Kelly Bogenschutz
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Gensler
- Based in
- Sf
- On San Francisco permits
- Mar 2002 to Sep 2019
6 permits since 2000 (architect on 4 permits, authorized agent-others on 1 permit, engineer on 1 permit): 6 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2019 | Completed final sign-off Oct 2020 | 1 Market St | Bcci Construction Company | 21st floor: new non-structural partitions, ceilings, light fixtures, millwork and finishes.Details
21st floor: new non-structural partitions, ceilings, light fixtures, millwork and finishes. | $1,000,000 |
| Dec 14, 2011 | Completed final sign-off Jun 2014 | 888 Brannan St | Richlen Construction | const of a new lobby and entrance on the 1st fl. new basement lobby, new exits, new fire rated roll down door at existing ramp. 2nd fl reconfiguration of the exit stair to the 1st fl. new elevator , mep. fire/life safety under separate permit.Details
const of a new lobby and entrance on the 1st fl. new basement lobby, new exits, new fire rated roll down door at existing ramp. 2nd fl reconfiguration of the exit stair to the 1st fl. new elevator , mep. fire/life safety under separate permit. | $1,300,000 |
| Jun 13, 2011 | Completed final sign-off May 2012 | 4 Embarcadero Center | provide new canopy over entryDetails
provide new canopy over entry | $300,000 | |
| Jun 6, 2011 | Completed final sign-off May 2012 | 4 Embarcadero Center | Peacock Construction Inc | renovate (e) lobby with new finishes, provide new storefront to replace (e) within same opening, new entry door in same locationDetails
renovate (e) lobby with new finishes, provide new storefront to replace (e) within same opening, new entry door in same location | $600,000 |
| Jan 18, 2005 | Completed final sign-off Nov 2005 | 425 Market St | Novo Construction Inc | oti-2 5th/fl-el,me.Details
oti-2 5th/fl-el,me. | $200,000 |
| Mar 29, 2002 | Completed final sign-off Sep 2003 | 230 Post St | renovation of extg stor retail/dim non bearing partition/install new h.c. bthrm/install new prt walDetails
renovation of extg stor retail/dim non bearing partition/install new h.c. bthrm/install new prt wal | $700,300 |