Daniel Levine
- Listed as
- architect, authorized agent-others, engineer
- Firm
- The John Stewart Company
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Sep 2026
38 permits since 2000 (architect on 37 permits, authorized agent-others on 2 permits, engineer on 1 permit): 24 completed, 7 in progress, 2 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 1388 Sutter St | 11th floor. modify existing open space and create 8 individual office.Details
11th floor. modify existing open space and create 8 individual office. | $6,000 | |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 151 Joice St | Amone Corp | replacement of all windows and sliding glass doors at residential floors 1 through 3. (building d)Details
replacement of all windows and sliding glass doors at residential floors 1 through 3. (building d) | $650,000 |
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 945 Sacramento St | Amone Corp | replacement of all window and sliding glass doors at residential floors: building t- floors 2 through 12, buildings a & b - floors 1 through 4, building c & d: floors 1 through 3Details
replacement of all window and sliding glass doors at residential floors: building t- floors 2 through 12, buildings a & b - floors 1 through 4, building c & d: floors 1 through 3 | $3,800,000 |
| May 29, 2026 | In progress issued Aug 2026 | 150 09th St | D.F.P.F Corp Dba Fine Line Construction | revision to pa #202305026865-s2. revision to miscellaneous in field changed items to previous approved addendum 2 mechanical, electrical and plumbing drawings.Details
revision to pa #202305026865-s2. revision to miscellaneous in field changed items to previous approved addendum 2 mechanical, electrical and plumbing drawings. | |
| Dec 24, 2025 | In progress issued Jan 2026 | 150 09th St | D.F.P.F Corp Dba Fine Line Construction | revision to pa #202305026865 s2 to address 7/10/2025 correction notice: clarification to 3/25/24 ab-005 as updated 12/22/25 re: ceiling finishes at basementDetails
revision to pa #202305026865 s2 to address 7/10/2025 correction notice: clarification to 3/25/24 ab-005 as updated 12/22/25 re: ceiling finishes at basement | |
| Jan 24, 2025 | In progress issued Feb 2025 | 150 09th St | D.F.P.F Corp Dba Fine Line Construction | exterior siding repairs at washburn street elevation: interior wood framing repairs for existing walls and joists from gound fl. to roof(unit stack x 20, x21, x22) and interior finishes repairs. all other gray out scope of work on plans under seperate approved permit application #202305026865.Details
exterior siding repairs at washburn street elevation: interior wood framing repairs for existing walls and joists from gound fl. to roof(unit stack x 20, x21, x22) and interior finishes repairs. all other gray out scope of work on plans under seperate approved permit application #202305026865. | $85,000 |
| May 2, 2023 | In progress issued Apr 2024 | 150 09th St | D.F.P.F Corp Dba Fine Line Construction | mayor dir 13-01. 100% affordable housing. comprehensive alterations, upgrades, & repairs to (e) el dorado res. hotel/(e) sro 4-story 57 units to increase to 62 residential public housing sleeping units.Details
mayor dir 13-01. 100% affordable housing. comprehensive alterations, upgrades, & repairs to (e) el dorado res. hotel/(e) sro 4-story 57 units to increase to 62 residential public housing sleeping units. | $9,000,000 |
| Sep 16, 2022 | Completed final sign-off May 2024 | 1240 Fillmore St | D.F.P.F Corp Dba Fine Line Construction | revision to original permit #201912270828 approved pm 06/16/2021. new mail and package room w/ new usps mailboxes, new interior storefront system at manager and service offices; add kitchenette at (e) conference rm 2; management office re-organization.Details
revision to original permit #201912270828 approved pm 06/16/2021. new mail and package room w/ new usps mailboxes, new interior storefront system at manager and service offices; add kitchenette at (e) conference rm 2; management office re-organization. | $150,000 |
| Apr 1, 2022 | Never finaled issued Apr 2022, no final | 1388 Sutter St | Excolo Construction Services | renovation at 10th & 11th fl office. (n) demising wall & conference room at 10th fl. design build any elec & mechanical elements for (n) private offices + conf room.(n) waterline at relocated pantry cab. 11th fl: (n) conference room. design build any elec, mech. fire sprinkler work on seperate permDetails
renovation at 10th & 11th fl office. (n) demising wall & conference room at 10th fl. design build any elec & mechanical elements for (n) private offices + conf room.(n) waterline at relocated pantry cab. 11th fl: (n) conference room. design build any elec, mech. fire sprinkler work on seperate perm | $75,000 |
| Jul 13, 2021 | Completed final sign-off Oct 2023 | 1240 Fillmore St | L P G Fire Protection Inc | fire sprinkler- install a fire & sprinkler syster for ground fl. 1-13 floors inside units and elevator lobby. ref app#201912270828. 1426 sprinkler heads.Details
fire sprinkler- install a fire & sprinkler syster for ground fl. 1-13 floors inside units and elevator lobby. ref app#201912270828. 1426 sprinkler heads. | $675,000 |
| Dec 27, 2019 | Completed final sign-off May 2024 | 1240 Fillmore St | D.F.P.F Corp Dba Fine Line Construction | conversion of(8) ada units, selective seismic strengthening, replacement of exterior windows, selected roof replacement,(n)residence activity space @ (e) bldg envelope, finishes upgrade @ lobby, office, common community spaces & restrom upgrades, fire sprinkler upgrade, generator replacement.Details
conversion of(8) ada units, selective seismic strengthening, replacement of exterior windows, selected roof replacement,(n)residence activity space @ (e) bldg envelope, finishes upgrade @ lobby, office, common community spaces & restrom upgrades, fire sprinkler upgrade, generator replacement. | $15,000,000 |
| Sep 10, 2019 | Completed final sign-off Jul 2021 | 3101 Mission St | Midstate Construction Corporation | selective replacement of unit interior items per unit interior replacement schedule. various accessibility upgrades at units and site. bldg mechanical system upgrade, paint all previously painted exterior surfaces, remove and replace membrane roofing atDetails
selective replacement of unit interior items per unit interior replacement schedule. various accessibility upgrades at units and site. bldg mechanical system upgrade, paint all previously painted exterior surfaces, remove and replace membrane roofing at | $2,500,000 |
| Jun 28, 2019 | Expired or cancelled cancelled Aug 2023 | 1031 Franklin St | no work performed on existing structure. drawings for sffd occupancy load only.Details
no work performed on existing structure. drawings for sffd occupancy load only. | ||
| May 29, 2019 | Completed final sign-off Dec 2019 | 1000 Tompkins Av | Midstate Construction Corporation | revision to 2018-1210-7904 (original pa) & 2019-0213-2834 (revision to pa 2018-1210-7904) - structural construction system for the new community room, kitchen and accessible restroomsDetails
revision to 2018-1210-7904 (original pa) & 2019-0213-2834 (revision to pa 2018-1210-7904) - structural construction system for the new community room, kitchen and accessible restrooms | |
| Jan 11, 2019 | Never finaled issued Dec 2019, no final | 820 Ofarrell St | Castle Construction | selected replacement of unit interior items and finishes per unit interior replacement schedule; paint all previously painted exterior surfaces; new sumppit, reinstall extg sump pump after installation of new sump pit; installation of nw conc. slab at extg community room;Details
selected replacement of unit interior items and finishes per unit interior replacement schedule; paint all previously painted exterior surfaces; new sumppit, reinstall extg sump pump after installation of new sump pit; installation of nw conc. slab at extg community room; | $250,000 |
| Dec 10, 2018 | Completed final sign-off Dec 2019 | 1000 Tompkins Av | Midstate Construction Corporation | selected replacement of unit interior items & finishes per unit interior replacement schedule; paint ext surfaces; replacement of e w/h: see units; renovate of e leasing office & laundry; new community rm, kitchen, & accessible restrms; new landscape & play structure & ground finishes @ e courtyard;Details
selected replacement of unit interior items & finishes per unit interior replacement schedule; paint ext surfaces; replacement of e w/h: see units; renovate of e leasing office & laundry; new community rm, kitchen, & accessible restrms; new landscape & play structure & ground finishes @ e courtyard; | $2,900,000 |
| Aug 8, 2018 | Completed final sign-off Jan 2019 | 52 Middle Point Rd | Andrew Chekene Enterprises/ Dba Ac Enter | install new wire mesh fence with gate. replce (e) double metal door for a 1/2 safe glass and louvers. install a new window 5'0 6'0 alumn not visible from streetDetails
install new wire mesh fence with gate. replce (e) double metal door for a 1/2 safe glass and louvers. install a new window 5'0 6'0 alumn not visible from street | $7,000 |
| Aug 8, 2018 | Completed final sign-off Jan 2019 | 61 West Point Rd | Andrew Chekene Enterprises/ Dba Ac Enter | install new wire mesh fence with gate. replce (e) double metal door for a 1/2 safe glassDetails
install new wire mesh fence with gate. replce (e) double metal door for a 1/2 safe glass | $5,000 |
| Aug 1, 2018 | Completed final sign-off Sep 2019 | 1615 Sutter St | City Builders | remove extg plumbing fixtures, lighting and other bath accessories. remove portion of wall by bath entrance for larger door opening. new accessible toilet, lav, lighting, accessories, gfci outlet and electrical in both bath.Details
remove extg plumbing fixtures, lighting and other bath accessories. remove portion of wall by bath entrance for larger door opening. new accessible toilet, lav, lighting, accessories, gfci outlet and electrical in both bath. | $45,000 |
| Apr 17, 2015 | Completed final sign-off Jul 2016 | 1353 07th Av | Icon Commercial Contractors Inc | units 201-210, units 303-301. units 402-410: replace, in kind-kitchen cabinets, fixtures, finishes of 30 units and common areas. additional work includes replacement of (e) roof, shingle siding @ rear of bldg & penthouse, garage door and motor and elastometric surface at deck. n/a for maher.Details
units 201-210, units 303-301. units 402-410: replace, in kind-kitchen cabinets, fixtures, finishes of 30 units and common areas. additional work includes replacement of (e) roof, shingle siding @ rear of bldg & penthouse, garage door and motor and elastometric surface at deck. n/a for maher. | $900,000 |
| Feb 7, 2008 | Expired or cancelled expired Jun 2009 | 129 Eureka St | Lewis M Merlo Inc | removal of exiting retaining wall and construct new retaining wall in its place.Details
removal of exiting retaining wall and construct new retaining wall in its place. | $200,000 |
| Jan 31, 2008 | Completed final sign-off Jan 2009 | 118 Diamond St | John Steward Company | misc repairs including minor bathroom remodel, installing pneumatic trash opener at each floor, 1 carbinet and counter top replacement and restriping at garage. waterproofing of 7 decks on the 2nd floor. wood deck repairs.Details
misc repairs including minor bathroom remodel, installing pneumatic trash opener at each floor, 1 carbinet and counter top replacement and restriping at garage. waterproofing of 7 decks on the 2nd floor. wood deck repairs. | $110,000 |
| Aug 13, 2007 | Expired or cancelled expired Jun 2009 | 118 Diamond St | Lewis M Merlo Inc | installation of (n) concrete retaining wall. remove existing.Details
installation of (n) concrete retaining wall. remove existing. | $200,000 |
| Dec 21, 2006 | Completed final sign-off Jun 2007 | 765 Stockton St | alteration of (e) public men's & women's restrooms to comply with current ada requirement including relocation of toilet, removal of toilet partition wall and toilet accessaries, install new partition wall and accessaries. replace wall tiles and doors in kind.Details
alteration of (e) public men's & women's restrooms to comply with current ada requirement including relocation of toilet, removal of toilet partition wall and toilet accessaries, install new partition wall and accessaries. replace wall tiles and doors in kind. | $8,500 | |
| May 8, 2006 | Completed final sign-off Feb 2007 | 55 Cashmere St | (bldg 1 55-85 cashmere) maintenance repair & rehab of (e) apts selective replacement of interior finishes cabients door & plumbing fixtures selective replacement of (e) sliding glass doors with in kind matching doors repair & replacement of waterproof deck coating bldg railing & deck repairs boilerDetails
(bldg 1 55-85 cashmere) maintenance repair & rehab of (e) apts selective replacement of interior finishes cabients door & plumbing fixtures selective replacement of (e) sliding glass doors with in kind matching doors repair & replacement of waterproof deck coating bldg railing & deck repairs boiler | $110,000 | |
| May 8, 2006 | Expired or cancelled expired Feb 2007 | 10 Cashmere St | West Coast Contractors Inc. | (unit 20 cashmere )(bldg 3) fire, smoke and water damage repair at existing apartment unit 20 cashmere street including replacement of interior finishes and fixtures, window & siding replacing with new to match existing, and minor structural repair to wall and roof framing.Details
(unit 20 cashmere )(bldg 3) fire, smoke and water damage repair at existing apartment unit 20 cashmere street including replacement of interior finishes and fixtures, window & siding replacing with new to match existing, and minor structural repair to wall and roof framing. | $100,000 |
| May 8, 2006 | Completed final sign-off Feb 2007 | 1 Reuel Ct | West Coast Contractors Inc. | maintenace repair & rehab of (e)apts. including selective replacement of interior finishes,cabinets,doors & plumbing fixtures.selective replacement of (e)sliding glass doors with in kind matching doors, repair & replace waterproof deck coating,building,railing & deck repairs.Details
maintenace repair & rehab of (e)apts. including selective replacement of interior finishes,cabinets,doors & plumbing fixtures.selective replacement of (e)sliding glass doors with in kind matching doors, repair & replace waterproof deck coating,building,railing & deck repairs. | $100,000 |
| May 8, 2006 | Completed final sign-off Feb 2007 | 65 Reuel Ct | West Coast Contractors Inc. | maintenance repair & rehab of (e)apts.including selective replacement of interior finishes,cabinets,doors & plumbing fixtures, selective replacement of (e)sliding glass doors with in kind matching doors, repair & replace of waterproof deck coating, building, railing & deck repair.replace boiler ,Details
maintenance repair & rehab of (e)apts.including selective replacement of interior finishes,cabinets,doors & plumbing fixtures, selective replacement of (e)sliding glass doors with in kind matching doors, repair & replace of waterproof deck coating, building, railing & deck repair.replace boiler , | $90,000 |
| May 8, 2006 | Completed final sign-off Feb 2007 | 50 Cashmere St | maintenance repair & rehab of (e) apts.including selective replacement of interior finishes,cabinets,doors & plumbing fixtures, selective replacement of (e)sliding glass doors with in kind matching doors. repair & replacement of waterproofing deck coating. building, railing & deck reapirs.Details
maintenance repair & rehab of (e) apts.including selective replacement of interior finishes,cabinets,doors & plumbing fixtures, selective replacement of (e)sliding glass doors with in kind matching doors. repair & replacement of waterproofing deck coating. building, railing & deck reapirs. | $160,000 | |
| Mar 10, 2006 | Completed final sign-off Feb 2007 | 70 Reuel Ct | West Coast Contractors Inc. | maintenance repair & rehab of (e) apartments, including selective replacement of interior finishes, cabinets, doors & plumbing fixtures; selective replacement of (e) sliding glass doors with in-kind matching doors; repair & replacement of waterproof deck coating; building, railing & deck repairs;Details
maintenance repair & rehab of (e) apartments, including selective replacement of interior finishes, cabinets, doors & plumbing fixtures; selective replacement of (e) sliding glass doors with in-kind matching doors; repair & replacement of waterproof deck coating; building, railing & deck repairs; | $120,000 |
| Mar 10, 2006 | Completed final sign-off Jan 2007 | 10 Reuel Ct | West Coast Contractors Inc. | maintenance repair & rehab of (e) apartments, including selective replacement of interior finishes, cabinets, doors & plumbing fixtures; selective replacement of (e) sliding glass doors with in-kind matching doors; repair & replacement of waterproof deck coating; building, railing & deck repairs;Details
maintenance repair & rehab of (e) apartments, including selective replacement of interior finishes, cabinets, doors & plumbing fixtures; selective replacement of (e) sliding glass doors with in-kind matching doors; repair & replacement of waterproof deck coating; building, railing & deck repairs; | $120,000 |
| Mar 10, 2006 | Completed final sign-off Feb 2007 | 603 Keith St | West Coast Contractors Inc. | maintenance repair & rehab of (e) apartments, including selective replacement of interior finishes, cabinets, doors & plumbing fixtures; selective replacement of (e) sliding glass doors with in-kind matching doors; repair & replacement of waterproof deck coating; building, railing & deck repairs;Details
maintenance repair & rehab of (e) apartments, including selective replacement of interior finishes, cabinets, doors & plumbing fixtures; selective replacement of (e) sliding glass doors with in-kind matching doors; repair & replacement of waterproof deck coating; building, railing & deck repairs; | $120,000 |
| Mar 10, 2006 | Completed final sign-off Feb 2007 | 40 Reuel Ct | West Coast Contractors Inc. | maintenance repair & rehab of (e) apartments, including selective replacement of interior finishes, cabinets, doors & plumbing fixtures; selective replacement of (e) sliding glass doors with in-kind matching doors; repair & replacement of waterproof deck coating; building, railing & deck repairs;Details
maintenance repair & rehab of (e) apartments, including selective replacement of interior finishes, cabinets, doors & plumbing fixtures; selective replacement of (e) sliding glass doors with in-kind matching doors; repair & replacement of waterproof deck coating; building, railing & deck repairs; | $120,000 |
| Dec 22, 2005 | Completed final sign-off Feb 2007 | 10 Cashmere St | maintenance rehab of interior finishes, exterior decks and walkways boilers and plmg fixures/new exterior entry ramp at 40 cashmere/new sliding glass doors to match extg;reroofing under separate permit/no wndw replacement in bdrmsDetails
maintenance rehab of interior finishes, exterior decks and walkways boilers and plmg fixures/new exterior entry ramp at 40 cashmere/new sliding glass doors to match extg;reroofing under separate permit/no wndw replacement in bdrms | $200,000 | |
| Dec 22, 2005 | Completed final sign-off Feb 2007 | 1340 Hudson Av | landscaping and sitework, repair and replacement/site contains 11 bldgs consisting of 130 units. creating new off street trash corrals.Details
landscaping and sitework, repair and replacement/site contains 11 bldgs consisting of 130 units. creating new off street trash corrals. | $250,000 | |
| Oct 28, 2005 | Completed final sign-off Feb 2007 | 5 Cashmere St | interior and exterior rehab including re-roofing, gutter and dowspourt replacement, includ sliding glass door replacement. not visible from street. new waterproof deck coating, bldg and deck repairs, interior finishes, boiler replacement. railing replacement and miscellaneous interior and exteriorDetails
interior and exterior rehab including re-roofing, gutter and dowspourt replacement, includ sliding glass door replacement. not visible from street. new waterproof deck coating, bldg and deck repairs, interior finishes, boiler replacement. railing replacement and miscellaneous interior and exterior | $100,000 | |
| May 5, 2005 | Completed final sign-off Aug 2005 | 40 Reuel Ct | construction of 2 concrete entry ramps and 1 wood framed ramped entry bridge. unit alteration@40 rueDetails
construction of 2 concrete entry ramps and 1 wood framed ramped entry bridge. unit alteration@40 rue | $20,000 | |
| Mar 14, 2000 | Expired or cancelled expired Jul 2000 | 1301 Gateview - Ti Av | handicap access alt at 2 units of 4 unit bldg primary path of travel & parking alterationsDetails
handicap access alt at 2 units of 4 unit bldg primary path of travel & parking alterations | $2,000 |