Jason Weckworth
- Listed as
- contractor, designer
- Firm
- Weckworth Electric Group Inc
- Based in
- El Dorado Hills
- On San Francisco permits
- Feb 2019 to Oct 2022
46 permits since 2000 (contractor on 46 permits, designer on 1 permit): 38 completed, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 14, 2022 | Completed final sign-off Oct 2022 | 350 Mission St | Weckworth Electric Group Inc | fire only: errc corrections after sf upgrade to new frequencies. red cloud to install additional antenna and leaks coax in elec room shaft.Details
fire only: errc corrections after sf upgrade to new frequencies. red cloud to install additional antenna and leaks coax in elec room shaft. | |
| Jul 14, 2022 | Completed final sign-off Sep 2022 | 1100 Market St | Weckworth Electric Group Inc | errcs upgrade fire only: replacing bda head unit to comply with new frequencies as well as preplace donor antenna with gamma nu. of existing antenna on roof.Details
errcs upgrade fire only: replacing bda head unit to comply with new frequencies as well as preplace donor antenna with gamma nu. of existing antenna on roof. | $10,000 |
| Mar 31, 2022 | Completed final sign-off Jun 2022 | 5880 03rd St | Weckworth Electric Group Inc | red cloud to upgrade the donor "roof" antenna and reprogram the errcs radio frequencies to comply with new requirements. all other components remain unchangedDetails
red cloud to upgrade the donor "roof" antenna and reprogram the errcs radio frequencies to comply with new requirements. all other components remain unchanged | $10,000 |
| Dec 2, 2021 | Completed final sign-off Mar 2022 | 33 Seneca Av | Weckworth Electric Group Inc | red cloud to reprogram the (e) commuscope bda & replace the donor roof antenna to comply w/ sf frequencies. all other components remain unchanged. original errcs permit was 2018-0131-0011.Details
red cloud to reprogram the (e) commuscope bda & replace the donor roof antenna to comply w/ sf frequencies. all other components remain unchanged. original errcs permit was 2018-0131-0011. | $10,000 |
| Nov 30, 2021 | Never finaled issued Dec 2021, no final | 73 Arkansas St | Weckworth Electric Group Inc | title 24 compliance: rough-in and installation of receptacles, switches, lights fixtures and one electrical panel. ref to pa #2021 0204 4017.Details
title 24 compliance: rough-in and installation of receptacles, switches, lights fixtures and one electrical panel. ref to pa #2021 0204 4017. | $25,000 |
| Sep 2, 2021 | Never finaled filed Sep 2021, never issued | 800 Indiana St | Weckworth Electric Group Inc | red cloud to replace the bda head and unit as well as the door "roof" antenna to comply w/ sf errcs frequencies. all other components remain unchange.Details
red cloud to replace the bda head and unit as well as the door "roof" antenna to comply w/ sf errcs frequencies. all other components remain unchange. | $10,000 |
| Aug 27, 2021 | Completed final sign-off Apr 2022 | 3555 Cesar Chavez St | Weckworth Electric Group Inc | red cloud to reprogram the bda head end unit and replace the donor "roof antenna to comply with sf errcs frequency. all other components remain unchanged. ref 202108277252.Details
red cloud to reprogram the bda head end unit and replace the donor "roof antenna to comply with sf errcs frequency. all other components remain unchanged. ref 202108277252. | $10,000 |
| Aug 10, 2021 | Completed final sign-off Mar 2024 | 350 08th St | Weckworth Electric Group Inc | red cloud to replace the bda head end unit as well as the donor "roof: antenna to comply w/ sf errcs frequencies. all other components remain unchanged.Details
red cloud to replace the bda head end unit as well as the donor "roof: antenna to comply w/ sf errcs frequencies. all other components remain unchanged. | $10,000 |
| Jul 13, 2021 | Completed final sign-off May 2022 | 95 Laguna St | Weckworth Electric Group Inc | red cloud to replace the errcs bda head end unit as well as the donor "roof" antenna to comply w/ sf fraquencies, all other components remain unchanged. ref# 201811014814.Details
red cloud to replace the errcs bda head end unit as well as the donor "roof" antenna to comply w/ sf fraquencies, all other components remain unchanged. ref# 201811014814. | |
| Jul 13, 2021 | Completed final sign-off May 2022 | 55 Laguna St | Weckworth Electric Group Inc | red cloud to reprogram (e) errcs bda head end unit as well as replace. the donor "root" antenna to comply w/ sf frequences. all other components remain unchanged.Details
red cloud to reprogram (e) errcs bda head end unit as well as replace. the donor "root" antenna to comply w/ sf frequences. all other components remain unchanged. | |
| Jul 8, 2021 | Completed final sign-off Sep 2021 | 588 Mission Bay Blvd North Bl | Weckworth Electric Group Inc | reprogram (e) errcs bda head end unit as well as replace the donor roof antenna to comply with sf frequencies. all other components remain unchanged. ref pa201511031492.Details
reprogram (e) errcs bda head end unit as well as replace the donor roof antenna to comply with sf frequencies. all other components remain unchanged. ref pa201511031492. | $10,000 |
| Jul 8, 2021 | Completed final sign-off Dec 2021 | 626 Mission Bay Blvd North Bl | Weckworth Electric Group Inc | red cloud to reprogrm (e) erpcs bda head end unit a well as replace the donor "roof" antenna, all other compnents remain unchanged. ref 2015-0727-2485Details
red cloud to reprogrm (e) erpcs bda head end unit a well as replace the donor "roof" antenna, all other compnents remain unchanged. ref 2015-0727-2485 | $10,000 |
| Jun 29, 2021 | Completed final sign-off Dec 2021 | 1321 Mission St | Weckworth Electric Group Inc | red cloud to reprogram (e) errcs bda head end unit and replace the roof antenna to comply w/ sf frequencies. all other compononts remain unchanged.Details
red cloud to reprogram (e) errcs bda head end unit and replace the roof antenna to comply w/ sf frequencies. all other compononts remain unchanged. | $10,000 |
| Jun 29, 2021 | Completed final sign-off Nov 2021 | 999 Brannan St | Weckworth Electric Group Inc | red cloud to replace the existing bda head end unit as well as the "donor" errcs antenna to comply with sf frequencies. all other components remain unchanged.Details
red cloud to replace the existing bda head end unit as well as the "donor" errcs antenna to comply with sf frequencies. all other components remain unchanged. | $20,000 |
| Jun 9, 2021 | Completed final sign-off Oct 2021 | 200 Buchanan St | Weckworth Electric Group Inc | red cloud to reprogram bda head end unit as well as replace the roof errcs antenna to comply with sf frequencies. all other components remain unchanged.Details
red cloud to reprogram bda head end unit as well as replace the roof errcs antenna to comply with sf frequencies. all other components remain unchanged. | $10,000 |
| Jun 9, 2021 | Completed final sign-off Sep 2021 | 399 Geary St | Weckworth Electric Group Inc | red cloud to replace bda head end unit as well as the roof errcs antenna to comply with sf frequencies. all other components remain unchanged.Details
red cloud to replace bda head end unit as well as the roof errcs antenna to comply with sf frequencies. all other components remain unchanged. | |
| Jun 9, 2021 | Completed final sign-off May 2022 | 165 Ofarrell St | Weckworth Electric Group Inc | red cloud to replace bda head end unit as well as the roof errcs antenna to comply with sf frequencies. all other components remain unchanged.Details
red cloud to replace bda head end unit as well as the roof errcs antenna to comply with sf frequencies. all other components remain unchanged. | $20,000 |
| May 27, 2021 | Completed final sign-off Sep 2021 | 875 California St | Weckworth Electric Group Inc | red cloud to reprogram the existing bda to comply with the sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged.Details
red cloud to reprogram the existing bda to comply with the sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged. | $10,000 |
| May 27, 2021 | Completed final sign-off Dec 2021 | 1238 Sutter St | Weckworth Electric Group Inc | red cloud to reprogram the bda head end unit to comply with the sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged.Details
red cloud to reprogram the bda head end unit to comply with the sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged. | $20,000 |
| May 27, 2021 | Completed final sign-off Sep 2021 | 360 Berry St | Weckworth Electric Group Inc | red cloud to reprogram the existing bda to comply with the sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged.Details
red cloud to reprogram the existing bda to comply with the sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged. | $10,000 |
| May 26, 2021 | Completed final sign-off Jan 2022 | 1100 Van Ness Av | Weckworth Electric Group Inc | red cloud to replace the bda head end unit to comply with the sf errcs frequencies, as well as replace the donor "roof" antenna. all other components remained unchanged.Details
red cloud to replace the bda head end unit to comply with the sf errcs frequencies, as well as replace the donor "roof" antenna. all other components remained unchanged. | $10,000 |
| May 26, 2021 | Never finaled issued Jun 2021, no final | 1 Stanyan Bl | Weckworth Electric Group Inc | red cloud to replace the bda head e nd unit to comply with rge sf errcs frequencies, as well as replace the donor "roof" antenna. all other components remained unchanged.Details
red cloud to replace the bda head e nd unit to comply with rge sf errcs frequencies, as well as replace the donor "roof" antenna. all other components remained unchanged. | $20,000 |
| May 26, 2021 | Completed final sign-off Sep 2021 | 990 Pacific Av | Weckworth Electric Group Inc | red cloud to replace the bda head end unit to comply with the sf errcs frequencies, as well as replace the donor "roof" antenna. all other components remained unchanged.Details
red cloud to replace the bda head end unit to comply with the sf errcs frequencies, as well as replace the donor "roof" antenna. all other components remained unchanged. | $20,000 |
| May 26, 2021 | Completed final sign-off Nov 2021 | 75 Arkansas St | Weckworth Electric Group Inc | red cloud to replace the bda head end unit to comply with the sf errcs frequencies, as well as replace the donor "roof" antenna. all other components remained unchanged.Details
red cloud to replace the bda head end unit to comply with the sf errcs frequencies, as well as replace the donor "roof" antenna. all other components remained unchanged. | $20,000 |
| May 25, 2021 | Completed final sign-off Nov 2021 | 270 Brannan St | Weckworth Electric Group Inc | red cloud to reprogram the existing bda to comply with sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged.Details
red cloud to reprogram the existing bda to comply with sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged. | $10,000 |
| May 25, 2021 | Completed final sign-off Dec 2021 | 1650 Broadway | Weckworth Electric Group Inc | red cloud to replace the existing bda to comply with sf errcs radio frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged.Details
red cloud to replace the existing bda to comply with sf errcs radio frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged. | $20,000 |
| May 25, 2021 | Completed final sign-off Dec 2021 | 250 Howard St | Weckworth Electric Group Inc | red cloud to reprogram the existing bda to comply with sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged.Details
red cloud to reprogram the existing bda to comply with sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged. | $10,000 |
| May 25, 2021 | Completed final sign-off Dec 2021 | 1400 Mission St | Weckworth Electric Group Inc | red cloud to reprogram the existing bda to comply with sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged.Details
red cloud to reprogram the existing bda to comply with sf errcs frequencies, as well as replace the roof "donor" antenna. all other components remain unchanged. | $10,000 |
| May 19, 2021 | Completed final sign-off Nov 2021 | 1201 California St | Weckworth Electric Group Inc | red cloud to install the new gamma nu root antenna and replace the bda with errcs compliance upgrade. all other components remained unchanged.Details
red cloud to install the new gamma nu root antenna and replace the bda with errcs compliance upgrade. all other components remained unchanged. | $20,000 |
| May 19, 2021 | Completed final sign-off Mar 2022 | 119 07th St | Weckworth Electric Group Inc | red cloud installed the sf errcs compliant bda & donor antenna before the job finished construction. this is the as-built to permit #2014-0624-9298-s9.Details
red cloud installed the sf errcs compliant bda & donor antenna before the job finished construction. this is the as-built to permit #2014-0624-9298-s9. | |
| May 19, 2021 | Completed final sign-off Dec 2021 | 33 Tehama St | Weckworth Electric Group Inc | red cloud to install the new gamma nu root antenna and reprogram the existing commscope bda for the sf errcs compliance upgrade. all other components remained unchanged.Details
red cloud to install the new gamma nu root antenna and reprogram the existing commscope bda for the sf errcs compliance upgrade. all other components remained unchanged. | $20,000 |
| May 19, 2021 | Completed final sign-off Nov 2021 | 1095 Market St | Weckworth Electric Group Inc | red cloud to install the new gamma nu root antenna and replace the bda with comba for the sf errcs compliance upgrade. all other components remained unchanged.Details
red cloud to install the new gamma nu root antenna and replace the bda with comba for the sf errcs compliance upgrade. all other components remained unchanged. | $20,000 |
| May 5, 2021 | Completed final sign-off Nov 2021 | 719 Larkin St | Weckworth Electric Group Inc | red cloud to replace bda to new comba sf compliance model as well as replace the roof "donor" antenna to gamma nu. errcs - ref 201612225735Details
red cloud to replace bda to new comba sf compliance model as well as replace the roof "donor" antenna to gamma nu. errcs - ref 201612225735 | |
| Apr 28, 2021 | Completed final sign-off Nov 2021 | 201 Folsom St | Weckworth Electric Group Inc | red cloud to replace bda with new sf compliant model as well as replace the donor "roof" antenna to the gamma nu. all other components remained unchanged.Details
red cloud to replace bda with new sf compliant model as well as replace the donor "roof" antenna to the gamma nu. all other components remained unchanged. | $25,000 |
| Apr 28, 2021 | Completed final sign-off Jun 2021 | 1000 03rd St | Weckworth Electric Group Inc | red cloud to reprogram exsting commscope bda with updated emergency frequencies to comply with new sf frequencies list. replace donor "roof" antenna with gamma nu. all components remain unchanged.Details
red cloud to reprogram exsting commscope bda with updated emergency frequencies to comply with new sf frequencies list. replace donor "roof" antenna with gamma nu. all components remain unchanged. | $25,000 |
| Apr 28, 2021 | Completed final sign-off Mar 2022 | 350 Mission St | Weckworth Electric Group Inc | red cloud to replace bda head end unit to new comba sf compliant bda and replace donor "roof" antenna with gamma nu. all other components remain unchanged.Details
red cloud to replace bda head end unit to new comba sf compliant bda and replace donor "roof" antenna with gamma nu. all other components remain unchanged. | $25,000 |
| Apr 28, 2021 | Completed final sign-off Jun 2021 | 110 Channel | Weckworth Electric Group Inc | red cloud to reprogram & replace donor "roof" antenna with gamma nu. all other components remain unchanged.Details
red cloud to reprogram & replace donor "roof" antenna with gamma nu. all other components remain unchanged. | $25,000 |
| Feb 5, 2021 | Never finaled issued Apr 2021, no final | 299 Fremont St | Weckworth Electric Group Inc | replace bda head end unit to comply with new frequency as well as replace the door antenna with a gamma nv at existing atnenna on roof.Details
replace bda head end unit to comply with new frequency as well as replace the door antenna with a gamma nv at existing atnenna on roof. | $20,000 |
| Jul 15, 2020 | Completed final sign-off May 2021 | 3850 18th St | Weckworth Electric Group Inc | as-built rev to pa 201803083185 to comply w/ sffd letter dtd 12/14/2019. red cloud to reprogram (e) commscope bda to new sf frequencies. replace yagi w/ gamma nu and point towards twin peaks. all other errc's to remain unchanged.Details
as-built rev to pa 201803083185 to comply w/ sffd letter dtd 12/14/2019. red cloud to reprogram (e) commscope bda to new sf frequencies. replace yagi w/ gamma nu and point towards twin peaks. all other errc's to remain unchanged. | $10,000 |
| Jul 15, 2020 | Expired or cancelled suspend Sep 2020 | 255 Woodside Av | Weckworth Electric Group Inc | red cloud to replace bda w/ combo and program sf frequencies. red cloud to upgrade donor antenna and point towards twin peaks. all other errc's will remain unchanged.Details
red cloud to replace bda w/ combo and program sf frequencies. red cloud to upgrade donor antenna and point towards twin peaks. all other errc's will remain unchanged. | $10,000 |
| Jul 15, 2020 | Completed final sign-off May 2021 | 1855 15th St | Weckworth Electric Group Inc | red cloud to replace bda w/ combo and program sf frequencies. red cloud to replace donor antenna and point towards twin peaks. all other errc's will remain unchanged.Details
red cloud to replace bda w/ combo and program sf frequencies. red cloud to replace donor antenna and point towards twin peaks. all other errc's will remain unchanged. | $10,000 |
| Jul 15, 2020 | Never finaled issued Aug 2020, no final | 462 Duboce Av | Weckworth Electric Group Inc | red cloud to replace bda w/ combo and program sf frequencies. red cloud to upgrade donor antenna and point towards twin peaks. all other errc's will remain unchanged. as built for pa #201809129884Details
red cloud to replace bda w/ combo and program sf frequencies. red cloud to upgrade donor antenna and point towards twin peaks. all other errc's will remain unchanged. as built for pa #201809129884 | $10,000 |
| Jul 2, 2020 | Completed final sign-off Apr 2021 | 1800 Owens St | Weckworth Electric Group Inc | install new combo bda and new gamma nu donor antennaDetails
install new combo bda and new gamma nu donor antenna | $10,000 |
| Apr 8, 2019 | Completed final sign-off Apr 2019 | 228 Grant Av | Weckworth Electric Group Inc | adding electrical outlets to (e) and new walls 45 total outletsDetails
adding electrical outlets to (e) and new walls 45 total outlets | $5,000 |
| Feb 26, 2019 | Expired or cancelled cancelled Jan 2026 | 535 Geary St | Weckworth Electric Group Inc | service upgrade from 100/240 volt single phase to a 120/208 volt 3 phase service weck worth electric group will install (1) new pg & e tap box (1) new switch board, new meter sections, new feeders to fire pump, new subpanels on tenant floors, and new feedsDetails
service upgrade from 100/240 volt single phase to a 120/208 volt 3 phase service weck worth electric group will install (1) new pg & e tap box (1) new switch board, new meter sections, new feeders to fire pump, new subpanels on tenant floors, and new feeds | $50,000 |
| Feb 26, 2019 | Expired or cancelled cancelled Jan 2026 | 627 Taylor St | Weckworth Electric Group Inc | service upgrade from 120/240 volt single phase service to 120/208 volt 3 phase service, weck worth electric ground will install (1) new main switchboard with (40) meter sections and (1) new load center for each unitDetails
service upgrade from 120/240 volt single phase service to 120/208 volt 3 phase service, weck worth electric ground will install (1) new main switchboard with (40) meter sections and (1) new load center for each unit | $30,000 |