | Norwood Construction | 2nd fl - remodel & expand kitchen into (e) lightwell, including (n) pl firewall from (n) foundation to above roof; remodel & expand hall bathroom into 2nd (e) lightwell & relocate washer/dryer; create (n) master en-suite bathroom; replace (e) rear window w/(n) door; refinishes floors, (n) elec @Details
2nd fl - remodel & expand kitchen into (e) lightwell, including (n) pl firewall from (n) foundation to above roof; remodel & expand hall bathroom into 2nd (e) lightwell & relocate washer/dryer; create (n) master en-suite bathroom; replace (e) rear window w/(n) door; refinishes floors, (n) elec @ | $285,100 |
| Nov 30, 2021 | Completed final sign-off May 2022 | 3529 19th St | Norwood Construction | remodel two bathrooms. new plumbing, electrical, drywall. replace three non-street facing windows.Details
remodel two bathrooms. new plumbing, electrical, drywall. replace three non-street facing windows. | $100,000 |
| Oct 12, 2021 | Completed final sign-off Oct 2022 | 101 Randall St | Norwood Construction | remodel of 2 baths and 1 kitchen. no walls to be removed. new dry wall, new plumbing and electrical @ area of remodelDetails
remodel of 2 baths and 1 kitchen. no walls to be removed. new dry wall, new plumbing and electrical @ area of remodel | $150,000 |
| Oct 6, 2021 | Completed final sign-off Feb 2025 | 1738 48th Av | Kingfish Construction Llc., Norwood Construction | vertical addtion for new kitchen, living & dining room. horizontal expansion for existing bedroom & guest room.Details
vertical addtion for new kitchen, living & dining room. horizontal expansion for existing bedroom & guest room. | $450,000 |
| Oct 4, 2021 | Completed final sign-off Oct 2025 | 315 Holly Park Cr | Norwood Construction | horizontal rear addition. 1/f: develop habitable area. add new bathroom, laundry, guest bedroom, and family room. new interior stairs from 1st to 2nd flr. 2/f: add new powder room, remodel kitchen, new windows at rear. 3/f: remodel (e) bath, add new bath and new bedroom.Details
horizontal rear addition. 1/f: develop habitable area. add new bathroom, laundry, guest bedroom, and family room. new interior stairs from 1st to 2nd flr. 2/f: add new powder room, remodel kitchen, new windows at rear. 3/f: remodel (e) bath, add new bath and new bedroom. | $425,000 |
| Oct 1, 2021 | Completed final sign-off Aug 2022 | 25 Baywood Ct | Norwood Construction | rev to pa202009265149: update to reflect (e) shared foundation condition along gridline 3.Details
rev to pa202009265149: update to reflect (e) shared foundation condition along gridline 3. | |
| Sep 13, 2021 | Completed final sign-off Feb 2022 | 95 Judah St | Norwood Construction | revision to pa# 202106243151. voluntary structural strengthening. no reconfigure of architectural layout.Details
revision to pa# 202106243151. voluntary structural strengthening. no reconfigure of architectural layout. | $3,000 |
| Aug 4, 2021 | Completed final sign-off Feb 2022 | 770 Teresita Bl | Norwood Construction | convert part of garage to conditioned laundry room & mud roomDetails
convert part of garage to conditioned laundry room & mud room | $15,000 |
| Aug 3, 2021 | Completed final sign-off Sep 2022 | 816 22nd St | Norwood Construction | replace (5) old windows with new street facing with custom wood. same size and location. u-factor 0.30 maxDetails
replace (5) old windows with new street facing with custom wood. same size and location. u-factor 0.30 max | $5,000 |
| Jul 9, 2021 | Completed final sign-off Nov 2021 | 2417 Larkin St | Norwood Construction | remove extg shingles. install new siding. paint front of building. wood shingles to wood shingles. front facade.Details
remove extg shingles. install new siding. paint front of building. wood shingles to wood shingles. front facade. | $30,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2022 | 95 Judah St | Norwood Construction | voluntary structural strengthening. no reconfiguration of architectural layout.Details
voluntary structural strengthening. no reconfiguration of architectural layout. | $80,000 |
| Jun 14, 2021 | Completed final sign-off Oct 2024 | 306 Arlington St | Norwood Construction | revision to pa# 2019-0814-8780; new dormer, interior alterations to (e) bathrooms and bedroomDetails
revision to pa# 2019-0814-8780; new dormer, interior alterations to (e) bathrooms and bedroom | $28,685 |
| Apr 16, 2021 | Completed final sign-off Sep 2022 | 1028 Church St | Norwood Construction | remodel kitchen, 2 bath in kind, no wall alteration, no structural workDetails
remodel kitchen, 2 bath in kind, no wall alteration, no structural work | $30,000 |
| Mar 10, 2021 | Never finaled issued Mar 2021, no final | 280 Ocean Av | Norwood Construction | replace seven (7) street facing windows. same size & same location. fiberglass windowsDetails
replace seven (7) street facing windows. same size & same location. fiberglass windows | $10,000 |
| Feb 26, 2021 | Completed final sign-off Mar 2022 | 462 Kansas St | Norwood Construction | replace two existing windows at front door of property. like for like, no rough opening changes. u- factor for window replacement shall not exceed 0.30 - alumonum to aluminumDetails
replace two existing windows at front door of property. like for like, no rough opening changes. u- factor for window replacement shall not exceed 0.30 - alumonum to aluminum | $1,500 |
| Feb 26, 2021 | Completed final sign-off Apr 2021 | 1951 Golden Gate Av | Norwood Construction | demo existing tile and drywall. install new tile and shower valve. install new door. bathroom remodelDetails
demo existing tile and drywall. install new tile and shower valve. install new door. bathroom remodel | $18,000 |
| Jan 19, 2021 | Completed final sign-off Oct 2021 | 234 Ritch St | Norwood Construction | two bathroom remodel, new drywall, new electrical and plumbing. no change to wall & opening layout.no fire sprinkler alarm modifications.Details
two bathroom remodel, new drywall, new electrical and plumbing. no change to wall & opening layout.no fire sprinkler alarm modifications. | $60,000 |
| Jan 5, 2021 | Never finaled issued Jan 2021, no final | 25 Glover St | Norwood Construction | dry rot repair 256sf of back of building. install 3 new window and exterior door. replace siding. not street facing windows and doorDetails
dry rot repair 256sf of back of building. install 3 new window and exterior door. replace siding. not street facing windows and door | $40,000 |
| Dec 22, 2020 | Never finaled issued Dec 2020, no final | 5827 Diamond Heights Bl | Norwood Construction | kitchen remodel, new flooring throughout, new front & back doorsDetails
kitchen remodel, new flooring throughout, new front & back doors | $80,000 |
| Dec 15, 2020 | Expired or cancelled expired May 2024 | 3256 Washington St | Norwood Construction | replace (e) deck deck boards with new ipe tile, less than 50% replacement.Details
replace (e) deck deck boards with new ipe tile, less than 50% replacement. | $15,000 |
| Nov 18, 2020 | Expired or cancelled expired Jan 2024 | 83 Shotwell St | Norwood Construction | remove 3 non bearing opening in hallwayDetails
remove 3 non bearing opening in hallway | $1,500 |
| Nov 17, 2020 | Completed final sign-off Mar 2022 | 462 Kansas St | Norwood Construction | reconfigure (e) front entry stairs. resurface (e) garage roof deck. change (e) deck railing.Details
reconfigure (e) front entry stairs. resurface (e) garage roof deck. change (e) deck railing. | $20,000 |
| Nov 5, 2020 | Completed final sign-off Feb 2021 | 2101 Larkin St | Norwood Construction | demo (e) rotten shingles, install insulation and plywood new shingles. to comply with nov 202064482.Details
demo (e) rotten shingles, install insulation and plywood new shingles. to comply with nov 202064482. | $50,000 |
| Oct 8, 2020 | Completed final sign-off May 2023 | 2834 Mission St | Norwood Construction | removal of old existing wood railings and replace with new metal railings as per structural engineers drawings.Details
removal of old existing wood railings and replace with new metal railings as per structural engineers drawings. | $50,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2022 | 25 Baywood Ct | Zen Construction, Norwood Construction | 1/f habitable space: add (n) bathroom, bedroom, family room & laundry. relocate interior stairs. 2/f: remodel (e) kitchen, replace (e) rear yard retainting wall.Details
1/f habitable space: add (n) bathroom, bedroom, family room & laundry. relocate interior stairs. 2/f: remodel (e) kitchen, replace (e) rear yard retainting wall. | |
| Jul 20, 2020 | Completed final sign-off Aug 2020 | 400 Grove St | Norwood Construction | building a (n) ac unit. building a (n) closetDetails
building a (n) ac unit. building a (n) closet | $50,000 |
| Mar 9, 2020 | Completed final sign-off Jan 2021 | 3531 19th St | Norwood Construction | replace tile in 1 bathroom (shower wall tile and bathroom floor tile). replace shower pan.Details
replace tile in 1 bathroom (shower wall tile and bathroom floor tile). replace shower pan. | $5,000 |
| Mar 4, 2020 | Completed final sign-off Aug 2020 | 571 Missouri St | Norwood Construction | replace 120 sqft of sidingDetails
replace 120 sqft of siding | $5,000 |
| Aug 14, 2019 | Completed final sign-off Oct 2024 | 306 Arlington St | Norwood Construction | alteration to the demmer residence. two new dormers at 3rd flr. new bedroom.Details
alteration to the demmer residence. two new dormers at 3rd flr. new bedroom. | $36,832 |
| Jul 24, 2019 | Completed final sign-off Dec 2019 | 1177 Stanyan St | Norwood Construction | replacing 2 windows not facing street. ref #201905201133Details
replacing 2 windows not facing street. ref #201905201133 | $800 |
| Jul 18, 2019 | Completed final sign-off Aug 2019 | 511 Missouri St | Norwood Construction | rev to pa 201901180765; relocate shearwall on 2nd fl to gridline c.Details
rev to pa 201901180765; relocate shearwall on 2nd fl to gridline c. | |
| May 30, 2019 | Completed final sign-off Aug 2019 | 1335 Kearny St | Norwood Construction | repair existing rear deck less than 50%.Details
repair existing rear deck less than 50%. | $15,000 |
| May 20, 2019 | Completed final sign-off Dec 2019 | 1177 Stanyan St | Norwood Construction | demo of existing kitchen . new electrical, plumbing and drywall. install new cabinetry and countertop. no structural work. no framing modificationDetails
demo of existing kitchen . new electrical, plumbing and drywall. install new cabinetry and countertop. no structural work. no framing modification | $80,000 |
| Jan 22, 2019 | Completed final sign-off Dec 2019 | 1177 Stanyan St | Norwood Construction | remodle 2 bathroom. upgrade electricl, plumbing. new drywall. nw shower fixtrues, 60sq ft and 40sq ft.Details
remodle 2 bathroom. upgrade electricl, plumbing. new drywall. nw shower fixtrues, 60sq ft and 40sq ft. | $60,000 |
| Jan 18, 2019 | Completed final sign-off Aug 2019 | 511 Missouri St | Norwood Construction | new rear deck off 2nd floor. add slider from kitchen to (n) deck. close window @ rear wall of utility room. add (n) shearwallsDetails
new rear deck off 2nd floor. add slider from kitchen to (n) deck. close window @ rear wall of utility room. add (n) shearwalls | $100,000 |
| Nov 13, 2018 | Completed final sign-off Aug 2019 | 511 Missouri St | Norwood Construction | kitchen & 2 bath remodels, opening kitchen wall and inistalling heads, new plumbing, electric, floors, drywallDetails
kitchen & 2 bath remodels, opening kitchen wall and inistalling heads, new plumbing, electric, floors, drywall | $120,000 |
| Jul 11, 2018 | Completed final sign-off Feb 2019 | 461 14th St | Norwood Construction | repair existing siding at back of building and lightwell. existing structural sheathing to remain, in-kind replacement, not visible from street.Details
repair existing siding at back of building and lightwell. existing structural sheathing to remain, in-kind replacement, not visible from street. | $30,000 |
| Jul 9, 2018 | Completed final sign-off Dec 2018 | 769 Dolores St | Norwood Construction | kitchen remodel. one full bath and one half bath remodelDetails
kitchen remodel. one full bath and one half bath remodel | $70,000 |
| Sep 26, 2017 | Completed final sign-off Jun 2018 | 9 Jade Pl | Norwood Construction | replacing existing lanai on 2nd fl deck.Details
replacing existing lanai on 2nd fl deck. | $48,000 |
| Jul 21, 2017 | Never finaled issued Jul 2017, no final | 160 Gilbert St | Norwood Construction | administrative permit revision to pa # 2016.0505.6621 to document the change of use from s-2 to s-1 & b. no physical work is associated with this permitDetails
administrative permit revision to pa # 2016.0505.6621 to document the change of use from s-2 to s-1 & b. no physical work is associated with this permit | |
| Jun 23, 2017 | Expired or cancelled cancelled Aug 2017 | 160 Gilbert St | Norwood Construction | administrative permit to revise scope of work verbage on bpa# 201605056621, new verbage : no change of use mcd warehouse (s2) non high pile storage, sprinklers not requiredDetails
administrative permit to revise scope of work verbage on bpa# 201605056621, new verbage : no change of use mcd warehouse (s2) non high pile storage, sprinklers not required | |
| Apr 21, 2017 | Completed final sign-off Jan 2018 | 3920 25th St | Norwood Construction | repair to existing interior stairway of entry, less than 50%Details
repair to existing interior stairway of entry, less than 50% | $9,000 |
| Jun 9, 2016 | Completed final sign-off Sep 2016 | 64 Linda St | Norwood Construction | two bathroom remodel, new fixtures, tiles, drywall, one bath remodel in ea ch unit 2 baths totalDetails
two bathroom remodel, new fixtures, tiles, drywall, one bath remodel in ea ch unit 2 baths total | $40,000 |
| Jun 1, 2016 | Completed final sign-off Jul 2016 | 1726 47th Av | Norwood Construction | bathroom remodel, new drywall,tiles, and fixtures.Details
bathroom remodel, new drywall,tiles, and fixtures. | $12,000 |
| Jun 1, 2016 | Never finaled issued Jun 2016, no final | 1726 47th Av | Norwood Construction | demo of old existing. construction of new deck with railing and stairs.Details
demo of old existing. construction of new deck with railing and stairs. | $8,000 |
| May 12, 2016 | Completed final sign-off Jul 2016 | 1726 47th Av | Norwood Construction | remove load bearing wall between kitchen and living. replace kitchen cabinets with new.Details
remove load bearing wall between kitchen and living. replace kitchen cabinets with new. | $25,000 |
| Jan 22, 2016 | Completed final sign-off Feb 2016 | 816 22nd St | Norwood Construction | repair all stairs, install two new stringers & steps, ( less than 50% of stairs), exterior stair @ rear.Details
repair all stairs, install two new stringers & steps, ( less than 50% of stairs), exterior stair @ rear. | $1,000 |
| Oct 27, 2015 | Completed final sign-off Mar 2016 | 3830 23rd St | Norwood Construction | to comply with nov# 201568722, repair dry rot on existing back stairs and deck, less than 50%Details
to comply with nov# 201568722, repair dry rot on existing back stairs and deck, less than 50% | $5,000 |
| Sep 25, 2015 | Completed final sign-off Oct 2017 | 4096 17th St | Norwood Construction | addition of washer and dryer(electric) in extg hallway closet adjacent to bathroom.Details
addition of washer and dryer(electric) in extg hallway closet adjacent to bathroom. | $16,000 |
| Jun 16, 2015 | Never finaled issued Jun 2015, no final | 1880 Green St | Norwood Construction | opening of shear wall, installing steel frame.Details
opening of shear wall, installing steel frame. | $8,000 |