John Spanier
- Listed as
- architect, authorized agent-others, designer
- Firm
- Spanier Architecture
- Based in
- Oakland
- On San Francisco permits
- Dec 2008 to Mar 2022
27 permits since 2000 (architect on 23 permits, authorized agent-others on 3 permits, designer on 1 permit): 20 completed, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 22, 2022 | Expired or cancelled cancelled Jan 2026 | 1028 Market St | ground fl t.i. for base building co-working amenity space. space to include functionality similar to a commercial office space. space including: small conference room, phone room, work seating, communal seating, and kitchenette. total area of work = 1296 sqft.Details
ground fl t.i. for base building co-working amenity space. space to include functionality similar to a commercial office space. space including: small conference room, phone room, work seating, communal seating, and kitchenette. total area of work = 1296 sqft. | $500,000 | |
| Mar 9, 2020 | Never finaled issued Feb 2021, no final | 550 Kearny St | Novo Construction Inc | 7th fl - ti to include new non-structural partitions, ceiling tiles and grid, doors and hardware. mep includedDetails
7th fl - ti to include new non-structural partitions, ceiling tiles and grid, doors and hardware. mep included | $900,000 |
| Jan 27, 2020 | Completed final sign-off Oct 2020 | 550 Kearny St | Novo Construction Inc | demo of non-structural partitions & millwork. reference sprinkler pa# 2020-0124-2698Details
demo of non-structural partitions & millwork. reference sprinkler pa# 2020-0124-2698 | $10,000 |
| Sep 18, 2019 | Completed final sign-off Dec 2019 | 214 Twin Peaks Bl | Doyle Developments | repair and replace e deck, guardrails, stair, fence, gate adjacent to and above garageDetails
repair and replace e deck, guardrails, stair, fence, gate adjacent to and above garage | $25,000 |
| Sep 4, 2019 | Never finaled issued Sep 2019, no final | 650 California St | Skyline Construction | 1st fl - change of use for annex from b business to a2 assembly. ti ref pa 2018-0130-9904Details
1st fl - change of use for annex from b business to a2 assembly. ti ref pa 2018-0130-9904 | |
| Aug 8, 2019 | Completed final sign-off Dec 2019 | 46 Manchester St | Cronin Construction & Development Inc. | to comply with nov# 201969044, replace deteriorated framing at roof structure demensions to remain the same as pa# 201411262604Details
to comply with nov# 201969044, replace deteriorated framing at roof structure demensions to remain the same as pa# 201411262604 | $8,000 |
| Jul 22, 2019 | Completed final sign-off Jan 2020 | 550 Kearny St | Novo Construction Inc | tenant improvement on the 2nd floor to include new non-structural partitions ceilin tile and grids, mep under sep permitDetails
tenant improvement on the 2nd floor to include new non-structural partitions ceilin tile and grids, mep under sep permit | $850,000 |
| Jun 3, 2019 | Never finaled issued Jun 2019, no final | 550 Kearny St | Novo Construction Inc | revision to pa# 2019-0426-9050 to demo existing double door 900b, revise paitition type in restroom to standard floor mounted toilet stall add door 900c. misc mep revision.Details
revision to pa# 2019-0426-9050 to demo existing double door 900b, revise paitition type in restroom to standard floor mounted toilet stall add door 900c. misc mep revision. | |
| May 1, 2019 | Completed final sign-off Dec 2019 | 214 Twin Peaks Bl | Doyle Developments | replace decks & stairs. pour 4" slab, add new hand rails, install new windows, new shinglesDetails
replace decks & stairs. pour 4" slab, add new hand rails, install new windows, new shingles | $70,000 |
| Apr 24, 2019 | Completed final sign-off Jan 2020 | 550 Kearny St | Novo Construction Inc | interior demolition on the 2nd floor per ab-017.Details
interior demolition on the 2nd floor per ab-017. | $20,000 |
| Dec 21, 2017 | Completed final sign-off Oct 2018 | 420 Mason St | Arroyo Realty & Development Llc | revision to 201708306467. occpancy load calculation. revisin and entry update due to infeasibility of original plan. proposed plan has been reviewed and drawn per rick halloran. maher naDetails
revision to 201708306467. occpancy load calculation. revisin and entry update due to infeasibility of original plan. proposed plan has been reviewed and drawn per rick halloran. maher na | |
| Nov 8, 2017 | Never finaled issued Jan 2018, no final | 420 Mason St | Arroyo Realty & Development Llc | demolish and replace non-historic entry finishes,update (e) non-historic entry door details, remove(e) non-historic marquee signage details & shorten height of (e)signage support. update (e) marquee canopy ceiling & trim. marquee signage update under separte permit. ** maher: n/a **Details
demolish and replace non-historic entry finishes,update (e) non-historic entry door details, remove(e) non-historic marquee signage details & shorten height of (e)signage support. update (e) marquee canopy ceiling & trim. marquee signage update under separte permit. ** maher: n/a ** | $12,500 |
| Aug 30, 2017 | Completed final sign-off Oct 2018 | 420 Mason St | Arroyo Realty & Development Llc | demo int. non-struct. walls, lobby floor section for accessible entrance, lobby finishes, (e) service bars, (e) bathrm fixtures, finishes & (e) entry slide in preparation of new interior alteration. new basement work includes new lounge and restaurant seating, new bowling lanes, & int. finishes,Details
demo int. non-struct. walls, lobby floor section for accessible entrance, lobby finishes, (e) service bars, (e) bathrm fixtures, finishes & (e) entry slide in preparation of new interior alteration. new basement work includes new lounge and restaurant seating, new bowling lanes, & int. finishes, | $800,000 |
| Sep 2, 2016 | Completed final sign-off Dec 2018 | 1970 Jefferson St | Quick Connect Electric Co | removal of wall at rear of 3rd floor for enlarged bedroom & replacement of windows at rear of 3rd floor.Details
removal of wall at rear of 3rd floor for enlarged bedroom & replacement of windows at rear of 3rd floor. | $75,000 |
| Dec 22, 2015 | Completed final sign-off Dec 2016 | 1558 23rd Av | Calidad Construction | remodel of (e) basement for addition of new living space including new bedroom, new bathroom and new family room, connect to existing 1/f living space by (e) visually open connecting stair, relocate laundry.Details
remodel of (e) basement for addition of new living space including new bedroom, new bathroom and new family room, connect to existing 1/f living space by (e) visually open connecting stair, relocate laundry. | $268,000 |
| Oct 30, 2015 | Completed final sign-off Aug 2016 | 15 Emerson St | C & K Housing Const Co *Ck Id* | remodel of (e) basement for addition of new living space, including new master bedroom, new master bathrm,&new powder rm,connected to (e)1st flr living space by (e)visually open connecting stair,relocate (e)laundry,furnace;water heaterDetails
remodel of (e) basement for addition of new living space, including new master bedroom, new master bathrm,&new powder rm,connected to (e)1st flr living space by (e)visually open connecting stair,relocate (e)laundry,furnace;water heater | $80,000 |
| Sep 17, 2015 | Completed final sign-off Sep 2015 | 821 Marina Bl | Calidad Construction | revision to #201412244477- clarify scope of work to reflect as built condition: clarifying front flat roof w/decorative metal railing & no windscreens from scope of work. balconies as built condition metal balconies. replace door @ rear & replace 2 (e) windows in front w/sames size same lococation.Details
revision to #201412244477- clarify scope of work to reflect as built condition: clarifying front flat roof w/decorative metal railing & no windscreens from scope of work. balconies as built condition metal balconies. replace door @ rear & replace 2 (e) windows in front w/sames size same lococation. | $2,900 |
| Dec 24, 2014 | Completed final sign-off Sep 2015 | 821 Marina Bl | Calidad Construction | remove (e) metal balconies at front elevation of 1st & 2nd floors and replace w/ (n) balconies. add (n) flat roof at street elevations & replace w / ptd stucco, replace windows with aluminum-clad wood sash.Details
remove (e) metal balconies at front elevation of 1st & 2nd floors and replace w/ (n) balconies. add (n) flat roof at street elevations & replace w / ptd stucco, replace windows with aluminum-clad wood sash. | $100,000 |
| Jun 18, 2014 | Completed final sign-off Sep 2014 | 129 Ellert St | front bldg - repair existing foundation, add new attic storage loft.Details
front bldg - repair existing foundation, add new attic storage loft. | $40,000 | |
| Apr 1, 2014 | Never finaled issued Aug 2015, no final | 739 Congo St | add new roof dormer and a new 2nd floor bathroom and stair (interior stair)Details
add new roof dormer and a new 2nd floor bathroom and stair (interior stair) | $35,000 | |
| Apr 17, 2013 | Completed final sign-off Aug 2013 | 530 Ellsworth St | Xinh Hua Construction | remodel of existing basement for addition of new living space, including new master bedroom, new master bathroom, new powder room, connected to existing 1st floor living space by new visiually open connecting stair. relocate (e) laundry, furnace, and water heater.Details
remodel of existing basement for addition of new living space, including new master bedroom, new master bathroom, new powder room, connected to existing 1st floor living space by new visiually open connecting stair. relocate (e) laundry, furnace, and water heater. | $99,100 |
| Oct 31, 2012 | Completed final sign-off Jan 2013 | 11 Perego Tr | Cronin Construction & Development Inc. | unit #1 - add laundry, door opening in kitchen, new countertops, new hardwood floors, comply with co alarms requirements per cbc 2010 section 420.4.Details
unit #1 - add laundry, door opening in kitchen, new countertops, new hardwood floors, comply with co alarms requirements per cbc 2010 section 420.4. | $35,000 |
| Mar 13, 2012 | Completed final sign-off Jul 2012 | 3912 Folsom St | Pegasus Building/Castle Construction | 1st fl remodel existing kitchen and change existing powder room/laundry room into new powder room/nook area. infill 2 existing rear window, 1 new window, enlarged door to rear deck. no work on deck.Details
1st fl remodel existing kitchen and change existing powder room/laundry room into new powder room/nook area. infill 2 existing rear window, 1 new window, enlarged door to rear deck. no work on deck. | $55,000 |
| Aug 26, 2011 | Completed final sign-off Apr 2013 | 3732 21st St | Cronin Construction & Development Inc. | revision to pa# 2010-0908-0421: revised deck stair configuration, a revised deck configuration, an additional 36 sq ft at (e) breakfast roomDetails
revision to pa# 2010-0908-0421: revised deck stair configuration, a revised deck configuration, an additional 36 sq ft at (e) breakfast room | $10,000 |
| Jun 27, 2011 | Completed final sign-off Apr 2013 | 3732 21st St | Cronin Construction & Development Inc. | new 3rd floor guest bathroom and dressing room at location of extg bedroom.Details
new 3rd floor guest bathroom and dressing room at location of extg bedroom. | $15,000 |
| Mar 18, 2009 | Expired or cancelled expired Jan 2011 | 186 Lippard Av | Modern Insight Design & Build Inc | single story addition @ rear of building to enlarge existing bedroom & add (n) bathroom and closets.Details
single story addition @ rear of building to enlarge existing bedroom & add (n) bathroom and closets. | $50,000 |
| Dec 10, 2008 | Completed final sign-off Jul 2012 | 824 Green St | Harte Building & Design Inc. | new 250 sf roof deck, new exterior spiral stair to 3rd floor deck, new door to new stairDetails
new 250 sf roof deck, new exterior spiral stair to 3rd floor deck, new door to new stair | $50,000 |