Perkins & Will Perkins & Will
- License
- C20274
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Oct 2004 to Mar 2009
7 permits since 2000 (architect on 7 permits): 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Gci, Inc (2), Turner Construction Co (2), Dpr Construction Inc
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 6
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 26, 2009 | Completed final sign-off Jun 2009 | 185 Berry St | Gci, Inc | suite#5100. relocate theromostat, relocate switches, relocate (e) light fixtures, install new fixtures & new electrical. refer to architectural pa# 2009-0310-3732Details
suite#5100. relocate theromostat, relocate switches, relocate (e) light fixtures, install new fixtures & new electrical. refer to architectural pa# 2009-0310-3732 | $12,000 |
| Mar 10, 2009 | Completed final sign-off Jun 2009 | 185 Berry St | Gci, Inc | 5th floor-demolition of (e) partitions, addition of new moveable glass partitionDetails
5th floor-demolition of (e) partitions, addition of new moveable glass partition | $109,742 |
| Nov 5, 2008 | Completed final sign-off Feb 2009 | 555 Mission St | Turner Construction Co | 19th floor-revision to pa# 2008-1007-3550-wall and ceiling finishes for reception/lobby area of the workDetails
19th floor-revision to pa# 2008-1007-3550-wall and ceiling finishes for reception/lobby area of the work | $60,000 |
| Oct 7, 2008 | Completed final sign-off Feb 2009 | 555 Mission St | Turner Construction Co | 19th flr - interior construction build out of tenant space. approx 6667 sq ft consisting of drywall, steel stud partitons, acoustical ceiling system, doors, hardware. electrical data systems, raised concrete pan floor system and wall, floor finishes. m.e.p. under this permi. first tenant improvementDetails
19th flr - interior construction build out of tenant space. approx 6667 sq ft consisting of drywall, steel stud partitons, acoustical ceiling system, doors, hardware. electrical data systems, raised concrete pan floor system and wall, floor finishes. m.e.p. under this permi. first tenant improvement | $650,000 |
| Jan 3, 2007 | Completed final sign-off Sep 2007 | 169 Steuart St | Dpr Construction Inc | locker room upgrades 2 & 4 floors.Details
locker room upgrades 2 & 4 floors. | $113,586 |
| May 23, 2005 | Expired or cancelled expired Mar 2009 | 1160 Battery St | oti of 3,109js.f. on third fl, including plumbing & electrical, me, ls, sp, el.Details
oti of 3,109js.f. on third fl, including plumbing & electrical, me, ls, sp, el. | $85,000 | |
| Oct 22, 2004 | Completed final sign-off Jun 2005 | 350 Rhode Island St | phase 2 of pa# 2004/04/09/0900. partitions for resturant on 1st floor. class room on 2nd floor & 3rdDetails
phase 2 of pa# 2004/04/09/0900. partitions for resturant on 1st floor. class room on 2nd floor & 3rd | $1,700,000 |