Block 0272, lot 019
755 Pine St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 6,660 sq ft
- Lot
- 2,739 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 26, 2026 | Completed final sign-off Jul 2026 | 755 Pine St | Brennan Strong Hold Construction Inc | unit #6: replace kitchen cabinets, sink and appliances. replace bathroom toilet and sink. new flooring.Details
unit #6: replace kitchen cabinets, sink and appliances. replace bathroom toilet and sink. new flooring. | $25,000 |
| Nov 13, 2023 | Completed final sign-off Jan 2024 | 755 Pine St | G R C Roofing Inc. | reroofingDetails
reroofing | $33,000 |
| Aug 22, 2023 | Completed final sign-off Oct 2023 | 755 Pine St | San Francisco Fire Protection | verify sound levels in sleeping areas to comply with sffc 1103.7.6.1. indicating the dba is at least 75 dba.Details
verify sound levels in sleeping areas to comply with sffc 1103.7.6.1. indicating the dba is at least 75 dba. | |
| Nov 30, 2022 | Never finaled issued Apr 2023, no final | 755 Pine St | Brennan Strong Hold Construction Inc | unit 4: revision to bpa#202204081863 under construction. replace forced air heating unit.gas in kind same locationDetails
unit 4: revision to bpa#202204081863 under construction. replace forced air heating unit.gas in kind same location | $1,500 |
| Apr 8, 2022 | Never finaled issued Apr 2022, no final | 755 Pine St | apt 4: replace kitchen cabinets, counter, sink in kind and same location. replace bathroom toilet, tub, and sink in kind and same location. paint unit and refinish floorsDetails
apt 4: replace kitchen cabinets, counter, sink in kind and same location. replace bathroom toilet, tub, and sink in kind and same location. paint unit and refinish floors | $18,000 | |
| Feb 4, 2020 | Completed final sign-off Mar 2021 | 755 Pine St | San Francisco Fire Protection | like for like 2021 mandate installation of fire alarm system in [non]sprinklered building. replace an existing facu with new ifp-75, pull station and smoke detectors. new power supply, monitor modules and lf horns.Details
like for like 2021 mandate installation of fire alarm system in [non]sprinklered building. replace an existing facu with new ifp-75, pull station and smoke detectors. new power supply, monitor modules and lf horns. | $20,275 |
| Dec 2, 2014 | Never finaled issued Dec 2014, no final | 755 Pine St | street spaceDetails
street space | ||
| Oct 23, 2014 | Never finaled issued Oct 2014, no final | 755 Pine St | street spaceDetails
street space | ||
| Oct 6, 2014 | Never finaled issued Oct 2014, no final | 755 Pine St | street space permitDetails
street space permit | ||
| Aug 18, 2014 | Never finaled issued Aug 2014, no final | 755 Pine St | street spaceDetails
street space | ||
| Jul 2, 2014 | Never finaled issued Jul 2014, no final | 755 Pine St | street spaceDetails
street space | ||
| May 29, 2014 | Never finaled issued May 2014, no final | 755 Pine St | street spaceDetails
street space | ||
| Mar 31, 2014 | Never finaled issued Mar 2014, no final | 755 Pine St | street space permitDetails
street space permit | ||
| Jul 19, 2013 | Completed final sign-off Dec 2014 | 755 Pine St | units #1/5/6-remodel kitchen & bathroom, install new forced air heating. repair windowsDetails
units #1/5/6-remodel kitchen & bathroom, install new forced air heating. repair windows | $9,000 | |
| May 20, 2011 | Never finaled issued May 2011, no final | 755 Pine St | Kerley Construction Inc | #1: repair dry rot and termite damage in the bathroom and ktichen floor and walls.Details
#1: repair dry rot and termite damage in the bathroom and ktichen floor and walls. | $500 |
| May 17, 2011 | Never finaled issued May 2011, no final | 755 Pine St | street space permitDetails
street space permit | ||
| Mar 1, 2010 | Never finaled issued Mar 2010, no final | 755 Pine St | street space permitDetails
street space permit | ||
| Jan 31, 2007 | Never finaled issued Jan 2007, no final | 755 Pine St | street spaceDetails
street space | ||
| Sep 28, 2005 | Never finaled issued Sep 2005, no final | 755 Pine St | street space permit/sidewalk repairDetails
street space permit/sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Brennan Strong Hold Construction Inc (2), San Francisco Fire Protection (2), G R C Roofing Inc., Kerley Construction Inc
- Architects
- Gary Gee
- Pmt consultant/expediters
- Gary Gee
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.