Erich A Burkharg
- License
- C13071
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Perkins Eastman
- Based in
- Sf
- On San Francisco permits
- Apr 2016 to Nov 2022
8 permits since 2000 (architect on 8 permits): 3 completed, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cw Horton General Contractor (5), E & C Builders Inc, Source Planning And Construction Inc
- Engineers
- Joshua Mcmahan (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 8
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 22, 2022 | Expired or cancelled withdrawn Jun 2023 | 940 Sutter St | E & C Builders Inc | lobby/reception area construction of (e) fitness center and (e) guestroom 102. create new kitchen and adjusting of office space. the 2nd fl renovation included removing 1 guestroom and converting it into small lounge area.Details
lobby/reception area construction of (e) fitness center and (e) guestroom 102. create new kitchen and adjusting of office space. the 2nd fl renovation included removing 1 guestroom and converting it into small lounge area. | $300,000 |
| Nov 9, 2022 | Never finaled filed Nov 2022, never issued | 415 Natoma St | level 1 - construction of the 415 natoma bistro restaurant and cafe all project scope will be on level 1 including reception area, lounge, bar kitchen, storage, bathroom and cafe across the public ramp defrred mep, sprinkler/fire alarm/ansul.Details
level 1 - construction of the 415 natoma bistro restaurant and cafe all project scope will be on level 1 including reception area, lounge, bar kitchen, storage, bathroom and cafe across the public ramp defrred mep, sprinkler/fire alarm/ansul. | $1,850,000 | |
| Dec 13, 2021 | Completed final sign-off Jun 2022 | 1 Embarcadero Center | Source Planning And Construction Inc | ste #3700: office t.i. full floor. mep include along with demo and structural work, finishes and fixtures on the 37th floor.Details
ste #3700: office t.i. full floor. mep include along with demo and structural work, finishes and fixtures on the 37th floor. | $3,500,000 |
| Oct 13, 2017 | Never finaled issued Oct 2017, no final | 335 Powell St | Cw Horton General Contractor | revision to pa #201709259458. construction of decorative elements adjacent to stair enclosure floors 3 thru 12. maher naDetails
revision to pa #201709259458. construction of decorative elements adjacent to stair enclosure floors 3 thru 12. maher na | |
| Sep 25, 2017 | Never finaled issued Oct 2017, no final | 335 Powell St | Cw Horton General Contractor | remodel main corridors & guestroom baths. corridor: new portals, chandeliers, signage & wall sconces. guest baths: replace plumbing fixtures in 600 rooms. move walls/fixtures in 102 rooms. no changes to occupancy/hvac/fire life 0n/a maherDetails
remodel main corridors & guestroom baths. corridor: new portals, chandeliers, signage & wall sconces. guest baths: replace plumbing fixtures in 600 rooms. move walls/fixtures in 102 rooms. no changes to occupancy/hvac/fire life 0n/a maher | $3,000,000 |
| Sep 25, 2017 | Never finaled issued Oct 2017, no final | 335 Powell St | Cw Horton General Contractor | remodel 7 accessible guest rooms w/mobility features, accessible bedroom area update to 2016 guidelines, renovate (e) accessible baths with new tub or roll-in shower. work conjunction with future permit for renovate approx. 102 guest rooms. no changes to occupancy/hvac/fire life safety. n/a maherDetails
remodel 7 accessible guest rooms w/mobility features, accessible bedroom area update to 2016 guidelines, renovate (e) accessible baths with new tub or roll-in shower. work conjunction with future permit for renovate approx. 102 guest rooms. no changes to occupancy/hvac/fire life safety. n/a maher | $150,000 |
| May 12, 2016 | Completed final sign-off Oct 2016 | 335 Powell St | Cw Horton General Contractor | revision to pa#2016-0422-5497, to remodel existing corridor on 11/f change out lights, (n) wall coverings carpet, paint, 2 (n) fire/life safety, seperate permit. n/a ordinance #155-13Details
revision to pa#2016-0422-5497, to remodel existing corridor on 11/f change out lights, (n) wall coverings carpet, paint, 2 (n) fire/life safety, seperate permit. n/a ordinance #155-13 | $15,000 |
| Apr 22, 2016 | Completed final sign-off Oct 2016 | 335 Powell St | Cw Horton General Contractor | 11th floor-main bldg-guestrms #1109 & #1172. build (2) model rooms & baths in (e) guestrms/baths. cosmetic remodel. work includes (2) new showers, plbg fixtures, replacement of selected light fixtures w/new, no hvac, no ext. work. n/a maher ordDetails
11th floor-main bldg-guestrms #1109 & #1172. build (2) model rooms & baths in (e) guestrms/baths. cosmetic remodel. work includes (2) new showers, plbg fixtures, replacement of selected light fixtures w/new, no hvac, no ext. work. n/a maher ord | $45,000 |