Eugene Ye
- License
- 96892
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, authorized agent-others, engineer, subcontractor
- Firm
- Eyestruc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2025 to Nov 2026
22 permits since 2000 (engineer on 19 permits, architect on 1 permit, authorized agent-others on 1 permit, subcontractor on 1 permit): 10 completed, 12 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Kwong Associates (5), Kelun Construction (4), L R T Construction (2), Bmj Construction, Buildcorp Inc, C Plus E Construction Inc, C T W Mechanical, J C General Construction, Tianda Construction Inc, Wan Li Construction Co
- Lessees
- Sweet Citrus Llc
Where they worked
- Single-family 13
- Multi-family (2-family, apartments) 6
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2026 | In progress issued Nov 2026 | 1117 Kirkham St | Kwong Associates | in-fill lightwell along western property line against a blind wall. ref#: 202510217809.Details
in-fill lightwell along western property line against a blind wall. ref#: 202510217809. | $18,000 |
| Oct 13, 2026 | In progress issued Oct 2026 | 2587 22nd Av | Tianda Construction Inc | 1)at 2nd fl: a)convert (e) kitchen to bathroom and move kitchen to dining room. b) add new office & reconfigure (e) bathroom & stair. 2) at 1st fl: a)convert (e) study room & game room to bedrooms with one bathroom. b)relocate (e) bathroom. not subject to ab-112Details
1)at 2nd fl: a)convert (e) kitchen to bathroom and move kitchen to dining room. b) add new office & reconfigure (e) bathroom & stair. 2) at 1st fl: a)convert (e) study room & game room to bedrooms with one bathroom. b)relocate (e) bathroom. not subject to ab-112 | $180,000 |
| Oct 2, 2026 | In progress issued Oct 2026 | 1043 Stockton St | C T W Mechanical | dry rot remediation at tenant space @ 1st fl. per inspector correction notice. remove dry rotted subfloor, (n) concrete cap for brick foundation, remove & replace dry rotted stubs.Details
dry rot remediation at tenant space @ 1st fl. per inspector correction notice. remove dry rotted subfloor, (n) concrete cap for brick foundation, remove & replace dry rotted stubs. | $25,000 |
| Aug 21, 2026 | In progress filed Aug 2026, not yet issued | 1634 York St | 1) structural repair and strenghthen at 1st flr only. 2) remove and replace (e) beam and post at 1st flr. 3) strenghthening (e) floor joist/remove and replace ceiling joist at 1st flr ceiling. 4) add shear walls on 1st flr.Details
1) structural repair and strenghthen at 1st flr only. 2) remove and replace (e) beam and post at 1st flr. 3) strenghthening (e) floor joist/remove and replace ceiling joist at 1st flr ceiling. 4) add shear walls on 1st flr. | $20,000 | |
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 583 22nd Av | 1st floor: relocate water heater and furnance to garage and add new bedroom. 2nd floor: add (n) closet & bath to master bedroom, remove wall between bedroom & office, remove wall between kitchrn & living room. remove exterior lightwell staircase.Details
1st floor: relocate water heater and furnance to garage and add new bedroom. 2nd floor: add (n) closet & bath to master bedroom, remove wall between bedroom & office, remove wall between kitchrn & living room. remove exterior lightwell staircase. | $120,000 | |
| Jul 9, 2026 | In progress filed Jul 2026, not yet issued | 715 Mount Vernon Av | comply w/ nov202546867 and add new adu under state program,propose (n) media room, family roo, (2) new bathrooms and laundry room on 1st floor. no work to be done on 2nd floor under this permit legalize as-built rear staircaseDetails
comply w/ nov202546867 and add new adu under state program,propose (n) media room, family roo, (2) new bathrooms and laundry room on 1st floor. no work to be done on 2nd floor under this permit legalize as-built rear staircase | $20,000 | |
| Jun 4, 2026 | In progress filed Jun 2026, not yet issued | 1529 Mason St | Wan Li Construction Co | add 2 bedroom, 1 bathroom adu under state adu program at (e) ground floor.Details
add 2 bedroom, 1 bathroom adu under state adu program at (e) ground floor. | $150,000 |
| Jun 3, 2026 | In progress issued Sep 2026 | 1342 21st Av | Kelun Construction | convert (e) bedroom & bathroom on 1/f to new adu under state adu program. no changes to elevation & ceiling heights.Details
convert (e) bedroom & bathroom on 1/f to new adu under state adu program. no changes to elevation & ceiling heights. | $20,000 |
| May 22, 2026 | Completed final sign-off Aug 2026 | 231 Evelyn Wy | Bmj Construction | 1st fl legalize as built office, family room and bathroom. 2nd fl legalize as built powder roomDetails
1st fl legalize as built office, family room and bathroom. 2nd fl legalize as built powder room | $10,000 |
| Dec 17, 2025 | Completed final sign-off Sep 2026 | 137 Arleta Av | relocate water heater from basement to garage. relocate bathroom and bedroom, remodel kitchen and dining roon on 1st fl. add new bathroom and closet on 2nd fl. replace window in-kind.Details
relocate water heater from basement to garage. relocate bathroom and bedroom, remodel kitchen and dining roon on 1st fl. add new bathroom and closet on 2nd fl. replace window in-kind. | $80,000 | |
| Nov 7, 2025 | Completed final sign-off Jan 2026 | 1200 Girard St | Buildcorp Inc | comply with nov 202544722. reduce as built rear yard fence height to 10" max. height above grade.Details
comply with nov 202544722. reduce as built rear yard fence height to 10" max. height above grade. | $20,000 |
| Nov 4, 2025 | Completed final sign-off Mar 2026 | 57 Cayuga Av | Kelun Construction | revision to 202506118400, relocate water heater to crawl space and furnace to atticDetails
revision to 202506118400, relocate water heater to crawl space and furnace to attic | |
| Oct 31, 2025 | Completed final sign-off Jul 2026 | 2419 16th Av | L R T Construction | revision 202507019891. add 3 flush mount skylights.Details
revision 202507019891. add 3 flush mount skylights. | |
| Oct 21, 2025 | In progress issued Oct 2025 | 1117 Kirkham St | Kwong Associates | work on 1117 kirkham only: remodel kitchen and 2nd floor bathroom. alter 3rd floor full bathroom and add laundry. remove lath and plaster, install insulation and new drywall. new electrical wiring throughout. new plumbing in kitchen and bathroom. lightwell infill on seperate permit.Details
work on 1117 kirkham only: remodel kitchen and 2nd floor bathroom. alter 3rd floor full bathroom and add laundry. remove lath and plaster, install insulation and new drywall. new electrical wiring throughout. new plumbing in kitchen and bathroom. lightwell infill on seperate permit. | $110,000 |
| Oct 2, 2025 | Completed final sign-off Oct 2025 | 1126 Shafter Av | Kwong Associates | ref pa# 2023-0616-0244. to completely comply with nov #202297757, 202307656 & 202307654, & planning nov 2023-004191enf. remove all unpermitted work related to proposed cannabic grow. legalizing remaining restroom & commerical storageDetails
ref pa# 2023-0616-0244. to completely comply with nov #202297757, 202307656 & 202307654, & planning nov 2023-004191enf. remove all unpermitted work related to proposed cannabic grow. legalizing remaining restroom & commerical storage | $12,000 |
| Sep 18, 2025 | In progress issued Nov 2025 | 547 Taraval St | J C General Construction | prop h: commercial ti, improve (e) tenant space to (n) juice bar.Details
prop h: commercial ti, improve (e) tenant space to (n) juice bar. | $80,000 |
| Jul 1, 2025 | Completed final sign-off Jul 2026 | 2419 16th Av | L R T Construction | relocate unit 2421 to 1st fl & add kitchen, bathroom, closet & laundry at 1st fl. expand unit 2419 on 2nd fl & add 2 bedrooms, 1 master bath, 1 master closet & 1 laundry. add new rear deck to rear yard for unit 2419 on 2nd fl.Details
relocate unit 2421 to 1st fl & add kitchen, bathroom, closet & laundry at 1st fl. expand unit 2419 on 2nd fl & add 2 bedrooms, 1 master bath, 1 master closet & 1 laundry. add new rear deck to rear yard for unit 2419 on 2nd fl. | $200,000 |
| Jun 27, 2025 | Completed final sign-off Nov 2025 | 715 Mount Vernon Av | revision to permit 202406053777 and to comply with nov 202535626. replace front windows and rebuild front staircase. add new staircase at front retaining wall to provide egress for 1/f.Details
revision to permit 202406053777 and to comply with nov 202535626. replace front windows and rebuild front staircase. add new staircase at front retaining wall to provide egress for 1/f. | $5,000 | |
| Jun 11, 2025 | Completed final sign-off Mar 2026 | 57 Cayuga Av | Kelun Construction | remodel (e) kitchen, remove (e) storage and add new bathroom on 2nd fl, add (3) skylightsDetails
remodel (e) kitchen, remove (e) storage and add new bathroom on 2nd fl, add (3) skylights | $75,000 |
| Apr 29, 2025 | In progress issued Apr 2025 | 2258 33rd Av | Kwong Associates | 1/f: legalize bedroom and bathroom. 2/f: add full bathroom. water damaged repair.Details
1/f: legalize bedroom and bathroom. 2/f: add full bathroom. water damaged repair. | $75,000 |
| Apr 22, 2025 | In progress issued Jul 2025 | 3175 Cesar Chavez St | Kwong Associates | remodel home, rewire entire home, new plumbing. add a full bathroom, alter walls, structural reinforcement. fire damage repair. new office, laundry & wetbar on 1st flDetails
remodel home, rewire entire home, new plumbing. add a full bathroom, alter walls, structural reinforcement. fire damage repair. new office, laundry & wetbar on 1st fl | $250,000 |
| Apr 17, 2025 | Completed final sign-off Sep 2026 | 975 Darien Wy | Kelun Construction, C Plus E Construction Inc | add (n) rear deck, 2 bedrooms, bathroom & laundry room on 1/f. relocate interior staircase & kitchen on 2/f. add (n) master bathrooms & closets on 2/f.Details
add (n) rear deck, 2 bedrooms, bathroom & laundry room on 1/f. relocate interior staircase & kitchen on 2/f. add (n) master bathrooms & closets on 2/f. | $200,000 |