Block 8711, lot 014
251 Channel St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
56 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 1, 2021 | Completed final sign-off Jun 2025 | 1180 04th St | Cisco Fire Sprinklers, Inc. | install sprinkler drops for all add on rooms in building t.i.Details
install sprinkler drops for all add on rooms in building t.i. | $16,000 |
| Sep 26, 2020 | Completed final sign-off Feb 2022 | 1110 04th St | Bay Area Builders Inc. | ground flr pet care facility t.i. new partitions, ceiling, lighting, mep, accessible restrooms and finishes.Details
ground flr pet care facility t.i. new partitions, ceiling, lighting, mep, accessible restrooms and finishes. | $350,000 |
| May 20, 2020 | Never finaled issued May 2020, no final | 1180 04th St | street spaceDetails
street space | ||
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 610 Long Bridge St | Thomas Swan Sign Co Inc | install 2 non-illuminated double-faced projecting blade signs "cafe reveille"Details
install 2 non-illuminated double-faced projecting blade signs "cafe reveille" | $5,000 |
| Oct 3, 2017 | Completed final sign-off Aug 2018 | 1180 04th St | Faragon Restoration Ltd | 13 units and 4 common hallways: drywall repair, painting/texture, taping, baseboard install, remove and replace acoustic ceiling tile, floor install, replace damaged door casing, insulation install, repair damaged wallsDetails
13 units and 4 common hallways: drywall repair, painting/texture, taping, baseboard install, remove and replace acoustic ceiling tile, floor install, replace damaged door casing, insulation install, repair damaged walls | $73,000 |
| Jul 18, 2017 | Completed final sign-off Aug 2017 | 1120 04th St | International Fire Equip | #f & #g - install ul300 fire system. t.i. pa#201610311544. n/a ordinance #155-13Details
#f & #g - install ul300 fire system. t.i. pa#201610311544. n/a ordinance #155-13 | $6,000 |
| Jul 5, 2017 | Completed final sign-off Aug 2018 | 1180 04th St | Faragon Restoration Ltd | replace of sheetrock, drywall, insulation, kitchen cabinets, light covers, painting, floor covering in 3 unit (413, 312, 210).Details
replace of sheetrock, drywall, insulation, kitchen cabinets, light covers, painting, floor covering in 3 unit (413, 312, 210). | $59,920 |
| Jun 14, 2017 | Expired or cancelled cancelled Jan 2026 | 1170 04th St | painted sign on window "casey's pizza"Details
painted sign on window "casey's pizza" | $1,000 | |
| May 16, 2017 | Completed final sign-off Sep 2017 | 1120 04th St | Siemens Industry, Inc. | fire alarm work for tadu suite g and f. remodel on floor 1 additions are 1 smoke detector, 1 module, 1 horn/strobe power supply, 4 horn strobes, 2 strobes ref 201610311544. n/a for maher.Details
fire alarm work for tadu suite g and f. remodel on floor 1 additions are 1 smoke detector, 1 module, 1 horn/strobe power supply, 4 horn strobes, 2 strobes ref 201610311544. n/a for maher. | $6,320 |
| Apr 24, 2017 | Completed final sign-off Jul 2017 | 1170 04th St | Hao Qiang Construction | install 6 new head under new drop ceiling per nfpa#13. ref t.i. # 201611152686 n/a for maherDetails
install 6 new head under new drop ceiling per nfpa#13. ref t.i. # 201611152686 n/a for maher | $3,950 |
| Apr 24, 2017 | Completed final sign-off Dec 2017 | 1120 04th St | Golden Bay Construction | revision to app#201610311544. new soffit ceiling in dining area, new mech room above restrooms. n/a maherDetails
revision to app#201610311544. new soffit ceiling in dining area, new mech room above restrooms. n/a maher | |
| Apr 20, 2017 | Never finaled issued May 2017, no final | 1170 04th St | Encore Graphics Inc | to erect an electrical sign with projected box and illuminated vinyl lettering with an led tube light. n/a maherDetails
to erect an electrical sign with projected box and illuminated vinyl lettering with an led tube light. n/a maher | $1,500 |
| Apr 12, 2017 | Completed final sign-off Aug 2017 | 1120 04th St | Plumbworks Inc. /Chris Goodwin Plumbing | #g & f- fire sprinkler per nfpa 13, add 6 heads for t.i., arch. pa#201610311544. n/a ordinance #155-13Details
#g & f- fire sprinkler per nfpa 13, add 6 heads for t.i., arch. pa#201610311544. n/a ordinance #155-13 | $4,500 |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 1170 04th St | street spaceDetails
street space | ||
| Mar 16, 2017 | Never finaled issued Mar 2017, no final | 1120 04th St | reroofingDetails
reroofing | ||
| Jan 17, 2017 | Completed final sign-off Jan 2017 | 1150 04th St | Chl Construction Company | revision to 201603303460 to add automatic ada opener per inspectors requestDetails
revision to 201603303460 to add automatic ada opener per inspectors request | |
| Nov 28, 2016 | Completed final sign-off Jan 2017 | 1150 04th St | Red Hawk Fire & Security Ca Llc | add new av devices to new nail salon; ref 201603303460. maher naDetails
add new av devices to new nail salon; ref 201603303460. maher na | $10,000 |
| Nov 15, 2016 | Completed final sign-off Aug 2017 | 1170 04th St | Chl Construction Company | g/f -new full service restaurant in vacant retail space. interior tenant improvement. n/a maher ordinance. life safety deferred.Details
g/f -new full service restaurant in vacant retail space. interior tenant improvement. n/a maher ordinance. life safety deferred. | $125,000 |
| Oct 31, 2016 | Completed final sign-off Dec 2017 | 1120 04th St | Golden Bay Construction | suite #g & f- t.i. includes new walls, hvac, plumbing, power, lighting, doors and install new finishes. n/a ordinance #155-13Details
suite #g & f- t.i. includes new walls, hvac, plumbing, power, lighting, doors and install new finishes. n/a ordinance #155-13 | $150,000 |
| Aug 26, 2016 | Completed final sign-off Nov 2016 | 610 Long Bridge St | Nani Heating & Air Conditioning Inc | install a/c in the garage and run line set and add coil on extg furnace. ref app#201506260123. n/a for maher.Details
install a/c in the garage and run line set and add coil on extg furnace. ref app#201506260123. n/a for maher. | $10,000 |
| Jun 2, 2016 | Completed final sign-off Jan 2017 | 1150 04th St | Cary Wing Plumbing & Fire Protection Inc | grd fl: interior t.i. for 6 heads. nfpa13. ref app#2016-0330-3460. n/a for maher.Details
grd fl: interior t.i. for 6 heads. nfpa13. ref app#2016-0330-3460. n/a for maher. | $3,500 |
| Mar 30, 2016 | Completed final sign-off Jan 2017 | 1150 04th St | Zhang's Building Co | interior tenant improvement to a beauty salon; sprinkler work under separate permit. maher n/aDetails
interior tenant improvement to a beauty salon; sprinkler work under separate permit. maher n/a | $65,000 |
| Feb 24, 2016 | Completed final sign-off Jul 2016 | 1160 04th St | Gene Catania Construction | install non-load bearing wall partitions for new tenant. mep to be installed under seperate permit. n/a maher ord 155-13Details
install non-load bearing wall partitions for new tenant. mep to be installed under seperate permit. n/a maher ord 155-13 | $15,000 |
| Jan 6, 2016 | Completed final sign-off Jan 2016 | 610 Long Bridge St | International Fire Equip | revision to 2015.0903.6014ul 300 fire system. coverage for cooking change. ref 2015-0626-0123. maher naDetails
revision to 2015.0903.6014ul 300 fire system. coverage for cooking change. ref 2015-0626-0123. maher na | $2,700 |
| Dec 28, 2015 | Never finaled issued Dec 2015, no final | 610 Long Bridge St | 21st Century Home Improvt | erect a non electrical , single faced, wall sign; maher n/aDetails
erect a non electrical , single faced, wall sign; maher n/a | $200 |
| Dec 8, 2015 | Never finaled issued Dec 2015, no final | 610 Long Bridge St | Siemens Industry, Inc. | 1st floor: fire alarm for the "reveille cafe" additions are 1 module and 6 horn/strobes. ref#201506260123Details
1st floor: fire alarm for the "reveille cafe" additions are 1 module and 6 horn/strobes. ref#201506260123 | $3,600 |
| Oct 9, 2015 | Never finaled issued Oct 2015, no final | 610 Long Bridge St | street spaceDetails
street space | ||
| Oct 8, 2015 | Completed final sign-off Jan 2016 | 610 Long Bridge St | Magnum Construction Group Inc | ground fl: extend (8) pendent fire sprinkler heads to new ceiling, add (1) dry pendent for walk in cooler. t.i. pa#2015-0626-0123. n/a ordinance #155-13Details
ground fl: extend (8) pendent fire sprinkler heads to new ceiling, add (1) dry pendent for walk in cooler. t.i. pa#2015-0626-0123. n/a ordinance #155-13 | $4,000 |
| Sep 3, 2015 | Completed final sign-off Jan 2016 | 610 Long Bridge St | International Fire Equip | installation of ul 300 fire system. ref app#201506260123. n/a maherDetails
installation of ul 300 fire system. ref app#201506260123. n/a maher | $2,000 |
| Jul 17, 2015 | Never finaled issued Jul 2015, no final | 610 Long Bridge St | street spaceDetails
street space | ||
| Jun 26, 2015 | Never finaled issued Jul 2015, no final | 610 Long Bridge St | 21st Century Home Improvt | interior ti of (e) gr fl space for (n) cafe. scope includes (n) coffee bar, (n) bar, (n) kitchen & equipment. elec and plumbing design build under sep permitDetails
interior ti of (e) gr fl space for (n) cafe. scope includes (n) coffee bar, (n) bar, (n) kitchen & equipment. elec and plumbing design build under sep permit | $128,000 |
| Apr 10, 2015 | Expired or cancelled withdrawn Jul 2015 | 1110 04th St | Josh Klein Construction Inc | a new restaurant t-i on the ground floor of an (e) six story building. involves interior wall & floor & ceiling finishes, kitchen equipment, restrooms & light fixtures.restrooms & light fixtures. add storage mezzanine. n/a for maher ordinance.Details
a new restaurant t-i on the ground floor of an (e) six story building. involves interior wall & floor & ceiling finishes, kitchen equipment, restrooms & light fixtures.restrooms & light fixtures. add storage mezzanine. n/a for maher ordinance. | $400,000 |
| Mar 20, 2015 | Completed final sign-off Apr 2015 | 1180 04th St | Siemens Industry, Inc. | 2,3,4,5,6 flrs: as-built fire alarm system install; final installation added: 14 horn/strobes, 5 strobes; tested and approved by sffd inspector add horn/strobes to ufas rms 201, 203, 204, 206, 322, 424, 501, 601 ok per yuen/brown ref 2013 0924 7559 maher-not req'dDetails
2,3,4,5,6 flrs: as-built fire alarm system install; final installation added: 14 horn/strobes, 5 strobes; tested and approved by sffd inspector add horn/strobes to ufas rms 201, 203, 204, 206, 322, 424, 501, 601 ok per yuen/brown ref 2013 0924 7559 maher-not req'd | $9,500 |
| Sep 22, 2014 | Never finaled issued Sep 2014, no final | 1110 04th St | street spaceDetails
street space | ||
| Aug 15, 2014 | Never finaled issued Aug 2014, no final | 1110 04th St | street spaceDetails
street space | ||
| Apr 16, 2014 | Never finaled issued Jul 2014, no final | 1110 04th St | street spaceDetails
street space | ||
| Feb 7, 2014 | Completed final sign-off Apr 2015 | 1180 04th St | Solarix Systems | install a solar hot water heating system for a multi-unit bldg. install consists of roof mounted collectors, water storage tanks, heat exchanger and circulation pumps. system is a closed -loop, glycol designs. n/a for the maher ordinance #155-13Details
install a solar hot water heating system for a multi-unit bldg. install consists of roof mounted collectors, water storage tanks, heat exchanger and circulation pumps. system is a closed -loop, glycol designs. n/a for the maher ordinance #155-13 | $231,000 |
| Jan 16, 2014 | Completed final sign-off Apr 2015 | 1180 04th St | Eagle Bay Enterprises, Inc (Dba Garnett | install evac maps on floors ground, 2nd,3rd,4th,5th,6th, and roof. total 51 maps. compliance with ordinance # 155-133 not required, excavation <50 cu ydDetails
install evac maps on floors ground, 2nd,3rd,4th,5th,6th, and roof. total 51 maps. compliance with ordinance # 155-133 not required, excavation <50 cu yd | $14,900 |
| Dec 17, 2013 | Never finaled issued Dec 2013, no final | 1110 04th St | street spaceDetails
street space | ||
| Nov 26, 2013 | Completed final sign-off Apr 2015 | 1110 04th St | James E Roberts-Obayashi Corporation | revision to 201012036075, to change from leed rated to greenpoint rated and delete ufas designations from adaptable units. revision to 201012036075Details
revision to 201012036075, to change from leed rated to greenpoint rated and delete ufas designations from adaptable units. revision to 201012036075 | |
| Sep 24, 2013 | Completed final sign-off Apr 2015 | 1180 04th St | Siemens Industry, Inc. | addition of a new fire alarm system for the buildingDetails
addition of a new fire alarm system for the building | $120,000 |
| Jul 11, 2013 | Never finaled issued Jul 2013, no final | 1110 04th St | street spaceDetails
street space | ||
| Jul 11, 2013 | Never finaled issued Jul 2013, no final | 1110 04th St | street spaceDetails
street space | ||
| Apr 19, 2013 | Never finaled issued Apr 2013, no final | 1110 04th St | sidewalk repairDetails
sidewalk repair | ||
| Jan 4, 2013 | Never finaled issued Jan 2013, no final | 1110 04th St | street space permitDetails
street space permit | ||
| Dec 20, 2012 | Completed final sign-off Apr 2015 | 1110 04th St | James E Roberts-Obayashi Corporation | tiedowns system deffered submitted. revision of permt#201012036075.Details
tiedowns system deffered submitted. revision of permt#201012036075. | |
| Sep 19, 2012 | Completed final sign-off Apr 2015 | 1110 04th St | James E Roberts-Obayashi Corporation | erect and dismantle of temporary construction crane. construction of concrete foundation. ref. 2010-12-03-6075s.Details
erect and dismantle of temporary construction crane. construction of concrete foundation. ref. 2010-12-03-6075s. | $25,000 |
| Sep 17, 2012 | Never finaled issued Sep 2012, no final | 1110 04th St | street spaceDetails
street space | ||
| Aug 22, 2012 | Completed final sign-off Apr 2015 | 1110 04th St | Cisco Fire Sprinklers, Inc. | new sprinkler and standpipe system to maske the new bldg fully sprinmklered. new housing development & parking. ref pa# 2010/12/03/6075.Details
new sprinkler and standpipe system to maske the new bldg fully sprinmklered. new housing development & parking. ref pa# 2010/12/03/6075. | $600,000 |
| Jul 2, 2012 | Never finaled issued Jul 2012, no final | 1110 04th St | street spaceDetails
street space | ||
| Apr 13, 2012 | Never finaled issued Apr 2012, no final | 259 Channel | add new address as: 259 channel. blk 8711, lot 014Details
add new address as: 259 channel. blk 8711, lot 014 | ||
| Dec 3, 2010 | Never finaled issued Jan 2011, no final | 610 Long Bridge St | add additional addresses for commercial spaces - 610, 620 long bridge street.Details
add additional addresses for commercial spaces - 610, 620 long bridge street. | ||
| Dec 3, 2010 | Never finaled issued Jan 2011, no final | 1180 04th St | add new addresses for building. primary - 1180 4th street (residential). additional - 1110, 1120, 1130 4th street (commercial).Details
add new addresses for building. primary - 1180 4th street (residential). additional - 1110, 1120, 1130 4th street (commercial). | ||
| Dec 3, 2010 | Never finaled issued Jan 2011, no final | 251 Channel St | add additional addresses for residential 251 channel street.Details
add additional addresses for residential 251 channel street. | ||
| Dec 3, 2010 | Never finaled issued Jan 2011, no final | 1150 04th St | add additional addresses for tenant spaces. 1150, 1160, 1170, 1190 4th street (commercial).Details
add additional addresses for tenant spaces. 1150, 1160, 1170, 1190 4th street (commercial). | ||
| Dec 3, 2010 | Completed final sign-off Apr 2015 | 1110 04th St | James E Roberts-Obayashi Corporation | erect 6 stories of 150 dwelling unit.Details
erect 6 stories of 150 dwelling unit. | $38,000,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- James E Roberts-Obayashi Corporation (4), Siemens Industry, Inc. (4), International Fire Equip (3), 21st Century Home Improvt (2), Chl Construction Company (2), Cisco Fire Sprinklers, Inc. (2), Faragon Restoration Ltd (2), Golden Bay Construction (2), Bay Area Builders Inc., Cary Wing Plumbing & Fire Protection Inc, Eagle Bay Enterprises, Inc (Dba Garnett, Encore Graphics Inc, Gene Catania Construction, Hao Qiang Construction, Josh Klein Construction Inc, Magnum Construction Group Inc, Nani Heating & Air Conditioning Inc, Plumbworks Inc. /Chris Goodwin Plumbing, Red Hawk Fire & Security Ca Llc, Solarix Systems, Thomas Swan Sign Co Inc, Zhang's Building Co
- Architects
- Allen Gee, Chris Throckmorton, Gerard Roody Creedon, Marc Dimalanta, Stephen Macmillan
- Engineers
- Robert Trifunovic, Ronald Yu, Srdjan Rebraca
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.