Eugene Catania
- Listed as
- contractor, designer
- Firm
- Gene Catania Construction
- Based in
- Concord
- On San Francisco permits
- Aug 2013 to Sep 2026
33 permits since 2000 (contractor on 33 permits, designer on 1 permit): 21 completed, 5 in progress, 6 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 10 Pope St | Gene Catania Construction | comply w/ nov #202427011 item #2: revision to 202501289213. change windows, vinyl frame single hungDetails
comply w/ nov #202427011 item #2: revision to 202501289213. change windows, vinyl frame single hung | $3,000 |
| Feb 10, 2026 | In progress issued Aug 2026 | 10 Pope St | Gene Catania Construction | to obtain final inspection for work approved under pa# 202501289213. all work is complete.Details
to obtain final inspection for work approved under pa# 202501289213. all work is complete. | |
| Oct 14, 2025 | Completed final sign-off Jun 2026 | 2354 21st Av | Gene Catania Construction | revision to permit 202509266234: remove siding front, side and back, replace dryrot framing in-kind. street visible.Details
revision to permit 202509266234: remove siding front, side and back, replace dryrot framing in-kind. street visible. | $10,000 |
| Sep 26, 2025 | Completed final sign-off Jun 2026 | 2354 21st Av | Gene Catania Construction | remove existing siding; verify where the leaks are; repair leak, dry rot if necessary; replace siding; not visible from the street, in kind replacement.Details
remove existing siding; verify where the leaks are; repair leak, dry rot if necessary; replace siding; not visible from the street, in kind replacement. | $3,000 |
| Feb 19, 2025 | Completed final sign-off May 2025 | 6 Pope St | Gene Catania Construction | remove shower tub and reinstall new insert/repair sheet rock, patch outside wall. work to be done in unit #1Details
remove shower tub and reinstall new insert/repair sheet rock, patch outside wall. work to be done in unit #1 | $100 |
| Jan 13, 2025 | In progress issued Sep 2025 | 883 Sutter St | Gene Catania Construction | to comply w/ violation 202429471, 2 bathrooms remodel. to comply w/ violation 202427284. replace dryrot, joist w/ like kind. 1 is a new bathroom, 1 is finish frame wall/drywall remodel. mep deferred.Details
to comply w/ violation 202429471, 2 bathrooms remodel. to comply w/ violation 202427284. replace dryrot, joist w/ like kind. 1 is a new bathroom, 1 is finish frame wall/drywall remodel. mep deferred. | $5,000 |
| Dec 31, 2024 | In progress issued Jan 2025 | 883 Sutter St | Gene Catania Construction | reroof for flat roof. torch downDetails
reroof for flat roof. torch down | $12,000 |
| Dec 13, 2024 | Completed final sign-off Apr 2025 | 21 Chancery Ln | Gene Catania Construction | remove and replace dry rot in front of building. all work in kind.Details
remove and replace dry rot in front of building. all work in kind. | $3,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 1663 Oakdale Av | Gene Catania Construction | re-roofing (asphat shingle)Details
re-roofing (asphat shingle) | $12,000 |
| Aug 1, 2023 | Completed final sign-off Aug 2023 | 261 Silver Av | Gene Catania Construction | bath added 2nd fl."as built". relocation wet bar added. reconfigure deck and walls. railing extention up to 42" in height to remain open and transparent. administrative: as builtDetails
bath added 2nd fl."as built". relocation wet bar added. reconfigure deck and walls. railing extention up to 42" in height to remain open and transparent. administrative: as built | $500 |
| May 1, 2023 | Completed final sign-off Jul 2023 | 1374 Revere Av | Gene Catania Construction | remove (e) siding/replace w/ new siding.Details
remove (e) siding/replace w/ new siding. | $2,000 |
| Dec 20, 2022 | Never finaled issued Dec 2022, no final | 261 Silver Av | Gene Catania Construction | to comply with complaint # 202299735: remodel existing 1 kitchen and 2 bathrooms on 2nd floor. no structural changes. no alterattion of wall, window or door.Details
to comply with complaint # 202299735: remodel existing 1 kitchen and 2 bathrooms on 2nd floor. no structural changes. no alterattion of wall, window or door. | $20,000 |
| Sep 12, 2022 | Completed final sign-off Oct 2022 | 516 Green St | Gene Catania Construction | renovation of e restaurant, new floor sink, grease trap, power door opener to provide compliance. paint existing type 1 hood. (e) kitchen equipment to remainDetails
renovation of e restaurant, new floor sink, grease trap, power door opener to provide compliance. paint existing type 1 hood. (e) kitchen equipment to remain | $25,000 |
| Aug 8, 2022 | Completed final sign-off Dec 2022 | 2386 15th Av | Gene Catania Construction | tenant t.i. expand exisiting deli less than 4000 sq ft. addition of exhaust hood and prep space.Details
tenant t.i. expand exisiting deli less than 4000 sq ft. addition of exhaust hood and prep space. | $45,000 |
| Jul 14, 2022 | Completed final sign-off Oct 2022 | 1400 California St | Gene Catania Construction | new kitchen to replace removed euipment from prior operation. finishes (paint and floor repair) to be addressed. restroom and bar rehabilitation work to provide compliant access. abe 201812313607Details
new kitchen to replace removed euipment from prior operation. finishes (paint and floor repair) to be addressed. restroom and bar rehabilitation work to provide compliant access. abe 201812313607 | $10,000 |
| Mar 29, 2022 | Never finaled issued Mar 2022, no final | 3388 19th St | Gene Catania Construction | to renew bpa#201401156396. all work complete, for final inspectionDetails
to renew bpa#201401156396. all work complete, for final inspection | |
| Dec 7, 2021 | Completed final sign-off Feb 2023 | 2279 Mission St | Gene Catania Construction | change of use to restaurant (b occupancy). interior remodel to accomodate full service restaurant. commercial kitchen, modification to restrooms.Details
change of use to restaurant (b occupancy). interior remodel to accomodate full service restaurant. commercial kitchen, modification to restrooms. | $50,000 |
| Oct 19, 2020 | Completed final sign-off Dec 2020 | 3935 Mission St | Gene Catania Construction | 1) remove and replace exterior siding and existing stucco and replace inkind, 2) install sheeting 3) replace stucco siding to be replaced with stuccoDetails
1) remove and replace exterior siding and existing stucco and replace inkind, 2) install sheeting 3) replace stucco siding to be replaced with stucco | $12,000 |
| Dec 3, 2019 | Never finaled issued Dec 2019, no final | 579 Columbus Av | Gene Catania Construction | remove ounter and rebuild framing, move (1) floor sink and (1) new drain, water supply for sink, install outlet for coffee machine, change light fixtures onlyDetails
remove ounter and rebuild framing, move (1) floor sink and (1) new drain, water supply for sink, install outlet for coffee machine, change light fixtures only | $5,000 |
| Jun 17, 2019 | Expired or cancelled expired May 2022 | 3388 19th St | Gene Catania Construction | to obtain final inspection for work approved under pa # 201401156396. all work is complete.Details
to obtain final inspection for work approved under pa # 201401156396. all work is complete. | |
| Feb 5, 2019 | Completed final sign-off Jul 2019 | 516 Green St | Gene Catania Construction | abatement of violation 2015-004865enf cont approx 10'-6" of non bearing/non rated partitionDetails
abatement of violation 2015-004865enf cont approx 10'-6" of non bearing/non rated partition | $1,200 |
| Dec 7, 2018 | Never finaled issued Dec 2018, no final | 3387 22nd St | Gene Catania Construction | kitchen relocation and interior work in unit 3387 bathroom fixture replacementDetails
kitchen relocation and interior work in unit 3387 bathroom fixture replacement | $125,000 |
| Sep 7, 2018 | Completed final sign-off Dec 2018 | 2500 Ortega St | Gene Catania Construction | remove damaged stucco on wall, replace with lath 3 coats system, repair stucco in-kind.Details
remove damaged stucco on wall, replace with lath 3 coats system, repair stucco in-kind. | $2,000 |
| Aug 6, 2018 | Completed final sign-off Nov 2018 | 75 Dore St | Gene Catania Construction | construct storage rooms in garage areaDetails
construct storage rooms in garage area | $1,500 |
| Mar 14, 2018 | Completed final sign-off Jun 2018 | 210 Jones St | Gene Catania Construction | revision 201503100374 - pipe insulation at (e) restrooms, removal of basement scope, added floor sinks, floor sink penetration detail, well modifications, water heater and platformDetails
revision 201503100374 - pipe insulation at (e) restrooms, removal of basement scope, added floor sinks, floor sink penetration detail, well modifications, water heater and platform | |
| Jul 28, 2017 | Completed final sign-off Aug 2017 | 882 Sutter St | Gene Catania Construction | install project sign "chisme" n/a maherDetails
install project sign "chisme" n/a maher | $500 |
| Jul 7, 2017 | Completed final sign-off Jan 2018 | 1535 21st Av | Gene Catania Construction | comply with nov #201757241 elec work legalization. legalize rooms down construction for media rm, bedroom with closet, full bath, 2 storage rooms in garage areaDetails
comply with nov #201757241 elec work legalization. legalize rooms down construction for media rm, bedroom with closet, full bath, 2 storage rooms in garage area | $30,000 |
| Aug 31, 2016 | Completed final sign-off Aug 2017 | 882 Sutter St | Gene Catania Construction | comply with nov 201621983 to increase in scope of work: reference pa# 2013-0117-8226, walk in cooler installation kitchen area increase in floor area. maher naDetails
comply with nov 201621983 to increase in scope of work: reference pa# 2013-0117-8226, walk in cooler installation kitchen area increase in floor area. maher na | $10,000 |
| Feb 24, 2016 | Completed final sign-off Jul 2016 | 1160 04th St | Gene Catania Construction | install non-load bearing wall partitions for new tenant. mep to be installed under seperate permit. n/a maher ord 155-13Details
install non-load bearing wall partitions for new tenant. mep to be installed under seperate permit. n/a maher ord 155-13 | $15,000 |
| Aug 6, 2015 | Never finaled issued Aug 2015, no final | 220 Pierce St | Gene Catania Construction | replace bathroom ceiling fans (no lighting change) replace dry-rotted siding and window sills approx 2,500 sq. ft. of siding, plus window work.Details
replace bathroom ceiling fans (no lighting change) replace dry-rotted siding and window sills approx 2,500 sq. ft. of siding, plus window work. | $5,000 |
| Mar 10, 2015 | Completed final sign-off Jun 2018 | 210 Jones St | Gene Catania Construction | change ownership to (e) restaurant - cafe equipment & finishes update in 1st floor. alteration of kitchen partition & countertop, type 1 exhaust hood. n/a maher ordinanceDetails
change ownership to (e) restaurant - cafe equipment & finishes update in 1st floor. alteration of kitchen partition & countertop, type 1 exhaust hood. n/a maher ordinance | $137,000 |
| Feb 10, 2014 | Completed final sign-off Feb 2016 | 901 Divisadero St | Gene Catania Construction | construct new ada single accommodation bathroom construct new elevated sales display area with ada ramp. construct new sales transaction counter and storeroomDetails
construct new ada single accommodation bathroom construct new elevated sales display area with ada ramp. construct new sales transaction counter and storeroom | $22,000 |
| Aug 20, 2013 | Never finaled issued Sep 2013, no final | 1604 Mcallister St | Gene Catania Construction | barrier removal, add 1 new bathroom at store on ground levelDetails
barrier removal, add 1 new bathroom at store on ground level | $7,000 |