Sean P Quigley
- Listed as
- authorized agent-others, contractor, designer
- Firm
- One Inch To The Left, Inc. Dba Rarefield
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Mar 2026
80 permits since 2000 (contractor on 80 permits, authorized agent-others on 6 permits, designer on 1 permit): 72 completed, 1 in progress, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 23, 2026 | In progress issued Sep 2026 | 424 Pacheco St | One Inch To The Left, Inc. Dba Rarefield | rebulid side deck. side deck will be clad in stucco to match (e). (n) railing will be metal with vertical picket. demolish lower solid sections only of (e) arched entryway. remain (e) arches. replace rear deck with spiral spiral stairs and smaller deck.Details
rebulid side deck. side deck will be clad in stucco to match (e). (n) railing will be metal with vertical picket. demolish lower solid sections only of (e) arched entryway. remain (e) arches. replace rear deck with spiral spiral stairs and smaller deck. | $32,000 |
| Oct 29, 2025 | Completed final sign-off Nov 2025 | 324 Pacheco St | One Inch To The Left, Inc. Dba Rarefield | to obtain final inspection for work approved under pa # 2024-0612-4328. all work is complete.Details
to obtain final inspection for work approved under pa # 2024-0612-4328. all work is complete. | |
| Sep 22, 2025 | Completed final sign-off Nov 2025 | 238 Arlington St | One Inch To The Left, Inc. Dba Rarefield | north east facing 1st floor rear window to be replaced with french door with landing, stairs, gaurdrail/handrail down to gardenDetails
north east facing 1st floor rear window to be replaced with french door with landing, stairs, gaurdrail/handrail down to garden | $10,000 |
| Feb 20, 2025 | Completed final sign-off Aug 2025 | 324 Pacheco St | One Inch To The Left, Inc. Dba Rarefield | rev to pa#2024-1202-5945; changing brick to stone surface at entry stair. less than 50%-no change to structuralDetails
rev to pa#2024-1202-5945; changing brick to stone surface at entry stair. less than 50%-no change to structural | |
| Dec 2, 2024 | Completed final sign-off Aug 2025 | 324 Pacheco St | One Inch To The Left, Inc. Dba Rarefield | in kind front stair work on existing stairs with brick treads and risers, non-structural, less than 50% repair.Details
in kind front stair work on existing stairs with brick treads and risers, non-structural, less than 50% repair. | $18,000 |
| Jun 12, 2024 | Expired or cancelled expired Nov 2025 | 324 Pacheco St | One Inch To The Left, Inc. Dba Rarefield | rev 202212128107- adjustment to stair, landing, and engineeringDetails
rev 202212128107- adjustment to stair, landing, and engineering | |
| May 7, 2024 | Completed final sign-off May 2025 | 324 Pacheco St | One Inch To The Left, Inc. Dba Rarefield | in-kind window replacement in bedroom, media room, bathroom & hallway at side & rear of bldg, not visible from st. same size, same locations, max u-factor 0.30; 4 total windows.Details
in-kind window replacement in bedroom, media room, bathroom & hallway at side & rear of bldg, not visible from st. same size, same locations, max u-factor 0.30; 4 total windows. | $20,000 |
| Oct 17, 2023 | Completed final sign-off Feb 2024 | 2620 20th St | One Inch To The Left, Inc. Dba Rarefield | relevel house on west side. remove & replace interior sheathing, raise west side of house approx 2", replace or "sistr" 2x6 framing as needed, revise ex sill plate, bolting as exsiting.Details
relevel house on west side. remove & replace interior sheathing, raise west side of house approx 2", replace or "sistr" 2x6 framing as needed, revise ex sill plate, bolting as exsiting. | $4,000 |
| Sep 20, 2023 | Completed final sign-off Feb 2024 | 4107 21st St | One Inch To The Left, Inc. Dba Rarefield | upstairs bathroom remodel replace in kindDetails
upstairs bathroom remodel replace in kind | $65,000 |
| Dec 12, 2022 | Completed final sign-off Nov 2025 | 324 Pacheco St | One Inch To The Left, Inc. Dba Rarefield | swap window for door , new landing and staircase above 10 feet water feature, fencing.Details
swap window for door , new landing and staircase above 10 feet water feature, fencing. | $350,000 |
| Aug 26, 2022 | Completed final sign-off Feb 2023 | 324 Pacheco St | One Inch To The Left, Inc. Dba Rarefield | garage door replacementDetails
garage door replacement | $10,000 |
| Aug 23, 2022 | Completed final sign-off Jul 2023 | 119 Maddux Av | One Inch To The Left, Inc. Dba Rarefield | bathroom remodel on second floor: partition wall to be removed and setback 1', bathroom fixtures to be updated. finishes to be updated.Details
bathroom remodel on second floor: partition wall to be removed and setback 1', bathroom fixtures to be updated. finishes to be updated. | $45,000 |
| Aug 23, 2022 | Completed final sign-off Apr 2023 | 2663 24th Av | One Inch To The Left, Inc. Dba Rarefield | replace west facing ground level rear window with sliding door. 3 box step to be constructed and placed under glass sliding doorDetails
replace west facing ground level rear window with sliding door. 3 box step to be constructed and placed under glass sliding door | $13,779 |
| Aug 23, 2022 | Completed final sign-off Jul 2023 | 119 Maddux Av | One Inch To The Left, Inc. Dba Rarefield | downstairs bathroom fixtures to be replaced. vanity, flooring tiles, shower, and toilet.Details
downstairs bathroom fixtures to be replaced. vanity, flooring tiles, shower, and toilet. | $30,000 |
| Oct 16, 2020 | Never finaled issued Feb 2022, no final | 1926 22nd Av | One Inch To The Left, Inc. Dba Rarefield | new wood deck at 2nd story (1st fl of occupancy) with wood staircase to lower deck. new wood lower deck with hot tube and wood staircase to finish grade.Details
new wood deck at 2nd story (1st fl of occupancy) with wood staircase to lower deck. new wood lower deck with hot tube and wood staircase to finish grade. | $45,000 |
| Sep 23, 2020 | Completed final sign-off Jun 2022 | 805 York St | One Inch To The Left, Inc. Dba Rarefield | remove existing landing and stairs. build new deck & stairs as per plan. replace existing, modern bay window w/ casement window or similar.Details
remove existing landing and stairs. build new deck & stairs as per plan. replace existing, modern bay window w/ casement window or similar. | $22,250 |
| Aug 24, 2020 | Completed final sign-off Sep 2021 | 766 Valencia St | One Inch To The Left, Inc. Dba Rarefield | fire fire damage, upgrade restroomsDetails
fire fire damage, upgrade restrooms | $289,400 |
| Jul 17, 2020 | Completed final sign-off Jun 2021 | 1234 05th Av | One Inch To The Left, Inc. Dba Rarefield | replace stairs in kind down to deck 15" above grade. replacing fence. replace fence max. 6'-0" height.Details
replace stairs in kind down to deck 15" above grade. replacing fence. replace fence max. 6'-0" height. | $42,500 |
| Mar 16, 2020 | Completed final sign-off Feb 2021 | 2655 Alemany Bl | One Inch To The Left, Inc. Dba Rarefield | rear backyard: install new susnshe, new wood steps and landing (less than 30in above grade).Details
rear backyard: install new susnshe, new wood steps and landing (less than 30in above grade). | $19,750 |
| Mar 2, 2020 | Completed final sign-off Feb 2022 | 920 Baker St | One Inch To The Left, Inc. Dba Rarefield | all work on (e) roof level: install roof deck on risers. install plant containers w/ plants. new guard rail. new firewall.Details
all work on (e) roof level: install roof deck on risers. install plant containers w/ plants. new guard rail. new firewall. | $82,500 |
| Feb 25, 2020 | Completed final sign-off Mar 2020 | 784 Potrero Av | One Inch To The Left, Inc. Dba Rarefield | to comply with nov #202012481. document extg conc. install drainage system with sump pump at rear yard.Details
to comply with nov #202012481. document extg conc. install drainage system with sump pump at rear yard. | $6,000 |
| Oct 30, 2019 | Completed final sign-off Dec 2022 | 162 Farnum St | One Inch To The Left, Inc. Dba Rarefield | new lower deck, wood retaining wall and fire wall. new garden walk, patio and fence. garden planting, lighting and irrigation. new upper deck and door + window.Details
new lower deck, wood retaining wall and fire wall. new garden walk, patio and fence. garden planting, lighting and irrigation. new upper deck and door + window. | $92,500 |
| Aug 6, 2019 | Completed final sign-off Sep 2019 | 737 Joost Av | One Inch To The Left, Inc. Dba Rarefield | rev to pa#201906062701. field changes to rise and run.Details
rev to pa#201906062701. field changes to rise and run. | |
| Jun 6, 2019 | Completed final sign-off Sep 2019 | 737 Joost Av | One Inch To The Left, Inc. Dba Rarefield | remove and repair front steps in kindDetails
remove and repair front steps in kind | $12,800 |
| May 8, 2019 | Completed final sign-off Aug 2019 | 2620 20th St | One Inch To The Left, Inc. Dba Rarefield | remove and replace extg foundation. no plmg or electrical required. all work to take place at west foundation only.Details
remove and replace extg foundation. no plmg or electrical required. all work to take place at west foundation only. | $5,000 |
| May 8, 2019 | Expired or cancelled cancelled Sep 2019 | 2637 24th St | One Inch To The Left, Inc. Dba Rarefield | relocate extg metal railing. new wood stem walls.Details
relocate extg metal railing. new wood stem walls. | $11,800 |
| Aug 22, 2018 | Completed final sign-off Nov 2018 | 781 Joost Av | One Inch To The Left, Inc. Dba Rarefield | replacemeent of current sink, shower over tub, toilet. there will be no structural work or exterior work. new light fixture and new outlets. pumbing as needed to hook up new fixtures.Details
replacemeent of current sink, shower over tub, toilet. there will be no structural work or exterior work. new light fixture and new outlets. pumbing as needed to hook up new fixtures. | $48,000 |
| Apr 16, 2018 | Completed final sign-off Apr 2019 | 425 14th St | One Inch To The Left, Inc. Dba Rarefield | all work on (e) roof level. new deck install on risers. plant containers, planting, kitchen & bar installation. fence in storage.Details
all work on (e) roof level. new deck install on risers. plant containers, planting, kitchen & bar installation. fence in storage. | $60,000 |
| Dec 29, 2017 | Completed final sign-off Oct 2018 | 75 Hartford St | One Inch To The Left, Inc. Dba Rarefield | (n) 10ft wood gate w/door at side corridorDetails
(n) 10ft wood gate w/door at side corridor | $8,500 |
| Jul 19, 2017 | Completed final sign-off Aug 2018 | 3970 19th St | One Inch To The Left, Inc. Dba Rarefield | rebuild 1 story front steps in kind with new structural walls below.Details
rebuild 1 story front steps in kind with new structural walls below. | $12,000 |
| Jan 5, 2017 | Completed final sign-off Apr 2017 | 5325 California St | One Inch To The Left, Inc. Dba Rarefield | replace all fixts. & finishes in-kind for (2) bathrooms located on 2nd fl. replace outlet in (e) locations. reconnect plumbing to fixts in (e) locations.Details
replace all fixts. & finishes in-kind for (2) bathrooms located on 2nd fl. replace outlet in (e) locations. reconnect plumbing to fixts in (e) locations. | $25,000 |
| Dec 6, 2016 | Never finaled issued Dec 2016, no final | 621 Stockton St | One Inch To The Left, Inc. Dba Rarefield | reconfigure existing walls/stucco over non-historical stone face, demo (e)no-historical balusters & railing,add railing, new site features to include trellis,arbor & seating ara,new planting,irrigation & lighting; maher n/aDetails
reconfigure existing walls/stucco over non-historical stone face, demo (e)no-historical balusters & railing,add railing, new site features to include trellis,arbor & seating ara,new planting,irrigation & lighting; maher n/a | $50,000 |
| Nov 29, 2016 | Completed final sign-off Jun 2017 | 314 Rutledge St | One Inch To The Left, Inc. Dba Rarefield | extend (e) deck. replace failing concrete wall. install bin and provacy screen. new fencingDetails
extend (e) deck. replace failing concrete wall. install bin and provacy screen. new fencing | $50,000 |
| Sep 28, 2016 | Completed final sign-off Mar 2017 | 2620 20th St | One Inch To The Left, Inc. Dba Rarefield | revision to application 201609026699; remove & replace stairs in kind, due to dry rot & crumbling concrete support, reframe adjacent walls as needed.Details
revision to application 201609026699; remove & replace stairs in kind, due to dry rot & crumbling concrete support, reframe adjacent walls as needed. | $500 |
| Sep 2, 2016 | Completed final sign-off Apr 2017 | 2620 20th St | One Inch To The Left, Inc. Dba Rarefield | replace in kind windows and siding of front frame.repair dry rot at stairsDetails
replace in kind windows and siding of front frame.repair dry rot at stairs | $8,000 |
| Jul 12, 2016 | Expired or cancelled cancelled Feb 2020 | 512 Oak St | One Inch To The Left, Inc. Dba Rarefield | remove existing non-compliant wood winder stair at back of building, construct new two story wood frame deck at rear of building w/ new code compliant 6' diameter spiral stair.Details
remove existing non-compliant wood winder stair at back of building, construct new two story wood frame deck at rear of building w/ new code compliant 6' diameter spiral stair. | $15,000 |
| Feb 9, 2016 | Completed final sign-off Mar 2016 | 1269 Lombard St | One Inch To The Left, Inc. Dba Rarefield | addition of concrete pavers to existing wood roof tile deck. extension of existing gas line to new fire pitDetails
addition of concrete pavers to existing wood roof tile deck. extension of existing gas line to new fire pit | $3,000 |
| Dec 14, 2015 | Completed final sign-off Apr 2016 | 323 21st Av | One Inch To The Left, Inc. Dba Rarefield | remove (e) stairs & deck. rebuild new deck & reconfigure stairsDetails
remove (e) stairs & deck. rebuild new deck & reconfigure stairs | $25,000 |
| Aug 18, 2015 | Completed final sign-off Apr 2016 | 1050 Castro St | One Inch To The Left, Inc. Dba Rarefield | remove/replace concrete, rebuild w/raised concrete planters.Details
remove/replace concrete, rebuild w/raised concrete planters. | $29,000 |
| Jan 27, 2015 | Completed final sign-off Apr 2015 | 3 Peralta Av | One Inch To The Left, Inc. Dba Rarefield | remove non-compliant existing deck, replace with new, compliant deck & stairs. extend existing retaining wall.Details
remove non-compliant existing deck, replace with new, compliant deck & stairs. extend existing retaining wall. | $25,000 |
| Jan 21, 2015 | Completed final sign-off Jul 2015 | 766 Valencia St | One Inch To The Left, Inc. Dba Rarefield | abatement of violation # 201411675. remove railing/guard rail and door. replace door with window. revert area back to original condition. u - factor shall be 0.32 or lessDetails
abatement of violation # 201411675. remove railing/guard rail and door. replace door with window. revert area back to original condition. u - factor shall be 0.32 or less | $400 |
| Oct 8, 2014 | Completed final sign-off Feb 2015 | 79 Scott St | One Inch To The Left, Inc. Dba Rarefield | remove and replace retaining wall. construct at grade deck.Details
remove and replace retaining wall. construct at grade deck. | $50,000 |
| Jul 30, 2014 | Completed final sign-off Nov 2014 | 49 Everson St | One Inch To The Left, Inc. Dba Rarefield | deck repair. less than 50%Details
deck repair. less than 50% | $25,000 |
| Jun 27, 2014 | Completed final sign-off Feb 2015 | 356 Lexington St | One Inch To The Left, Inc. Dba Rarefield | alteration/addition of doors and windows, per plans.Details
alteration/addition of doors and windows, per plans. | $10,000 |
| Jun 24, 2014 | Completed final sign-off Aug 2014 | 715 Amazon Av | One Inch To The Left, Inc. Dba Rarefield | construct 1st floor wood deck in backyard, deck height 8' 2" from grade.Details
construct 1st floor wood deck in backyard, deck height 8' 2" from grade. | $18,000 |
| Apr 4, 2014 | Completed final sign-off Oct 2019 | 331 19th Av | One Inch To The Left, Inc. Dba Rarefield | (n) rear addition including the creation of a new master suite, family room & powder room.Details
(n) rear addition including the creation of a new master suite, family room & powder room. | $190,000 |
| Feb 26, 2014 | Completed final sign-off Apr 2014 | 375 San Benito Wy | One Inch To The Left, Inc. Dba Rarefield | build backyard deck with stairs.Details
build backyard deck with stairs. | $8,000 |
| Aug 8, 2013 | Completed final sign-off Nov 2013 | 628 20th St | One Inch To The Left, Inc. Dba Rarefield | remodel interior, new retail counter, new equipment, new ada bathroom and new lighting. ground floor only.Details
remodel interior, new retail counter, new equipment, new ada bathroom and new lighting. ground floor only. | $50,000 |
| Feb 25, 2013 | Completed final sign-off Jun 2013 | 2066 Chestnut St | One Inch To The Left, Inc. Dba Rarefield | to erect non electrical face mounter signDetails
to erect non electrical face mounter sign | $30,000 |
| Feb 25, 2013 | Completed final sign-off Jun 2013 | 2066 Chestnut St | One Inch To The Left, Inc. Dba Rarefield | remove steel framed operable windows and reinstall. if windows are not reuseable, replace with wood or steel framed sliding windows. intall new redwood bench. not to project past property line. revision to app#201211274903Details
remove steel framed operable windows and reinstall. if windows are not reuseable, replace with wood or steel framed sliding windows. intall new redwood bench. not to project past property line. revision to app#201211274903 | $12,000 |
| Feb 25, 2013 | Completed final sign-off Jun 2013 | 2066 Chestnut St | One Inch To The Left, Inc. Dba Rarefield | to erect non electrical perpendicular signDetails
to erect non electrical perpendicular sign | $2,000 |
| Nov 27, 2012 | Completed final sign-off Jun 2013 | 2066 Chestnut St | One Inch To The Left, Inc. Dba Rarefield | interior t.i. - (e) ice cream store to retail bakery - remodel of (e) approx 1025 sf ground flr work to include new retail counter, new equipment including hvac, new elec/lighting. plbg & elec permit will be applied separately.Details
interior t.i. - (e) ice cream store to retail bakery - remodel of (e) approx 1025 sf ground flr work to include new retail counter, new equipment including hvac, new elec/lighting. plbg & elec permit will be applied separately. | $120,000 |
| Aug 9, 2012 | Completed final sign-off Mar 2013 | 2066 Chestnut St | One Inch To The Left, Inc. Dba Rarefield | non-structural (soft) demolition of existing retail space to include partition walls, dropped ceiling & previous tenant finishes (per ab-017). space is currently unoccupied & will remain unoccupied - all ada accessibility will be completed under tenant improvement permit.Details
non-structural (soft) demolition of existing retail space to include partition walls, dropped ceiling & previous tenant finishes (per ab-017). space is currently unoccupied & will remain unoccupied - all ada accessibility will be completed under tenant improvement permit. | $2,000 |
| Jul 25, 2011 | Completed final sign-off May 2012 | 885 Kansas St | One Inch To The Left, Inc. Dba Rarefield | remove and replace existing deck steps with new deck. add at grade timber steps to access lower level of house. remove and replace ex exterior door and windowDetails
remove and replace existing deck steps with new deck. add at grade timber steps to access lower level of house. remove and replace ex exterior door and window | $10,000 |
| Feb 14, 2011 | Completed final sign-off May 2011 | 963 Page St | One Inch To The Left, Inc. Dba Rarefield | repair existing deck. remove & replace guard railing (less than 50% in kind). add lath house to side of residence/deck.Details
repair existing deck. remove & replace guard railing (less than 50% in kind). add lath house to side of residence/deck. | $7,000 |
| Nov 4, 2010 | Completed final sign-off Dec 2010 | 328 Caselli Av | One Inch To The Left, Inc. Dba Rarefield | remove and replace existing rear deck and stairs, add new, lower deck to connect to replacement deck. lower deck to be less than 3 feet above gradeDetails
remove and replace existing rear deck and stairs, add new, lower deck to connect to replacement deck. lower deck to be less than 3 feet above grade | $17,500 |
| May 4, 2010 | Completed final sign-off Jul 2010 | 3660 22nd St | One Inch To The Left, Inc. Dba Rarefield | replace (e) deck in rear property. build firewall on east property line adjacent to deck. replace low retaining wall separating deck from garden.Details
replace (e) deck in rear property. build firewall on east property line adjacent to deck. replace low retaining wall separating deck from garden. | $10,500 |
| Jun 19, 2009 | Completed final sign-off Jun 2009 | 23 Topaz Wy | One Inch To The Left, Inc. Dba Rarefield | replace rotting joists on (e) deck, revision to pa# 2008-0923-2432Details
replace rotting joists on (e) deck, revision to pa# 2008-0923-2432 | $2,000 |
| Mar 19, 2009 | Completed final sign-off May 2009 | 766 Valencia St | One Inch To The Left, Inc. Dba Rarefield | renovation of commercial space for mission bicycle. new accessible counter system & accessible floor+entry door replacement to provide accesible pathway.Details
renovation of commercial space for mission bicycle. new accessible counter system & accessible floor+entry door replacement to provide accesible pathway. | $10,000 |
| Dec 10, 2008 | Completed final sign-off Jan 2009 | 1631 Dolores St | One Inch To The Left, Inc. Dba Rarefield | remove & replace (e) non confirming deck & stairs. re-use (e) firewall & reduce overall footprint of stairsDetails
remove & replace (e) non confirming deck & stairs. re-use (e) firewall & reduce overall footprint of stairs | $18,500 |
| Oct 22, 2008 | Completed final sign-off Dec 2008 | 766 Valencia St | One Inch To The Left, Inc. Dba Rarefield | bring entry door to ada code. build new interior dbl doors with windows above. close off one extg interior door. repair floor at entry for ada accessDetails
bring entry door to ada code. build new interior dbl doors with windows above. close off one extg interior door. repair floor at entry for ada access | $4,750 |
| Sep 23, 2008 | Completed final sign-off Jun 2009 | 23 Topaz Wy | One Inch To The Left, Inc. Dba Rarefield | add new exterior spiral stairway to connect existing 2nd fl balcony to garden below.Details
add new exterior spiral stairway to connect existing 2nd fl balcony to garden below. | $10,000 |
| Jun 3, 2008 | Completed final sign-off Aug 2009 | 305 Franconia St | One Inch To The Left, Inc. Dba Rarefield | new deck starting at grade, projecting over 65% slope into rear yard setback at a height that exceeds 30". construct low retaining walls, under 3' for terraced planting beds.Details
new deck starting at grade, projecting over 65% slope into rear yard setback at a height that exceeds 30". construct low retaining walls, under 3' for terraced planting beds. | $18,500 |
| Mar 31, 2008 | Completed final sign-off Mar 2009 | 459 Frederick St | One Inch To The Left, Inc. Dba Rarefield | drain for tile landing, concrete benches, construct deck around tile, construct stairs & install handrail.Details
drain for tile landing, concrete benches, construct deck around tile, construct stairs & install handrail. | $68,000 |
| Feb 26, 2008 | Completed final sign-off Jun 2008 | 1076 South Van Ness Av | One Inch To The Left, Inc. Dba Rarefield | replace ex. north and west rear yard fences with a new 6' fence and 2' trellis, totalling no more than 8'. build two trellises/arbors on fence at west property line total foot print of 60 sq ft or less. run electrical for gfi receptacles and gas line for fire pit. install irrigation valves.Details
replace ex. north and west rear yard fences with a new 6' fence and 2' trellis, totalling no more than 8'. build two trellises/arbors on fence at west property line total foot print of 60 sq ft or less. run electrical for gfi receptacles and gas line for fire pit. install irrigation valves. | $58,000 |
| Jun 14, 2007 | Completed final sign-off Oct 2007 | 2282 Bryant St | One Inch To The Left, Inc. Dba Rarefield | install spa necessary electrical on ex. roof deck irrigation valves 2 on ex. roof deck constuction raised, decorative. platfrom.Details
install spa necessary electrical on ex. roof deck irrigation valves 2 on ex. roof deck constuction raised, decorative. platfrom. | $10,000 |
| Apr 18, 2007 | Completed final sign-off Jul 2007 | 3353 Cesar Chavez St | One Inch To The Left, Inc. Dba Rarefield | flatwork-decking around spa hardwire. electrical gfi within 5 ft of spa box. visible from spa. plumbing irrigation valves. area drain at patio areaDetails
flatwork-decking around spa hardwire. electrical gfi within 5 ft of spa box. visible from spa. plumbing irrigation valves. area drain at patio area | $3,000 |
| Apr 12, 2007 | Completed final sign-off Feb 2008 | 4107 21st St | One Inch To The Left, Inc. Dba Rarefield | add stone planters to front. remove garage door & pedestrian door & repalce with single garage door.Details
add stone planters to front. remove garage door & pedestrian door & repalce with single garage door. | $38,000 |
| Feb 1, 2007 | Completed final sign-off Nov 2007 | 323 Hill St | One Inch To The Left, Inc. Dba Rarefield | new fence on rear property line, demo existing fence. extend side (west) fence 2' with lattice.Details
new fence on rear property line, demo existing fence. extend side (west) fence 2' with lattice. | $7,000 |
| Jan 9, 2007 | Completed final sign-off Apr 2007 | 465 Diamond St | One Inch To The Left, Inc. Dba Rarefield | remove portion of deck (appl#200609212988). pour concrete slab for new hot tub, install hot tub (pre manufactured). rebuild deck per plan.Details
remove portion of deck (appl#200609212988). pour concrete slab for new hot tub, install hot tub (pre manufactured). rebuild deck per plan. | $7,000 |
| Sep 21, 2006 | Completed final sign-off Apr 2007 | 465 Diamond St | One Inch To The Left, Inc. Dba Rarefield | replace rear deck in kind, retaining wall with concrete,build concrete stairs/landings at grade to upper garden, build deck, arbor,trellis-all new. replace south fence.Details
replace rear deck in kind, retaining wall with concrete,build concrete stairs/landings at grade to upper garden, build deck, arbor,trellis-all new. replace south fence. | $118,000 |
| Jul 28, 2006 | Completed final sign-off Jan 2007 | 3722 21st St | One Inch To The Left, Inc. Dba Rarefield | rear garden fencing, trellises,arbors. build surround for spa & deck at grade. plants,, irrigation & low-voltage lighting. spa to be portable "plug-in" unit.Details
rear garden fencing, trellises,arbors. build surround for spa & deck at grade. plants,, irrigation & low-voltage lighting. spa to be portable "plug-in" unit. | $41,000 |
| Dec 29, 2005 | Completed final sign-off Apr 2006 | 4036 25th St | One Inch To The Left, Inc. Dba Rarefield | build new fence at rear/rebuild extg stairs in kind same footprint/modify extg banisters/build new arbor/trellis sturctures at rearDetails
build new fence at rear/rebuild extg stairs in kind same footprint/modify extg banisters/build new arbor/trellis sturctures at rear | $9,500 |
| Oct 25, 2005 | Completed final sign-off Jul 2006 | 2517 Harrison St | One Inch To The Left, Inc. Dba Rarefield | remove failing deck, build new deck.Details
remove failing deck, build new deck. | $12,000 |
| Oct 11, 2005 | Never finaled issued Oct 2005, no final | 57 Thrift St | One Inch To The Left, Inc. Dba Rarefield | build new deck at back of houseDetails
build new deck at back of house | $14,000 |
| Sep 27, 2005 | Completed final sign-off Nov 2005 | 825 Alvarado St | One Inch To The Left, Inc. Dba Rarefield | revision to pa 200505273650Details
revision to pa 200505273650 | $10,000 |
| Sep 27, 2005 | Completed final sign-off Dec 2005 | 530 Mangels Av | One Inch To The Left, Inc. Dba Rarefield | building deck in rear garden. replacing window over new deck with door.Details
building deck in rear garden. replacing window over new deck with door. | $8,500 |
| May 27, 2005 | Never finaled issued May 2005, no final | 825 Alvarado St | One Inch To The Left, Inc. Dba Rarefield | remove & rebuild front stairs in existing footprint.Details
remove & rebuild front stairs in existing footprint. | $4,800 |
| Oct 28, 2004 | Completed final sign-off Apr 2005 | 825 Alvarado St | One Inch To The Left, Inc. Dba Rarefield | build concrete valult to hold prefab .spa build areas.Details
build concrete valult to hold prefab .spa build areas. | $5,000 |
| Sep 16, 2004 | Completed final sign-off Oct 2004 | 601 Alvarado St | One Inch To The Left, Inc. Dba Rarefield | replac existing deck, in kind (same footprint)Details
replac existing deck, in kind (same footprint) | $6,800 |