John Frando
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Hkit Architects
- Based in
- Oakland
- On San Francisco permits
- Jun 2013 to Oct 2026
122 permits since 2000 (architect on 120 permits, authorized agent-others on 1 permit, engineer on 1 permit): 115 completed, 5 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 122.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1400 Geary Bl | unit 2501 25/f: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room + living room/entry area. (no exterior work).Details
unit 2501 25/f: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room + living room/entry area. (no exterior work). | $94,000 | |
| Aug 31, 2026 | In progress issued Sep 2026 | 1400 Geary Bl | C J Reed Construction Co | unit #809: interior t.i. to replace plumbing fixtures. adding a local smoke alarm. no exterior workDetails
unit #809: interior t.i. to replace plumbing fixtures. adding a local smoke alarm. no exterior work | $98,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 1400 Geary Bl | C J Reed Construction Co | 24th fl, ste 2405 interior replace plumbing fixtures, install grab bar backing; add local smoke alarm @ sleeping room and living room/entry (no exterior work)Details
24th fl, ste 2405 interior replace plumbing fixtures, install grab bar backing; add local smoke alarm @ sleeping room and living room/entry (no exterior work) | $98,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 19th floor (unit 1907) interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room / entry area. there is no exterior work.Details
19th floor (unit 1907) interior remodel, replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room / entry area. there is no exterior work. | $70,000 |
| Jun 26, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | C J Reed Construction Co | 21st fl, 2110 interior work/remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work)Details
21st fl, 2110 interior work/remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work) | $139,000 |
| Jun 26, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 18th fl,unit 1804 interior work/remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work)Details
18th fl,unit 1804 interior work/remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping room and living room/entry area (no exterior work) | $94,000 |
| Jun 23, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | C J Reed Construction Co | unit#1404: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living roomentry area. no exterior work.Details
unit#1404: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living roomentry area. no exterior work. | $98,000 |
| Jun 22, 2026 | Completed final sign-off Aug 2026 | 1400 Geary Bl | C J Reed Construction Co | unit 4l/ 4th fl: interior remodel, replace plumbing fixtures, install shower grab bar backing & local smoke alarm at sleeping room & living room & entry area. no exterior work.Details
unit 4l/ 4th fl: interior remodel, replace plumbing fixtures, install shower grab bar backing & local smoke alarm at sleeping room & living room & entry area. no exterior work. | $98,000 |
| Jun 9, 2026 | Completed final sign-off Sep 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 7th floor unit 709, interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
7th floor unit 709, interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $98,000 |
| Jun 9, 2026 | Completed final sign-off Aug 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 14th flr: 1408, interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
14th flr: 1408, interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $70,000 |
| Jun 8, 2026 | Completed final sign-off Aug 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 10th floor. unit 1003: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleep room and living room/entry area. no exterior work.Details
10th floor. unit 1003: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleep room and living room/entry area. no exterior work. | $80,940 |
| May 19, 2026 | Completed final sign-off Jul 2026 | 1400 Geary Bl | C J Reed Construction Co | 7th floor unit 707; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleep room and living room/entry area. no exterior work.Details
7th floor unit 707; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleep room and living room/entry area. no exterior work. | $112,000 |
| May 7, 2026 | Completed final sign-off Jun 2026 | 1400 Geary Bl | C J Reed Construction Co | 15th floor/unit 1504, interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
15th floor/unit 1504, interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $80,940 |
| Mar 27, 2026 | Completed final sign-off Jun 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 18th fl, unit 1807 interior remodel: replace plumbing smoke alarm at sleeping room and living room/engry area (no exterior work)Details
18th fl, unit 1807 interior remodel: replace plumbing smoke alarm at sleeping room and living room/engry area (no exterior work) | $70,000 |
| Mar 17, 2026 | Completed final sign-off May 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | 24th fl, unit 2402 interior remode: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping and living room/entry area (no exterior work)Details
24th fl, unit 2402 interior remode: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping and living room/entry area (no exterior work) | $90,000 |
| Mar 17, 2026 | Completed final sign-off May 2026 | 1400 Geary Bl | C J Reed Construction Co | 20th fl, unit 2010 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping and living room/entry area (no exterior work)Details
20th fl, unit 2010 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm @ sleeping and living room/entry area (no exterior work) | $139,000 |
| Mar 6, 2026 | Completed final sign-off May 2026 | 1400 Geary Bl | C J Reed Construction Co | 4th fl, unit 404 interior remodel - replace plumbing fixture, install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area (no exterior work)Details
4th fl, unit 404 interior remodel - replace plumbing fixture, install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area (no exterior work) | $94,000 |
| Mar 5, 2026 | Completed final sign-off Jun 2026 | 1400 Geary Bl | C J Reed Construction Co | 13/f - unit 1310: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
13/f - unit 1310: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $139,000 |
| Mar 5, 2026 | Completed final sign-off May 2026 | 1400 Geary Bl | C J Reed Construction Co | 22/f - unit 2202: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
22/f - unit 2202: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $98,000 |
| Dec 19, 2025 | Completed final sign-off Mar 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | unit 402: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work.Details
unit 402: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. | $98,000 |
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 1400 Geary Bl | C J Reed Construction Co | unit 3n: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. no cooktop in kitchenette.Details
unit 3n: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. no cooktop in kitchenette. | $112,000 |
| Dec 19, 2025 | Completed final sign-off Mar 2026 | 1400 Geary Bl | Peninsula Custom Construction Inc | unit 1706: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work.Details
unit 1706: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. | $92,000 |
| Dec 9, 2025 | Completed final sign-off Mar 2026 | 1400 Geary Bl | C J Reed Construction Co | 10th fl unit 1002: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work.Details
10th fl unit 1002: interior remodel - replace plumbing fixture, install shower grab bar backing, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. | $98,000 |
| Dec 4, 2025 | In progress issued Dec 2025 | 1400 Geary Bl | C J Reed Construction Co | 10th fl, unit 1005 interior remodel - replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. no exterior workDetails
10th fl, unit 1005 interior remodel - replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. no exterior work | $92,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 1400 Geary Bl | C J Reed Construction Co | 6th/f unit 604: interior remodel: replace plumbing fixture, install shower grab bar kacking, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work.Details
6th/f unit 604: interior remodel: replace plumbing fixture, install shower grab bar kacking, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work. | $80,940 |
| Nov 10, 2025 | Completed final sign-off Feb 2026 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 4th/fl: units 405(p) & 406(p): two studio unit(s): combine into a one bedroom unit. conversion of bathroom into kichenette. no exterior work.Details
4th/fl: units 405(p) & 406(p): two studio unit(s): combine into a one bedroom unit. conversion of bathroom into kichenette. no exterior work. | $75,000 |
| Nov 6, 2025 | Completed final sign-off Feb 2026 | 1400 Geary Bl | C J Reed Construction Co | 9th floor- unit 907: interior remodel to replace plumbing fixtures, install shower grab bar backing. add local smoke alarm of sleeping room and living room/entry area. no extrerior work.Details
9th floor- unit 907: interior remodel to replace plumbing fixtures, install shower grab bar backing. add local smoke alarm of sleeping room and living room/entry area. no extrerior work. | $81,000 |
| Sep 29, 2025 | Completed final sign-off Jan 2026 | 1400 Geary Bl | 6th/f unit 6n: interior remodel: replace plumbing fixture, install shower grab bar kacking, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work, no cooktop in kitcheetteDetails
6th/f unit 6n: interior remodel: replace plumbing fixture, install shower grab bar kacking, add local smoke alarm at sleeping rm & living rm/entry area. no exterior work, no cooktop in kitcheette | $112,000 | |
| Aug 15, 2025 | Completed final sign-off Apr 2026 | 1400 Geary Bl | C J Reed Construction Co | 25th/fl: (unit#2504) interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarms at sleeping room and living room/ entry area. (no exterior work)Details
25th/fl: (unit#2504) interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarms at sleeping room and living room/ entry area. (no exterior work) | $78,810 |
| Aug 7, 2025 | Completed final sign-off Jan 2026 | 1400 Geary Bl | C J Reed Construction Co | 6th fl, unit 607 interior remodel: replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. there is no exterior workDetails
6th fl, unit 607 interior remodel: replace plumbing fixtures. install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area. there is no exterior work | $80,940 |
| Aug 6, 2025 | Completed final sign-off Dec 2025 | 1400 Geary Bl | C J Reed Construction Co | 8th floor:in unit 807: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (there is no exterior work)Details
8th floor:in unit 807: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (there is no exterior work) | $112,000 |
| Aug 6, 2025 | Completed final sign-off Nov 2025 | 1400 Geary Bl | C J Reed Construction Co | 18th fl. ste 1806. interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work, no cook top in kitchnette.Details
18th fl. ste 1806. interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work, no cook top in kitchnette. | $113,600 |
| Aug 6, 2025 | Completed final sign-off Nov 2025 | 1400 Geary Bl | C J Reed Construction Co | 12fl/unit 1202: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. relocation of kitchenette. (no exterior work).Details
12fl/unit 1202: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. relocation of kitchenette. (no exterior work). | $80,940 |
| Aug 6, 2025 | Completed final sign-off Jan 2026 | 1400 Geary Bl | C J Reed Construction Co | 13th fl/unit 1308: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area . no exterior work.Details
13th fl/unit 1308: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area . no exterior work. | $122,000 |
| Jul 23, 2025 | Completed final sign-off Nov 2025 | 1400 Geary Bl | C J Reed Construction Co | 21th flr/unit 2101; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
21th flr/unit 2101; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $115,000 |
| Jul 23, 2025 | Completed final sign-off Oct 2025 | 1400 Geary Bl | C J Reed Construction Co | 14th flr/unit 1407; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
14th flr/unit 1407; interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $122,000 |
| Jul 14, 2025 | Completed final sign-off Oct 2025 | 1400 Geary Bl | C J Reed Construction Co | 9/f unit 902 - interior remodel. replace (e) shower with new shower. install shower grab bar backing. existing local smoke alarm at sleeping room and living room/ entry area to remain. no exterior work.Details
9/f unit 902 - interior remodel. replace (e) shower with new shower. install shower grab bar backing. existing local smoke alarm at sleeping room and living room/ entry area to remain. no exterior work. | $98,000 |
| Jul 9, 2025 | Completed final sign-off Jan 2026 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 2nd floor:/combine 238 and 240. combining of 2 studio units into a one bedroom unit. work includes casework, finishes, & fixtures. convert one extg bathroom into a kitchenette; remodel extg bathroom including replaceing extg lavatory sink; toilet & shower (combined sqft area of unit doesn't change.Details
2nd floor:/combine 238 and 240. combining of 2 studio units into a one bedroom unit. work includes casework, finishes, & fixtures. convert one extg bathroom into a kitchenette; remodel extg bathroom including replaceing extg lavatory sink; toilet & shower (combined sqft area of unit doesn't change. | $80,000 |
| Jun 24, 2025 | Completed final sign-off Sep 2025 | 1400 Geary Bl | C J Reed Construction Co | 6th/fl/unit 608: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work).Details
6th/fl/unit 608: interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior work). | $112,000 |
| Jun 20, 2025 | Completed final sign-off Sep 2025 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 3rd floor:combine 2 studio units 328 & 329 into two bedroom unit, work includes case work, finishes and fixtures. remove one kitchenette, no working in remaining kitchenette or bathroom. no exterior work.Details
3rd floor:combine 2 studio units 328 & 329 into two bedroom unit, work includes case work, finishes and fixtures. remove one kitchenette, no working in remaining kitchenette or bathroom. no exterior work. | $107,160 |
| Jun 9, 2025 | Completed final sign-off Sep 2025 | 1400 Geary Bl | C J Reed Construction Co | 6th flr/suite 6k - interior remodel replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
6th flr/suite 6k - interior remodel replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $112,000 |
| May 15, 2025 | Completed final sign-off Sep 2025 | 1400 Geary Bl | C J Reed Construction Co | 6th fl, unit 610 interior remodel plumbing fixture replacement; install shower grab bar backup; add local smoke alarm @ sleeping room and living room/entry area. no exterior workDetails
6th fl, unit 610 interior remodel plumbing fixture replacement; install shower grab bar backup; add local smoke alarm @ sleeping room and living room/entry area. no exterior work | $132,000 |
| May 9, 2025 | Completed final sign-off Aug 2025 | 1400 Geary Bl | C J Reed Construction Co | unit 3f/3rd fl interior remodel, replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work.Details
unit 3f/3rd fl interior remodel, replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. | $115,000 |
| Apr 29, 2025 | Completed final sign-off Jul 2025 | 1400 Geary Bl | C J Reed Construction Co | 4th fl, unit 406 - interior remodel: replace plumbing fixtures install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area there is no exterior is no exterior work. there is no cook top in kitchenetteDetails
4th fl, unit 406 - interior remodel: replace plumbing fixtures install shower grab bar backing; add local smoke alarm @ sleeping room and living room/entry area there is no exterior is no exterior work. there is no cook top in kitchenette | $57,246 |
| Apr 17, 2025 | Completed final sign-off Aug 2025 | 1400 Geary Bl | C J Reed Construction Co | 10th fl, 1006 interior remodel replace plumbing fixtures. install shower grab bar backing and local smoke alarm at sleeping rooms living room/entry area. no exterior work. there is no cook top in kitchenetteDetails
10th fl, 1006 interior remodel replace plumbing fixtures. install shower grab bar backing and local smoke alarm at sleeping rooms living room/entry area. no exterior work. there is no cook top in kitchenette | $92,000 |
| Mar 24, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | C J Reed Construction Co | 17th fl/ unit #1707 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (no exterior work)Details
17th fl/ unit #1707 interior remodel: replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. (no exterior work) | $112,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | C J Reed Construction Co | 7th fl unit 7l-m: combining units (2) studio units into 1 bedroom unit with a full bath . replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior workDetails
7th fl unit 7l-m: combining units (2) studio units into 1 bedroom unit with a full bath . replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work | $132,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | C J Reed Construction Co | 6th fl unit 609 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenetteDetails
6th fl unit 609 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette | $132,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1400 Geary Bl | C J Reed Construction Co | 15th fl unit 1505 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette.Details
15th fl unit 1505 interior remodel: replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room and living room/ entry area. no exterior work; no cooktop in kitchenette. | $92,000 |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 1400 Geary Bl | C J Reed Construction Co | 18th floor/unit #1802: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. relocation of kitchenette. no exterior work.Details
18th floor/unit #1802: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room entry area. relocation of kitchenette. no exterior work. | $98,000 |
| Dec 3, 2024 | Completed final sign-off Feb 2025 | 1400 Geary Bl | C J Reed Construction Co | 13th/fl- unit 1307 - interior remodel : replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior workDetails
13th/fl- unit 1307 - interior remodel : replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. there is no exterior work | $112,000 |
| Nov 25, 2024 | Completed final sign-off Feb 2025 | 1400 Geary Bl | C J Reed Construction Co | 16/fl- unit 1601- interior remodel : replace plumbing fixtures, install shower grab bar backing. add smoke alarm at sleeping room and living room/entry area. there is no exterior workDetails
16/fl- unit 1601- interior remodel : replace plumbing fixtures, install shower grab bar backing. add smoke alarm at sleeping room and living room/entry area. there is no exterior work | $98,000 |
| Oct 8, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | C J Reed Construction Co | 7th/f, unit 710: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at 2 sleeping rooms & living rm/ entry area. no exterior work, no cooking top in kitchenetteDetails
7th/f, unit 710: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at 2 sleeping rooms & living rm/ entry area. no exterior work, no cooking top in kitchenette | $132,000 |
| Oct 8, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | C J Reed Construction Co | 8th/f, unit 805: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping atra & living rm/ entry area. no exterior work, no cooking top in kitchenetteDetails
8th/f, unit 805: interior remodel replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping atra & living rm/ entry area. no exterior work, no cooking top in kitchenette | $92,000 |
| Sep 24, 2024 | Completed final sign-off Dec 2024 | 1400 Geary Bl | C J Reed Construction Co | unit 2305/2307 combining as studio and 1 bedroom unit into a larger dwelling unit 2307. replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior, no cook top in kitchenetteDetails
unit 2305/2307 combining as studio and 1 bedroom unit into a larger dwelling unit 2307. replace plumbing fixtures. install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior, no cook top in kitchenette | $178,000 |
| Aug 12, 2024 | Completed final sign-off May 2026 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | revision to pa # 2023-0322-4143 changing the (e) elevator cab & scissor gate doors; tracks, hardware. coordinate extent of demo with new replacement cab. basements, 1st, 2nd & 3rd flDetails
revision to pa # 2023-0322-4143 changing the (e) elevator cab & scissor gate doors; tracks, hardware. coordinate extent of demo with new replacement cab. basements, 1st, 2nd & 3rd fl | $150,000 |
| May 24, 2024 | Completed final sign-off Jan 2025 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 3rd fl, unit 327 remodel & expansion of (e) bath; remodel of (e) closet and cosmetic renotations of living area. work includes new lights, casework, finishes and fixturesDetails
3rd fl, unit 327 remodel & expansion of (e) bath; remodel of (e) closet and cosmetic renotations of living area. work includes new lights, casework, finishes and fixtures | $62,500 |
| May 23, 2024 | Completed final sign-off Jan 2025 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 213: remodel & expansion of e) bath. remodel of e) closet & cosmetic renovation of living area including new lighting, casework, finishes & fixturesDetails
unit 213: remodel & expansion of e) bath. remodel of e) closet & cosmetic renovation of living area including new lighting, casework, finishes & fixtures | $64,500 |
| May 7, 2024 | Completed final sign-off Aug 2024 | 3400 Laguna St | Peninsula Custom Construction Inc | 4th/fl- units 419 and 420 to combine two studios units into a 1 bedroom unit. converson of bathroom into a kitchenette. remodel of (e) bathroom inlcuding replacing (e) lavatory cabinet and sink, mirror and shower toilet to remainDetails
4th/fl- units 419 and 420 to combine two studios units into a 1 bedroom unit. converson of bathroom into a kitchenette. remodel of (e) bathroom inlcuding replacing (e) lavatory cabinet and sink, mirror and shower toilet to remain | $140,000 |
| May 3, 2024 | Completed final sign-off Aug 2024 | 3400 Laguna St | Peninsula Custom Construction Inc | 3rd floor: unit 305: remodel and expansion of extg batah, cosmetic renovations of living area work includes, new lighting, casework, finishes and fixtures. no exterior work. no combining unitsDetails
3rd floor: unit 305: remodel and expansion of extg batah, cosmetic renovations of living area work includes, new lighting, casework, finishes and fixtures. no exterior work. no combining units | $140,000 |
| Apr 4, 2024 | Completed final sign-off Jun 2024 | 1400 Geary Bl | C J Reed Construction Co | 18th fl, unit 1804 - interior remodel, replace tub with shower. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior)Details
18th fl, unit 1804 - interior remodel, replace tub with shower. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area (no exterior) | $17,000 |
| Jan 30, 2024 | Completed final sign-off Mar 2024 | 1400 Geary Bl | C J Reed Construction Co | 5th floor unit 504 - bathroom remodel to include replace tub with shower, shower grab bar backing, and local smoke alarm @ sleeping room and living room/entry area. no exterior workDetails
5th floor unit 504 - bathroom remodel to include replace tub with shower, shower grab bar backing, and local smoke alarm @ sleeping room and living room/entry area. no exterior work | $62,000 |
| Oct 17, 2023 | Completed final sign-off Jan 2024 | 1400 Geary Bl | C J Reed Construction Co | 15th fl (units 1503): replace plumbing fixtures. install grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work.Details
15th fl (units 1503): replace plumbing fixtures. install grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work. | $68,000 |
| Oct 17, 2023 | Completed final sign-off Dec 2023 | 1400 Geary Bl | C J Reed Construction Co | 3rd fl (units 3a/3b): combining units. replace plumbing fixtures in (3a) install grab bar backing and local smoke alarm at sleeping room and living room/ entry area. no exterior work. new door between unit 3a + 3b.Details
3rd fl (units 3a/3b): combining units. replace plumbing fixtures in (3a) install grab bar backing and local smoke alarm at sleeping room and living room/ entry area. no exterior work. new door between unit 3a + 3b. | $62,000 |
| Oct 17, 2023 | Completed final sign-off Jan 2024 | 1400 Geary Bl | C J Reed Construction Co | 6th fl (unit 6k): replace plumbing fixtures. install shower grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work. no cooktop in kitchenette.Details
6th fl (unit 6k): replace plumbing fixtures. install shower grab bar backing add local smoke alarm at sleeping room and living room/ entry area. no exterior work. no cooktop in kitchenette. | $56,000 |
| Sep 12, 2023 | Completed final sign-off Nov 2023 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 3/f unit# 303: remodel and expansion of existing bathroom, cosmetic renovation of living area kitchenette and bedroom. work will include new lights, casework, finishes and fixtures.Details
3/f unit# 303: remodel and expansion of existing bathroom, cosmetic renovation of living area kitchenette and bedroom. work will include new lights, casework, finishes and fixtures. | $78,000 |
| Aug 24, 2023 | Completed final sign-off Dec 2023 | 1400 Geary Bl | C J Reed Construction Co | 16th fl: combining units 1608 & 1610. interior remodel. replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room & living room/ entry area. no exterior work. (no cook top in kitchenette).Details
16th fl: combining units 1608 & 1610. interior remodel. replace plumbing fixtures install shower grab bar backing. add local smoke alarm at sleeping room & living room/ entry area. no exterior work. (no cook top in kitchenette). | $105,000 |
| Jul 3, 2023 | Completed final sign-off Nov 2023 | 1400 Geary Bl | C J Reed Construction Co | 21/f-unit# 2110: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. there is no cooktop in kitchenette.Details
21/f-unit# 2110: replace plumbing fixtures, install shower grab bar backing, add local smoke alarm at sleeping room and living room/entry area. no exterior work. there is no cooktop in kitchenette. | $48,000 |
| Jun 20, 2023 | Completed final sign-off Aug 2023 | 1400 Geary Bl | C J Reed Construction Co | 7th fl, unit 705 interior remodel - replace plumbing fixtures. install shower grab bar backing and local smoke alarms @ sleeping room and living room entry area. no exterior work.Details
7th fl, unit 705 interior remodel - replace plumbing fixtures. install shower grab bar backing and local smoke alarms @ sleeping room and living room entry area. no exterior work. | $55,000 |
| Mar 22, 2023 | Expired or cancelled expired May 2026 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | replace existing passenger elevator manual cab and hoistway doors with auto sliding doors.Details
replace existing passenger elevator manual cab and hoistway doors with auto sliding doors. | $250,000 |
| Mar 10, 2023 | Completed final sign-off May 2023 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 1/f unit# 113: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area).Details
1/f unit# 113: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area). | $76,000 |
| Mar 10, 2023 | Completed final sign-off May 2023 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 1/f unit# 103: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area).Details
1/f unit# 103: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area). | $82,000 |
| Feb 16, 2023 | Completed final sign-off Apr 2023 | 1400 Geary Bl | C J Reed Construction Co | 4th fl, unit 404 internal remodel - replace tub with shower. install shower grab bar backing, add local smoke detector at sleeping room & living room/entry area. there is no exteior workDetails
4th fl, unit 404 internal remodel - replace tub with shower. install shower grab bar backing, add local smoke detector at sleeping room & living room/entry area. there is no exteior work | $32,000 |
| Dec 1, 2022 | Completed final sign-off Mar 2023 | 1400 Geary Bl | C J Reed Construction Co | 10th fl/unit 1001 interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior workDetails
10th fl/unit 1001 interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work | $55,000 |
| Dec 1, 2022 | Completed final sign-off Jan 2023 | 1400 Geary Bl | C J Reed Construction Co | 21st fl/unit 2103: interior remoel, replace plumbing fixtures. install grab bar backing, add local smoke alarm at sleeping room and living room, entry area. no exterior workDetails
21st fl/unit 2103: interior remoel, replace plumbing fixtures. install grab bar backing, add local smoke alarm at sleeping room and living room, entry area. no exterior work | $32,000 |
| Nov 15, 2022 | Completed final sign-off Jan 2023 | 1400 Geary Bl | C J Reed Construction Co | 5th floor: unit #5k, interior remodel. replace plmg fixture, install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. no cooktop in kitchenette.Details
5th floor: unit #5k, interior remodel. replace plmg fixture, install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. no cooktop in kitchenette. | $56,000 |
| Oct 25, 2022 | Completed final sign-off May 2023 | 1400 Geary Bl | C J Reed Construction Co | unit 801 on 8/f: interior remodel - replace plumbing fixutres, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work.Details
unit 801 on 8/f: interior remodel - replace plumbing fixutres, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. | $65,000 |
| Sep 23, 2022 | Completed final sign-off Jun 2023 | 1400 Geary Bl | C J Reed Construction Co | 16/f: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) relocation of kitchenette there is no exterior workDetails
16/f: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) relocation of kitchenette there is no exterior work | $65,000 |
| Sep 23, 2022 | Completed final sign-off Dec 2022 | 1400 Geary Bl | C J Reed Construction Co | 11/f units 1108/1110: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) there is no cooktop in kitchenette combining units 1108 + 1110 together for one unit.Details
11/f units 1108/1110: interior remodel: replace plumbing fixtures, install shower grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) there is no cooktop in kitchenette combining units 1108 + 1110 together for one unit. | $127,000 |
| Sep 23, 2022 | Completed final sign-off Dec 2022 | 1400 Geary Bl | C J Reed Construction Co | 13/f: interior remodel: replace plumbing fixtures, install grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work)Details
13/f: interior remodel: replace plumbing fixtures, install grab bar backing and local smoke detector at sleeping room and living room/entry area (no exterior work) | $65,000 |
| Aug 16, 2022 | Completed final sign-off Nov 2022 | 1400 Geary Bl | C J Reed Construction Co | 1/f. ste 1306 & 1308. interior remodel: combine studio and one bedroom unit into a 2 bedroom unit. remove 1 kitchenette existing plumbing fixtures to remain. add local smoke detector at sleeping room. and living room/entry area: (no exterior work, no cook top in kitchenette. unit #will be 1306.Details
1/f. ste 1306 & 1308. interior remodel: combine studio and one bedroom unit into a 2 bedroom unit. remove 1 kitchenette existing plumbing fixtures to remain. add local smoke detector at sleeping room. and living room/entry area: (no exterior work, no cook top in kitchenette. unit #will be 1306. | $87,000 |
| Jul 6, 2022 | Completed final sign-off Nov 2022 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 2/fl unit 246m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area.Details
2/fl unit 246m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area. | $80,100 |
| Jul 6, 2022 | Completed final sign-off Nov 2022 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 3/fl unit 329m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area.Details
3/fl unit 329m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area. | $79,400 |
| Jun 14, 2022 | Completed final sign-off Aug 2022 | 1400 Geary Bl | C J Reed Construction Co | unit 2109 21st flr: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. no cook top in kitchenette.Details
unit 2109 21st flr: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no exterior work. no cook top in kitchenette. | $48,000 |
| Mar 1, 2022 | Completed final sign-off May 2022 | 1400 Geary Bl | C J Reed Construction Co | unit 2001: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living room entry area. no exterior work.Details
unit 2001: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room and living room entry area. no exterior work. | |
| Jan 28, 2022 | Completed final sign-off Mar 2022 | 1400 Geary Bl | C J Reed Construction Co | 5th floor/unit 5g-h: interior remodel: replace tub w/ shower grab bar backing, add local smoke detector @ sleeping room & living room/entry area. no exterior work. combine units 5g & 5h.Details
5th floor/unit 5g-h: interior remodel: replace tub w/ shower grab bar backing, add local smoke detector @ sleeping room & living room/entry area. no exterior work. combine units 5g & 5h. | $47,000 |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 1400 Geary Bl | C J Reed Construction Co | unit 5j interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work.Details
unit 5j interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work. | $41,000 |
| Jan 27, 2022 | Completed final sign-off Mar 2022 | 1400 Geary Bl | C J Reed Construction Co | unit 7a interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work.Details
unit 7a interior remodel: replace tub with shower, grab bar backing, add local smoke detector @ sleeping room and living room/entry area. no exterior work. | $18,000 |
| Nov 4, 2021 | Completed final sign-off Dec 2021 | 1400 Geary Bl | C J Reed Construction Co | apt 2108: insterior remodel: replace tub with shower, grab bar backing. add local smoke detector at slieepign room and living room/entry area. no exterior work.Details
apt 2108: insterior remodel: replace tub with shower, grab bar backing. add local smoke detector at slieepign room and living room/entry area. no exterior work. | $34,760 |
| Sep 16, 2021 | Completed final sign-off Nov 2021 | 1400 Geary Bl | C J Reed Construction Co | unit# 6l: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work.Details
unit# 6l: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work. | $29,704 |
| Sep 16, 2021 | Completed final sign-off Nov 2021 | 1400 Geary Bl | C J Reed Construction Co | unit# 1808: replacing tub with shower. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work.Details
unit# 1808: replacing tub with shower. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work. | $34,760 |
| Sep 16, 2021 | Completed final sign-off Dec 2021 | 1400 Geary Bl | C J Reed Construction Co | unit# 2107: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work.Details
unit# 2107: replacing plumbing fixtures. install shower grab bar backing. add local smoke detector at sleep room & living room/entry area. no exterior work. | $34,760 |
| Sep 1, 2021 | Completed final sign-off Sep 2021 | 1400 Geary Bl | C J Reed Construction Co | 23rd fl unit 2303 int remodel. replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior workDetails
23rd fl unit 2303 int remodel. replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work | $38,750 |
| Jun 8, 2021 | Completed final sign-off Jul 2021 | 1400 Geary Bl | C J Reed Construction Co | units 4l & 4m on 4th fl: combine 2 units (4l & 4m) into a one bedroom unit with a full bath and powder room. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no ecterior work.Details
units 4l & 4m on 4th fl: combine 2 units (4l & 4m) into a one bedroom unit with a full bath and powder room. replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living room/entry area. no ecterior work. | $75,000 |
| Mar 19, 2021 | Completed final sign-off Jul 2021 | 1400 Geary Bl | C J Reed Construction Co | unit #1410: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work.Details
unit #1410: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. | $32,500 |
| Mar 19, 2021 | Completed final sign-off May 2021 | 1400 Geary Bl | C J Reed Construction Co | unit #7p: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work.Details
unit #7p: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. | $32,500 |
| Mar 19, 2021 | Completed final sign-off May 2021 | 1400 Geary Bl | C J Reed Construction Co | unit #1905: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work.Details
unit #1905: interior remodel. replace plumbing fixtures. install shower grab bar backing. add local smoke detector at sleeping room & living room/entry area. no exterior work. | $32,500 |
| Dec 28, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit #412: cosmetic renovation of (e) living room, bedroom, & bath. addition of new kitchenette to living room (same sq ft). interior only. (n) lighting, casework, finishes & fixtures.Details
unit #412: cosmetic renovation of (e) living room, bedroom, & bath. addition of new kitchenette to living room (same sq ft). interior only. (n) lighting, casework, finishes & fixtures. | $38,000 |
| Dec 21, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 2nd fl, unit 224 assisted living unit - remodel and expansion of existing bath. remodel of existing closet & cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. no exterior workDetails
2nd fl, unit 224 assisted living unit - remodel and expansion of existing bath. remodel of existing closet & cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. no exterior work | $98,000 |
| Dec 21, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | (unit #311, 3rd fl): cosmetic renovation. existing bath & kitchenette. remodel of existing bedroom remodel & expand closet. work includes new lighting, casework, finishes & fixtures. no exterior work.Details
(unit #311, 3rd fl): cosmetic renovation. existing bath & kitchenette. remodel of existing bedroom remodel & expand closet. work includes new lighting, casework, finishes & fixtures. no exterior work. | $60,000 |