Jasper Calcara
- Listed as
- architect, engineer
- Firm
- Dhc Engineering
- Based in
- Santa Rosa
- On San Francisco permits
- Aug 2006 to Oct 2010
5 permits since 2000 (engineer on 4 permits, architect on 1 permit): 3 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 22, 2010 | Completed final sign-off Oct 2011 | 455 Market St | Pankow Special Projects Lp | extend roof track on roof for washing rigDetails
extend roof track on roof for washing rig | $160,000 |
| Oct 27, 2008 | Completed final sign-off Dec 2008 | 222 Sutter St | revision the original pemit under #200701232180 showed gaurdrail detail to be attached to the roof and wall. the gaurdrail have been eliminated from the project(around one and a half skylights and 2 roof locations)Details
revision the original pemit under #200701232180 showed gaurdrail detail to be attached to the roof and wall. the gaurdrail have been eliminated from the project(around one and a half skylights and 2 roof locations) | $30,000 | |
| Jun 25, 2007 | Never finaled issued Aug 2007, no final | 942 Market St | exterior building maintenance system (window washing equipment)Details
exterior building maintenance system (window washing equipment) | $15,000 | |
| May 30, 2007 | Never finaled issued Mar 2008, no final | 582 Market St | install window washing equipment, davits, socket & anchors on the roof (levels 13 and 21).Details
install window washing equipment, davits, socket & anchors on the roof (levels 13 and 21). | $65,000 | |
| Aug 31, 2006 | Completed final sign-off Jan 2008 | 201 Spear St | exterior building maintenance installation of 23 new pedestal replacement davits.Details
exterior building maintenance installation of 23 new pedestal replacement davits. | $20,000 |