Gary Gee
- License
- C14060
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C14060 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Gary Gee Architects, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2026
292 permits since 2000 (architect on 279 permits, authorized agent-others on 11 permits, engineer on 4 permits, pmt consultant/expediter on 3 permits): 177 completed, 22 in progress, 50 never finaled, 43 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Brennan Strong Hold Construction Inc (7), K 2 Builders Inc (7), Huey Const Mngmt Co Inc - Dba M H Const. (6), Schrobsdorff Construction (6), O'toole Construction Inc. (4), Kerley Construction Inc (3), Mutual Seiko Construction (3), Rp Construction (2), Success Construction ***See Notes*** (2), Alder Construction, C D R Construction, Canche Construction Inc, Doyle Developments, Jian Construction Company, Jin Construction & Elec, Martin Building Co, Mullan Enterprises Inc, N M S Brosnan Construction, Sjk Development, Tipco Construction Inc, Wei Dang Builders Inc.
- Architects
- Troy Christensen
- Engineers
- Donald David (6), Albert Urrutia (5), Erwin O'toole (2), Jia Hui Pan (2), Antonio Jacksalem, Gregory Wallace, Meng Hsiu Chen, Michael Hom
- Authorized agents
- Mike Waterston
Where they worked
- Single-family 12
- Multi-family (2-family, apartments) 29
- Commercial 51
- Other or unknown 8
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
Showing the 100 most recent of 292.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 15, 2026 | In progress issued Nov 2026 | 1391 Vallejo St | Brennan Strong Hold Construction Inc | revision to bpa: 202609117958 - addition of new condition space for 1391 and remodel (e) kitchen and stair. install new stair to roof deck for 1393 and remodel kitchen.Details
revision to bpa: 202609117958 - addition of new condition space for 1391 and remodel (e) kitchen and stair. install new stair to roof deck for 1393 and remodel kitchen. | $125,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1125 Revere Av | corrections for nov #: 202659151 - document field conditions and legalize 2nd floor. administrative change of use for first floor from u to f-1.Details
corrections for nov #: 202659151 - document field conditions and legalize 2nd floor. administrative change of use for first floor from u to f-1. | $50,000 | |
| Sep 28, 2026 | In progress issued Oct 2026 | 2230 22nd Av | revision to work under construction permit #202609178306. remodel existing second floor of single family residence to add new bathroom and relocate stair to 1st floor.Details
revision to work under construction permit #202609178306. remodel existing second floor of single family residence to add new bathroom and relocate stair to 1st floor. | $120,000 | |
| Sep 17, 2026 | In progress issued Sep 2026 | 2230 22nd Av | remodel existing first floor of single family residence and convert 1st floor into habitable space.Details
remodel existing first floor of single family residence and convert 1st floor into habitable space. | $188,000 | |
| Sep 11, 2026 | In progress issued Sep 2026 | 1391 Vallejo St | Brennan Strong Hold Construction Inc | remodel units 1391/1393 addition f new bathroom. install new stair to basement connecting 1/f to unit 1931. amend 202608056148 remodel (e) kitchen/bath in both unit.Details
remodel units 1391/1393 addition f new bathroom. install new stair to basement connecting 1/f to unit 1931. amend 202608056148 remodel (e) kitchen/bath in both unit. | $80,000 |
| Aug 27, 2026 | In progress issued Sep 2026 | 2230 22nd Av | enclose existing lightwells on north and south property line wallsDetails
enclose existing lightwells on north and south property line walls | $15,000 | |
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 1400 Mission St | install new metal gate on jessie st. common area | $8,000 | |
| Jul 6, 2026 | In progress issued Aug 2026 | 2346 Lombard St | Tipco Construction Inc | ground floor: ti to existing space for studio retail.Details
ground floor: ti to existing space for studio retail. | $10,000 |
| Apr 7, 2026 | In progress issued May 2026 | 1251 Connecticut St | adminstrative permit to change of use & occupancy group s-2 warehouse to group b. research and development with accessor office. no construction work.Details
adminstrative permit to change of use & occupancy group s-2 warehouse to group b. research and development with accessor office. no construction work. | ||
| Jan 15, 2026 | In progress filed Jan 2026, not yet issued | 1125 Revere Av | corrections for nov #202658564. administrative change of use from u to f-1 occupancy. document field conditions and legalize 2nd floor.Details
corrections for nov #202658564. administrative change of use from u to f-1 occupancy. document field conditions and legalize 2nd floor. | ||
| Dec 26, 2025 | Completed final sign-off Apr 2026 | 1713 17th St | Sjk Development | non-structural tenant improvement to existing office on existing mezzanine level.Details
non-structural tenant improvement to existing office on existing mezzanine level. | $5,000 |
| Dec 24, 2025 | In progress issued Apr 2026 | 38 Belcher St | replace (e) fire escape in kind from roof to light courtyardDetails
replace (e) fire escape in kind from roof to light courtyard | $10,000 | |
| Oct 28, 2025 | In progress issued Jan 2026 | 1616 Pacific Av | Brennan Strong Hold Construction Inc | remove existing restroom. install new accessible restroom with employee breakroom.Details
remove existing restroom. install new accessible restroom with employee breakroom. | $40,000 |
| Oct 24, 2025 | Completed final sign-off Jan 2026 | 8 Boardman Pl | Martin Building Co | 1st & 2nd fl: non-structural tenant improvement to e) office, 2 new offices on each fl. no plumbing fixtures.Details
1st & 2nd fl: non-structural tenant improvement to e) office, 2 new offices on each fl. no plumbing fixtures. | $8,000 |
| Oct 9, 2025 | Completed final sign-off Oct 2025 | 3231 16th St | document site conditions for approved site and addendum permit 2018-0807-6659Details
document site conditions for approved site and addendum permit 2018-0807-6659 | ||
| Sep 30, 2025 | In progress issued Nov 2025 | 1255 Connecticut St | ref 202412307485- ti for semi conductor business/office to inlcude (n) tables, equipment sesimic anchoring and locate gas lines on 1st floor.Details
ref 202412307485- ti for semi conductor business/office to inlcude (n) tables, equipment sesimic anchoring and locate gas lines on 1st floor. | $25,000 | |
| Sep 25, 2025 | In progress issued Nov 2025 | 711 Scott St | Alder Construction | window replacement: doors and windows on rear facade of building to be replaced in-kindDetails
window replacement: doors and windows on rear facade of building to be replaced in-kind | $56,800 |
| Sep 19, 2025 | Completed final sign-off Mar 2026 | 4411 Geary Bl | Jin Construction & Elec | t.i. ste# 100 & 200: change of use for ste# 100 only from massage to office. 1st/f: remodel e) bathroom into new accessible bathroom, install new non-bearing paritions & doors, relocate e) electric hot water heater. 2nd/f: install new non-bearing partitions & doorsDetails
t.i. ste# 100 & 200: change of use for ste# 100 only from massage to office. 1st/f: remodel e) bathroom into new accessible bathroom, install new non-bearing paritions & doors, relocate e) electric hot water heater. 2nd/f: install new non-bearing partitions & doors | $48,000 |
| May 1, 2025 | In progress issued Nov 2025 | 350 Frederick St | Doyle Developments | build one bedroom adu in the first floor storage areaDetails
build one bedroom adu in the first floor storage area | $75,000 |
| Apr 28, 2025 | In progress issued Jul 2025 | 313 Ivy St | Schrobsdorff Construction | replace existing bar equipment with new like for like. replace bar counter. install new banquette. install power door operators.Details
replace existing bar equipment with new like for like. replace bar counter. install new banquette. install power door operators. | $40,000 |
| Mar 19, 2025 | Completed final sign-off Jun 2025 | 150 Eureka St | K 2 Builders Inc | legalize 3 storage units into local adu's. no construction work.Details
legalize 3 storage units into local adu's. no construction work. | |
| Feb 6, 2025 | Completed final sign-off Apr 2025 | 305 West Portal Av | 305 west portal - change of use from laundry to personal training-gym. no change in occupancy "b". no construction.Details
305 west portal - change of use from laundry to personal training-gym. no change in occupancy "b". no construction. | ||
| Dec 30, 2024 | Completed final sign-off May 2025 | 1255 Connecticut St | non structural tenant impovement. install glass partition at first floor and door at mezzanine rear stair. change of use from s-2 to bDetails
non structural tenant impovement. install glass partition at first floor and door at mezzanine rear stair. change of use from s-2 to b | $10,000 | |
| Dec 20, 2024 | Completed final sign-off May 2025 | 1255 Connecticut St | install hvac system on roof and interior spaces.Details
install hvac system on roof and interior spaces. | $25,000 | |
| Sep 6, 2024 | Completed final sign-off Aug 2025 | 800 Taraval St | Schrobsdorff Construction | revision to pa #202403268586 under construction: repair existing stair to second floor. install new ada toilet. replace existing finish floor.Details
revision to pa #202403268586 under construction: repair existing stair to second floor. install new ada toilet. replace existing finish floor. | $5,000 |
| Sep 4, 2024 | Completed final sign-off Jan 2025 | 150 Eureka St | K 2 Builders Inc | revision to pa#201912169688. change heat pumps to radiant floors heating units 101 and 201Details
revision to pa#201912169688. change heat pumps to radiant floors heating units 101 and 201 | |
| Aug 5, 2024 | In progress filed Aug 2024, not yet issued | 3438 Mission St | provide abe accessible entry with power door operator per ab-04 abe#202408070221Details
provide abe accessible entry with power door operator per ab-04 abe#202408070221 | $1,500 | |
| Jul 19, 2024 | Completed final sign-off Oct 2024 | 2346 Lombard St | unit #102: t.i. to existing commercial ground level office space. existing mechanical and lighting to remain. install one ada toilet room and temper glass aprtition and cabinet. mep under separate permit.Details
unit #102: t.i. to existing commercial ground level office space. existing mechanical and lighting to remain. install one ada toilet room and temper glass aprtition and cabinet. mep under separate permit. | $15,000 | |
| Jul 16, 2024 | Completed final sign-off Dec 2024 | 30 Liberty St | revision pa# 2018-1213-8244 relocate kitchen & add 1 bathDetails
revision pa# 2018-1213-8244 relocate kitchen & add 1 bath | $1,000 | |
| Jul 16, 2024 | Completed final sign-off Jan 2025 | 150 Eureka St | K 2 Builders Inc | revision to pa# 201912169688. change heat pumps to radiant floor heating in storage units a,b,c.Details
revision to pa# 201912169688. change heat pumps to radiant floor heating in storage units a,b,c. | |
| Jul 3, 2024 | In progress issued Jul 2024 | 461 Grant Av | barrier removal. accessible business entrance program 51-16. abe #202206291960. install call button & signage, re-strip stais, repair loos tread & handrail. add 1 south hand rail at stairDetails
barrier removal. accessible business entrance program 51-16. abe #202206291960. install call button & signage, re-strip stais, repair loos tread & handrail. add 1 south hand rail at stair | $1,000 | |
| Jun 18, 2024 | In progress issued Jul 2024 | 70 Otis St | to comply with abe. barrier removal: per abe201920115088 provide sign for alternative meeting space for 70-72 otis stDetails
to comply with abe. barrier removal: per abe201920115088 provide sign for alternative meeting space for 70-72 otis st | $500 | |
| Jun 18, 2024 | In progress issued Jul 2024 | 98 Brady St | comply with abe program. barrier removal: per abe201901284706. install power door operators per da -04 and da 05 and adjust door force for 98 brady stDetails
comply with abe program. barrier removal: per abe201901284706. install power door operators per da -04 and da 05 and adjust door force for 98 brady st | $500 | |
| May 31, 2024 | In progress issued Jul 2024 | 461 Grant Av | to legalize (e) awning amensity program. no novDetails
to legalize (e) awning amensity program. no nov | ||
| Apr 26, 2024 | Completed final sign-off Aug 2025 | 800 Taraval St | Schrobsdorff Construction | replace existing kitchen equipment. repair/replace wall finishes; new 36" high pony wall in kitchenDetails
replace existing kitchen equipment. repair/replace wall finishes; new 36" high pony wall in kitchen | $48,000 |
| Mar 27, 2024 | Expired or cancelled cancelled Aug 2024 | 241 Scott St | repair/ replace wall tile, toilet and flooring at one bathroom in each unit 241 and 243. replace like for like.Details
repair/ replace wall tile, toilet and flooring at one bathroom in each unit 241 and 243. replace like for like. | $2,000 | |
| Mar 26, 2024 | Completed final sign-off Aug 2025 | 800 Taraval St | Schrobsdorff Construction | restaurant ti - new equipment for (e) bar. repair/replace plaster at wall sand ceiling relocate openings at dining room non load bearing interior walls move wall in east toilet room. remodel of commercial kitchen under sep permit.Details
restaurant ti - new equipment for (e) bar. repair/replace plaster at wall sand ceiling relocate openings at dining room non load bearing interior walls move wall in east toilet room. remodel of commercial kitchen under sep permit. | $48,000 |
| Feb 16, 2024 | Completed final sign-off Aug 2025 | 800 Taraval St | Schrobsdorff Construction | soft demolition to (e) first floor restaurant to locate (e) electrical and plumbing systems. non structural work. replace after investigation. ab-017... vacant space.Details
soft demolition to (e) first floor restaurant to locate (e) electrical and plumbing systems. non structural work. replace after investigation. ab-017... vacant space. | $40,000 |
| Feb 16, 2024 | Completed final sign-off Mar 2025 | 1796 18th St | for compliance with the abe program -abe #201812273494: install power door operators per da-04. adjust door closer operating pressure. install call button - for entrance facing carolina electrical work under sep permitDetails
for compliance with the abe program -abe #201812273494: install power door operators per da-04. adjust door closer operating pressure. install call button - for entrance facing carolina electrical work under sep permit | $18,000 | |
| Oct 13, 2023 | Never finaled issued Oct 2023, no final | 1723 Buchanan St | Huey Const Mngmt Co Inc - Dba M H Const. | accessible business entrance program per ordinnce 51-16: install door with ada hardware and actuator at entry to resturant. install new ramp to entry abe# 201903145523Details
accessible business entrance program per ordinnce 51-16: install door with ada hardware and actuator at entry to resturant. install new ramp to entry abe# 201903145523 | $10,000 |
| Oct 11, 2023 | Expired or cancelled expired Jan 2025 | 150 Eureka St | K 2 Builders Inc | revision to pa# 201912169688, work under construction, west bldg- install 3 windows at west elevation of west bldg.Details
revision to pa# 201912169688, work under construction, west bldg- install 3 windows at west elevation of west bldg. | $1,500 |
| Sep 22, 2023 | Never finaled issued Oct 2023, no final | 429 Gough St | Schrobsdorff Construction | remodel e commercial spaces at 429 gough and 313 ivy st. convert 429 gough st from wine bar use to dispensary use . convert 313 ivy st fromo dispensary use to wine bar use. change of use to m. ref 202003167120.Details
remodel e commercial spaces at 429 gough and 313 ivy st. convert 429 gough st from wine bar use to dispensary use . convert 313 ivy st fromo dispensary use to wine bar use. change of use to m. ref 202003167120. | $4,800 |
| Sep 19, 2023 | Completed final sign-off Oct 2023 | 1651 Ulloa St | N M S Brosnan Construction | revision under construction for permit# 202009275176: realighn family room foyer non-load bearing walls. relocate water heater, furnace and washer/dryer.Details
revision under construction for permit# 202009275176: realighn family room foyer non-load bearing walls. relocate water heater, furnace and washer/dryer. | $1,000 |
| Jul 3, 2023 | Completed final sign-off Jul 2023 | 1233 Connecticut St | to comply w/ dbi internal audit notice of violation 202307723, document sliding patio door and window on 2nd flr balcony.Details
to comply w/ dbi internal audit notice of violation 202307723, document sliding patio door and window on 2nd flr balcony. | ||
| Jul 3, 2023 | Completed final sign-off Jul 2023 | 1251 Connecticut St | to comply w/ dbi internal audit notice of violation 202307724, document sliding patio door and window on 2nd flr balcony.Details
to comply w/ dbi internal audit notice of violation 202307724, document sliding patio door and window on 2nd flr balcony. | ||
| Jul 3, 2023 | Completed final sign-off Jul 2023 | 1261 Connecticut St | to comply w/ dbi internal audit notice of violation 202307676, document sliding patio door and window on 2nd flr balcony.Details
to comply w/ dbi internal audit notice of violation 202307676, document sliding patio door and window on 2nd flr balcony. | ||
| Jun 12, 2023 | Completed final sign-off Sep 2023 | 3420 Balboa St | Jian Construction Company | accessible business entrance program per ordinance 51-16: install power door operator & install beverage work counter. abe 201911128030Details
accessible business entrance program per ordinance 51-16: install power door operator & install beverage work counter. abe 201911128030 | $15,000 |
| Jun 1, 2023 | Completed final sign-off Apr 2024 | 1233 Connecticut St | correction for notice of violations. remove shower and kitchen. remove existing communicating opening on 1st and 2nd fl. complaint 201728253Details
correction for notice of violations. remove shower and kitchen. remove existing communicating opening on 1st and 2nd fl. complaint 201728253 | $3,500 | |
| May 2, 2023 | Completed final sign-off Jan 2024 | 559 06th St | revision to 202012211384. legalize existing opening between building on adjacent propertiesDetails
revision to 202012211384. legalize existing opening between building on adjacent properties | ||
| Apr 21, 2023 | Completed final sign-off Jan 2025 | 150 Eureka St | K 2 Builders Inc | revision to 201912169688 west building. install 1st fl plumbing fixtures and washer and dryer hookups. install range, sink, dishwasher, refrig 2nd fl. replace northeast door with window. install heatpumpsDetails
revision to 201912169688 west building. install 1st fl plumbing fixtures and washer and dryer hookups. install range, sink, dishwasher, refrig 2nd fl. replace northeast door with window. install heatpumps | |
| Apr 19, 2023 | Never finaled issued Apr 2023, no final | 2000 Oakdale Av | Huey Const Mngmt Co Inc - Dba M H Const. | soft demo non bearing partitionsDetails
soft demo non bearing partitions | $30,000 |
| Apr 14, 2023 | Completed final sign-off Nov 2023 | 3231 16th St | Brennan Strong Hold Construction Inc | rev to pa# 201808076659; revise entry and stair to unit # 401, relocate kitchen, revise bathroom and add laundry closetDetails
rev to pa# 201808076659; revise entry and stair to unit # 401, relocate kitchen, revise bathroom and add laundry closet | |
| Mar 29, 2023 | In progress issued Oct 2024 | 539 Goettingen St | to erect 3 stories, no basement, type v-a single family residence.Details
to erect 3 stories, no basement, type v-a single family residence. | $385,000 | |
| Feb 27, 2023 | Completed final sign-off Jun 2024 | 301 West Portal Av | Mullan Enterprises Inc | comply w/nov# 202290124, fire repair, install new 1-hr rated roof w/additional drains, repair parpet to match existing, install 5/8" type x gypsum throughout, patch & repair concrete slab as redq'd, repair dry rot & fire damage as req'd elec & plumb under separate permit.Details
comply w/nov# 202290124, fire repair, install new 1-hr rated roof w/additional drains, repair parpet to match existing, install 5/8" type x gypsum throughout, patch & repair concrete slab as redq'd, repair dry rot & fire damage as req'd elec & plumb under separate permit. | $450,000 |
| Feb 14, 2023 | Never finaled issued Mar 2023, no final | 150 Eureka St | K 2 Builders Inc | unit# 101: revision to work under construction for permit 201912169688, new steel moment frame at ceiling.Details
unit# 101: revision to work under construction for permit 201912169688, new steel moment frame at ceiling. | $5,000 |
| Nov 30, 2022 | Never finaled issued Apr 2023, no final | 755 Pine St | Brennan Strong Hold Construction Inc | unit 4: revision to bpa#202204081863 under construction. replace forced air heating unit.gas in kind same locationDetails
unit 4: revision to bpa#202204081863 under construction. replace forced air heating unit.gas in kind same location | $1,500 |
| Oct 14, 2022 | Completed final sign-off Feb 2023 | 2110 Jennings St | to comply with sffd nov #22090177. remove c02 from nursery. ok to process per eid nov#201850501Details
to comply with sffd nov #22090177. remove c02 from nursery. ok to process per eid nov#201850501 | $1,000 | |
| Oct 12, 2022 | Completed final sign-off Nov 2022 | 2131 41st Av | revise permit #201611142536 description scope of work. remove language third floor bedroom addition" from scope of work. no change to number of stories approvedDetails
revise permit #201611142536 description scope of work. remove language third floor bedroom addition" from scope of work. no change to number of stories approved | ||
| Jun 30, 2022 | Never finaled issued Aug 2022, no final | 551 Goettingen St | revision to permit 202203109668. replace damaged entry stair with new stair to conform with 2019 cbc standards.Details
revision to permit 202203109668. replace damaged entry stair with new stair to conform with 2019 cbc standards. | $4,500 | |
| May 9, 2022 | Completed final sign-off Sep 2022 | 133 Lake St | Mutual Seiko Construction | revision to bpa#202010287617. (e) 2/9 x 6/0 s.h. window to remain (at 3rd floor).Details
revision to bpa#202010287617. (e) 2/9 x 6/0 s.h. window to remain (at 3rd floor). | |
| Mar 23, 2022 | Expired or cancelled withdrawn Jul 2022 | 919 Vallejo St | revision to 202201125870. remodel units 919a and 923, addition of new bathroom and remodel existing kitchens in both units. addition of new bedroom in unit 919a.Details
revision to 202201125870. remodel units 919a and 923, addition of new bathroom and remodel existing kitchens in both units. addition of new bedroom in unit 919a. | ||
| Mar 10, 2022 | Never finaled issued Apr 2022, no final | 551 Goettingen St | replace all extg windows and bedroom windows to comply to cbc 2019 rescue requirements. replace exterior facade material with new cementitious siding. repair rotted front entry stair. add 10'-0" depth deck at rear.rewood siding at west elevation.Details
replace all extg windows and bedroom windows to comply to cbc 2019 rescue requirements. replace exterior facade material with new cementitious siding. repair rotted front entry stair. add 10'-0" depth deck at rear.rewood siding at west elevation. | $45,000 | |
| Mar 1, 2022 | Completed final sign-off Jan 2024 | 521 06th St | revision to pa 2020-1218-1361 existing structural repairs of walls at northeast and north west corners. replace windows visible from streetDetails
revision to pa 2020-1218-1361 existing structural repairs of walls at northeast and north west corners. replace windows visible from street | $40,000 | |
| Feb 24, 2022 | Completed final sign-off Jan 2024 | 521 06th St | new rooftoppackaged heat pump unit and new exhaust fan system with all other required components for proper system functionality. install new lighting. work under t.i permit 202012181361Details
new rooftoppackaged heat pump unit and new exhaust fan system with all other required components for proper system functionality. install new lighting. work under t.i permit 202012181361 | $40,000 | |
| Feb 17, 2022 | Completed final sign-off Jan 2024 | 559 06th St | revision to work under construction pa# 202012211384. exist mezz stair to remain. replace windows, replace storefront, repair awning.Details
revision to work under construction pa# 202012211384. exist mezz stair to remain. replace windows, replace storefront, repair awning. | $25,000 | |
| Feb 3, 2022 | Completed final sign-off Aug 2024 | 1833 11th Av | Mutual Seiko Construction | replace all windows and install new windows . remodle existing exterior facades, repair stucco and siding.Details
replace all windows and install new windows . remodle existing exterior facades, repair stucco and siding. | $35,000 |
| Dec 28, 2021 | Never finaled issued Jan 2022, no final | 551 Goettingen St | revision to pa# 2021-0524-0894; new doors and structuralDetails
revision to pa# 2021-0524-0894; new doors and structural | $30,000 | |
| Oct 7, 2021 | Never finaled issued Oct 2021, no final | 1238 Rankin St | Success Construction ***See Notes*** | rev to pa# 2019-0726-7062; provide detail for wall ceiling connections change 6 3/0x7/0 doors to double leaf (2) 3/0x7/0 eachDetails
rev to pa# 2019-0726-7062; provide detail for wall ceiling connections change 6 3/0x7/0 doors to double leaf (2) 3/0x7/0 each | $5,500 |
| Oct 5, 2021 | Expired or cancelled expired Apr 2024 | 1730 Jackson St | Kerley Construction Inc | rev to pa201810153172 under construction. repair unit deck floors, guard rails and screens at north court.Details
rev to pa201810153172 under construction. repair unit deck floors, guard rails and screens at north court. | $25,000 |
| Aug 2, 2021 | Completed final sign-off Sep 2022 | 1378 20th Av | Rp Construction | rev pa202010287642: replace (e) ti-ii siding at all exposed wall with shear nailed plywood ad hardie plank siding. encase steel frame coumn in non-shrink grout: replace studs and siding at (s) wall and entry.repalce 2/f rim joise and bay window floor joist. repair discovered existing deteriorated...Details
rev pa202010287642: replace (e) ti-ii siding at all exposed wall with shear nailed plywood ad hardie plank siding. encase steel frame coumn in non-shrink grout: replace studs and siding at (s) wall and entry.repalce 2/f rim joise and bay window floor joist. repair discovered existing deteriorated... | $15,000 |
| Jun 11, 2021 | Completed final sign-off Aug 2021 | 4994 Mission St | soft demo to grond level. remove all non-load bvearing partitions. rmeove restroom fixtures, all kitchen equipment, hvac, suspended ceiling. will omply with ab-Details
soft demo to grond level. remove all non-load bvearing partitions. rmeove restroom fixtures, all kitchen equipment, hvac, suspended ceiling. will omply with ab- | $24,000 | |
| May 24, 2021 | Never finaled issued May 2021, no final | 551 Goettingen St | remodel (e) single family: new study, bath laundry room, family room on 1/f. new bedroom, bath, & remodel kitchen on 2/f. remove (e) northside windows and add (2) new skylights.Details
remodel (e) single family: new study, bath laundry room, family room on 1/f. new bedroom, bath, & remodel kitchen on 2/f. remove (e) northside windows and add (2) new skylights. | $85,000 | |
| Mar 31, 2021 | Expired or cancelled cancelled Jan 2026 | 4994 Mission St | remodel & rear horizontal & vertical addition to (e) 1-story commercial bldg. (n) mezzanine @ center of bldg. bldg shell improvements only. interior tenant improvements under separate permit by future tenant. no change of use.Details
remodel & rear horizontal & vertical addition to (e) 1-story commercial bldg. (n) mezzanine @ center of bldg. bldg shell improvements only. interior tenant improvements under separate permit by future tenant. no change of use. | $450,000 | |
| Mar 23, 2021 | Never finaled issued Jan 2022, no final | 2000 Oakdale Av | Huey Const Mngmt Co Inc - Dba M H Const. | (ste a-2): change of use from b to b/m. new cannabis office/ retail space. install new non-bearing partitions.Details
(ste a-2): change of use from b to b/m. new cannabis office/ retail space. install new non-bearing partitions. | $45,000 |
| Mar 23, 2021 | Completed final sign-off Apr 2022 | 3407 Geary Bl | C D R Construction | change of use from r-3/b to r-3/m. new cannabis retail at 1st floor. remodel extg restroom to conform to ada standards.Details
change of use from r-3/b to r-3/m. new cannabis retail at 1st floor. remodel extg restroom to conform to ada standards. | $38,000 |
| Dec 23, 2020 | Never finaled filed Dec 2020, never issued | 2428 Clement St | tenant improvement to an existng 2 sotry commercial building. remodel former restaurant to new cannibis retail spaceDetails
tenant improvement to an existng 2 sotry commercial building. remodel former restaurant to new cannibis retail space | $250,000 | |
| Dec 21, 2020 | Completed final sign-off Jan 2024 | 559 06th St | replace (e) stair to mezzanine. replace restrooms, add shower. replace roll-up door / pedestrian door at morris st. install new storefront windows behind (e) roll-up doors. provide mezzanine guardrails.Details
replace (e) stair to mezzanine. replace restrooms, add shower. replace roll-up door / pedestrian door at morris st. install new storefront windows behind (e) roll-up doors. provide mezzanine guardrails. | $48,000 | |
| Dec 21, 2020 | Never finaled issued Mar 2021, no final | 1238 Rankin St | Success Construction ***See Notes*** | upgrading (e) electrical system for cannibis nursery. approved under pa201907267062.Details
upgrading (e) electrical system for cannibis nursery. approved under pa201907267062. | $75,000 |
| Dec 21, 2020 | Never finaled issued May 2021, no final | 1238 Rankin St | upgrading (e) mechanical system for cannibis nursery. approved under pa201907267062. add co2 system (1578 lbs total) with detection and alarmsDetails
upgrading (e) mechanical system for cannibis nursery. approved under pa201907267062. add co2 system (1578 lbs total) with detection and alarms | $75,000 | |
| Dec 18, 2020 | Completed final sign-off Jan 2024 | 521 06th St | replace existing stair 2 to second floor. replace restrooms. add shower. replace roll up door/pedestrian door. repair windows.Details
replace existing stair 2 to second floor. replace restrooms. add shower. replace roll up door/pedestrian door. repair windows. | $48,000 | |
| Dec 18, 2020 | Never finaled filed Dec 2020, never issued | 2346 Lombard St | tenant improvement to office ground floor commercial office space.Details
tenant improvement to office ground floor commercial office space. | $35,000 | |
| Oct 28, 2020 | Completed final sign-off Sep 2022 | 133 Lake St | Kerley Construction Inc, Mutual Seiko Construction | remodel existing garage and install new garage door. repair dry-rot in eisting stairs at rear. unit #135: remodel bathroom, kitchen, and repair dry rot. replace west & south windows.Details
remodel existing garage and install new garage door. repair dry-rot in eisting stairs at rear. unit #135: remodel bathroom, kitchen, and repair dry rot. replace west & south windows. | $150,000 |
| Oct 28, 2020 | Completed final sign-off Sep 2022 | 1378 20th Av | Rp Construction | replace (e) front windows with paiting milgard alum windows.replace rear & lightwell windows with milgard tuscany windows.install new hardi-plank siding over north/east/west/south ext walls.install new cement plaster at 1/f base at street facade. repair dryrot at foundation.Details
replace (e) front windows with paiting milgard alum windows.replace rear & lightwell windows with milgard tuscany windows.install new hardi-plank siding over north/east/west/south ext walls.install new cement plaster at 1/f base at street facade. repair dryrot at foundation. | $100,000 |
| Sep 3, 2020 | Expired or cancelled withdrawn Jul 2021 | 551 Goettingen St | new (2) adu's per ordinance 162-16 in a 3 story addition to the rear of a single family residence. in accordance to an approved permit (#2020-01-17-2227) voluntary seismic upgrade per ab-094, 2019 cbbc appendix a4.Details
new (2) adu's per ordinance 162-16 in a 3 story addition to the rear of a single family residence. in accordance to an approved permit (#2020-01-17-2227) voluntary seismic upgrade per ab-094, 2019 cbbc appendix a4. | $385,000 | |
| Aug 15, 2020 | Expired or cancelled withdrawn Oct 2023 | 150 Eureka St | in existing west building, install three (n) adu town houses in existing two story storage building.Details
in existing west building, install three (n) adu town houses in existing two story storage building. | $400,000 | |
| Mar 10, 2020 | Expired or cancelled expired Apr 2024 | 1730 Jackson St | Kerley Construction Inc | rev 201810153172; under construction replace residential unit windows and patio and deck doorsDetails
rev 201810153172; under construction replace residential unit windows and patio and deck doors | $75,000 |
| Feb 19, 2020 | Expired or cancelled expired May 2026 | 15 Duboce Av | Wei Dang Builders Inc. | change of use fro s1/b to f-1/b. install new non load bearing partition for this space. install 2 new ada restroomDetails
change of use fro s1/b to f-1/b. install new non load bearing partition for this space. install 2 new ada restroom | $20,000 |
| Jan 17, 2020 | Completed final sign-off Jun 2022 | 559 06th St | soft demolition to gr fl and mezzanine. demolish non bearing partitions. remove restroom fixtures. comply with ab017. maher not reqDetails
soft demolition to gr fl and mezzanine. demolish non bearing partitions. remove restroom fixtures. comply with ab017. maher not req | $5,000 | |
| Jan 17, 2020 | Completed final sign-off Jun 2022 | 525 06th St | soft demolition to ground and 2nd fl. demolish non bearing partitions. remove restroom fixtures. comply with ab-017Details
soft demolition to ground and 2nd fl. demolish non bearing partitions. remove restroom fixtures. comply with ab-017 | $5,000 | |
| Dec 16, 2019 | Completed final sign-off Jan 2025 | 150 Eureka St | K 2 Builders Inc | convert (e) 2-story church building into (4) residential condominium units. add (2) stories to (e) building. (3) storage area @ rear in (e) building.Details
convert (e) 2-story church building into (4) residential condominium units. add (2) stories to (e) building. (3) storage area @ rear in (e) building. | $1,750,000 |
| Oct 11, 2019 | Completed final sign-off Oct 2020 | 1721 Buchanan St | Huey Const Mngmt Co Inc - Dba M H Const. | replace windows in living room, provide new egress windows in bedrooms. interior remodel on separate permitDetails
replace windows in living room, provide new egress windows in bedrooms. interior remodel on separate permit | $45,000 |
| Sep 24, 2019 | Completed final sign-off Sep 2020 | 76 Moss St | Brennan Strong Hold Construction Inc | install new private roof deck and stair accessDetails
install new private roof deck and stair access | $35,000 |
| Aug 29, 2019 | Never finaled issued Mar 2022, no final | 3637 Sacramento St | O'toole Construction Inc., Canche Construction Inc | erect a 18 dwelling,4 story with 2 basements medical office, residential and retail building with parking, type 5-aDetails
erect a 18 dwelling,4 story with 2 basements medical office, residential and retail building with parking, type 5-a | $5,500,000 |
| Aug 29, 2019 | Completed final sign-off Oct 2025 | 3657 Sacramento St | O'toole Construction Inc. | demolish 1-story parking garageDetails
demolish 1-story parking garage | $150,000 |
| Aug 29, 2019 | Completed final sign-off Oct 2025 | 3641 Sacramento St | O'toole Construction Inc. | demolish 3-story medical officesDetails
demolish 3-story medical offices | $100,000 |
| Aug 29, 2019 | Completed final sign-off Oct 2025 | 3637 Sacramento St | O'toole Construction Inc. | demolish 2-story medical officeDetails
demolish 2-story medical office | $100,000 |
| Aug 9, 2019 | Completed final sign-off Feb 2021 | 1500 Wallace Av | revision to work under construction app#201811145786. fill in opening at northwest exterior wall. n/a for maherDetails
revision to work under construction app#201811145786. fill in opening at northwest exterior wall. n/a for maher | $2,500 | |
| Aug 8, 2019 | Completed final sign-off Sep 2020 | 76 Moss St | Brennan Strong Hold Construction Inc | remove (e) toilet and install new ada toilet room on 1st fl., provide 2 hr wall separtation between (e) f-1 workshop and (e) r-3 residential, remodel (e) 2 residential units, voluntary seismic upgrade workDetails
remove (e) toilet and install new ada toilet room on 1st fl., provide 2 hr wall separtation between (e) f-1 workshop and (e) r-3 residential, remodel (e) 2 residential units, voluntary seismic upgrade work | $90,000 |
| Jul 26, 2019 | Never finaled issued Oct 2019, no final | 1238 Rankin St | Huey Const Mngmt Co Inc - Dba M H Const. | change of use from s-1 / b to f-1. install new non-bearing partitions for this space. install 1 new ada restroom. change of use from storage to industrial agriculture.Details
change of use from s-1 / b to f-1. install new non-bearing partitions for this space. install 1 new ada restroom. change of use from storage to industrial agriculture. | $60,000 |
| Jul 22, 2019 | Never finaled issued Jul 2019, no final | 2000 Oakdale Av | Huey Const Mngmt Co Inc - Dba M H Const. | install new 1 hour non bearing partition and doors with new roll up metal doorDetails
install new 1 hour non bearing partition and doors with new roll up metal door | $3,000 |