Karen Anne Eichler
- Listed as
- architect, authorized agent-others, pmt consultant/expediter
- Firm
- Eichler Davies Architecture
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to May 2025
35 permits since 2000 (architect on 15 permits, authorized agent-others on 14 permits, pmt consultant/expediter on 6 permits): 31 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 20, 2025 | Completed final sign-off Mar 2026 | 151 15th Av | Itu Construction | legalize rear deck and to comply with complaint#: 201782961: item 2,3,4 and 5.Details
legalize rear deck and to comply with complaint#: 201782961: item 2,3,4 and 5. | $10,000 |
| Jun 22, 2022 | Completed final sign-off Mar 2024 | 3311 Pacific Av | Matarozzi/Pelsinger Builders Inc. | 107.3 sf new bay addition at 2/f only. rear elevation of house-with crawl space below and roof. materials to match existing. (3) new french door units at new bay added. (1) large door unit removed. existing wood deck to be extended at new bay.Details
107.3 sf new bay addition at 2/f only. rear elevation of house-with crawl space below and roof. materials to match existing. (3) new french door units at new bay added. (1) large door unit removed. existing wood deck to be extended at new bay. | $50,000 |
| Dec 6, 2021 | Expired or cancelled cancelled Jan 2025 | 2732 Balboa St | 31.8sf of conditioned space will be added to (e) laundry rm & (e) bedroom & 9e) kitchen will be remodeled. (3) (e) windows at (e) bedroom to be removed, & (n) sliding door unit installed. (e) exterior door at (e) laundry rm will be removed, add (n) door at rear laundry rm addition.Details
31.8sf of conditioned space will be added to (e) laundry rm & (e) bedroom & 9e) kitchen will be remodeled. (3) (e) windows at (e) bedroom to be removed, & (n) sliding door unit installed. (e) exterior door at (e) laundry rm will be removed, add (n) door at rear laundry rm addition. | $50,000 | |
| Nov 18, 2021 | Completed final sign-off Sep 2025 | 730 10th Av | Joseph Francis Lockary | convert part of unconditioned garage/storage space at 1/f to conditioned space & addition at rear of structure at 1/f, to include mud room, rec room, guest bedrm suite. n deck at roof of conditioned space & ext. stairs. combined heating & domestic hot water sys, radiant fl heating. n elec heat pump.Details
convert part of unconditioned garage/storage space at 1/f to conditioned space & addition at rear of structure at 1/f, to include mud room, rec room, guest bedrm suite. n deck at roof of conditioned space & ext. stairs. combined heating & domestic hot water sys, radiant fl heating. n elec heat pump. | $200,000 |
| Sep 2, 2020 | Completed final sign-off Jun 2022 | 866 31st Av | 2nd flr: add powder room & remodel kitchen. 3rd floor: remodel bathroom & add full bathroom. openings at rear wall of house changed. 3rd floor (2) windows replaced and moved. 2nd floor (n) sliding door. no conditioned space added.Details
2nd flr: add powder room & remodel kitchen. 3rd floor: remodel bathroom & add full bathroom. openings at rear wall of house changed. 3rd floor (2) windows replaced and moved. 2nd floor (n) sliding door. no conditioned space added. | $300,000 | |
| Dec 17, 2019 | Completed final sign-off Dec 2021 | 163 04th Av | Gil Construction & Assoc Inc. | convert 354.2 sq ft ground floor storage space - unconditioned to conditioned livable space - home office. new rear door & window facing rear yard and 2 side property line windows, 3/4 hour fire rated units. new full bathroom added to space.Details
convert 354.2 sq ft ground floor storage space - unconditioned to conditioned livable space - home office. new rear door & window facing rear yard and 2 side property line windows, 3/4 hour fire rated units. new full bathroom added to space. | $30,000 |
| May 7, 2019 | Completed final sign-off Dec 2019 | 775 Pacheco St | Prescott Enterprises | 296.6 sf counditioned space added to home converting part of ground floor, ground fl. garage. fire seperation between dwelling unit & garage added, clad wood windows & doors at rear elevation onlyDetails
296.6 sf counditioned space added to home converting part of ground floor, ground fl. garage. fire seperation between dwelling unit & garage added, clad wood windows & doors at rear elevation only | $40,000 |
| May 23, 2017 | Completed final sign-off Feb 2018 | 714 Duncan St | Itu Construction | (n) wood deck within buildable area of lot - access from 2nd fl. 87.5 sf (n) 6'-0" w x 6'-8" (h) sliding doors @ living rm. (n) lower deck portion & (n) wood stair 53.3 sf (e) wood lower deck & stair demo 50.2 sfDetails
(n) wood deck within buildable area of lot - access from 2nd fl. 87.5 sf (n) 6'-0" w x 6'-8" (h) sliding doors @ living rm. (n) lower deck portion & (n) wood stair 53.3 sf (e) wood lower deck & stair demo 50.2 sf | $18,000 |
| Dec 9, 2016 | Completed final sign-off May 2018 | 303 Caselli Av | Daniel Ehrmann | interior remodel to 2nd floor flat. bathroom location moved & kitchen moved. new windows at south & east elevation and 1 fire rated 3/4 hr window at west elevation. no foundation work except interior footings at first floor (garage) for new postsDetails
interior remodel to 2nd floor flat. bathroom location moved & kitchen moved. new windows at south & east elevation and 1 fire rated 3/4 hr window at west elevation. no foundation work except interior footings at first floor (garage) for new posts | $75,000 |
| Jun 8, 2015 | Completed final sign-off Oct 2015 | 730 10th Av | Joseph Francis Lockary | moving kitchen into (e) dining room - appliances, electrical, plumbing. adding a (n) powder room at approx imately (e) coat closet location.Details
moving kitchen into (e) dining room - appliances, electrical, plumbing. adding a (n) powder room at approx imately (e) coat closet location. | $20,000 |
| May 6, 2014 | Completed final sign-off Apr 2015 | 2261 Fulton St | Armour Construction | 3 of 4 units in tic bldg going thru condo conversion have balconies insp. requiries (e) (3) balconies be replaced no record of permit and not compliant to current codes. new wood decks with posts & f.r. wall to grade to replace cantilevered balconies. one new wall sconce at (3)exist.doors to(n)Details
3 of 4 units in tic bldg going thru condo conversion have balconies insp. requiries (e) (3) balconies be replaced no record of permit and not compliant to current codes. new wood decks with posts & f.r. wall to grade to replace cantilevered balconies. one new wall sconce at (3)exist.doors to(n) | $50,000 |
| Jul 9, 2013 | Completed final sign-off Dec 2017 | 126 18th Av | The Toboni Group | demolition of (e) structurally unsound addition. new addition & remodel fourth story added to house, house to be fully sprinklered.Details
demolition of (e) structurally unsound addition. new addition & remodel fourth story added to house, house to be fully sprinklered. | $200,000 |
| Mar 8, 2013 | Completed final sign-off Aug 2014 | 2506 Filbert St | an (e) 40 sf dormer with hip roof needs replaced due to dry rot and disrepair a new 85 sf dormer with shed roof will be built in its place (n) dormer to have a composite shingle roof and painted ship lap siding to match house a new fixed "velux" skylightDetails
an (e) 40 sf dormer with hip roof needs replaced due to dry rot and disrepair a new 85 sf dormer with shed roof will be built in its place (n) dormer to have a composite shingle roof and painted ship lap siding to match house a new fixed "velux" skylight | $3,000 | |
| Mar 20, 2012 | Completed final sign-off Aug 2014 | 2506 Filbert St | full interior remodel, in-fill addition @ north elevation (rear) of house only. south elevation (front-filbert st). remodel-widen (e) garage door by 2'0" & driveway (e) front brick planters to be reworked for wider driveway. 1 brick step from public right of way to brick entry porch to be moved. allDetails
full interior remodel, in-fill addition @ north elevation (rear) of house only. south elevation (front-filbert st). remodel-widen (e) garage door by 2'0" & driveway (e) front brick planters to be reworked for wider driveway. 1 brick step from public right of way to brick entry porch to be moved. all | $750,000 | |
| Aug 2, 2011 | Completed final sign-off Feb 2013 | 62 05th Av | Daniel Ehrmann | removal of (e) 1960's addition & deck to 1904 structure. new addition & wood deck @ rear of house. front (street) elevation to have minor improvements to 9e) entry stair & porch. new driveway planers & driveway (concrete). new cedar shingles (natural finish) to replace painted wood siding. interiorDetails
removal of (e) 1960's addition & deck to 1904 structure. new addition & wood deck @ rear of house. front (street) elevation to have minor improvements to 9e) entry stair & porch. new driveway planers & driveway (concrete). new cedar shingles (natural finish) to replace painted wood siding. interior | $400,000 |
| Jul 6, 2011 | Completed final sign-off Apr 2013 | 814 Mission St | relocate (e) deli entrance and new storefront (tenant improvement under separate permit).Details
relocate (e) deli entrance and new storefront (tenant improvement under separate permit). | $100,000 | |
| Jul 6, 2011 | Completed final sign-off Jul 2014 | 1395 Van Ness Av | Lusardi Construction Co | new sprinkler system on all floors: new 1,000 gpm fire pump; new class i standpipe (existing dry standpipe to remain); existing 8-inch fire service with new 8 inch backflow ddc; 1,464 sprinklers total.Details
new sprinkler system on all floors: new 1,000 gpm fire pump; new class i standpipe (existing dry standpipe to remain); existing 8-inch fire service with new 8 inch backflow ddc; 1,464 sprinklers total. | $90,000 |
| Jun 6, 2011 | Completed final sign-off Feb 2014 | 1266 09th Av | Johnstone Moyer Inc | shoring & excavation fo rnew bldg approved under pa #200912183521-s.Details
shoring & excavation fo rnew bldg approved under pa #200912183521-s. | $200,000 |
| Jun 6, 2011 | Completed final sign-off Feb 2014 | 1264 09th Av | underpinning for work on adjacent property at 1266 - 9th ave (ref pa #200912183521).Details
underpinning for work on adjacent property at 1266 - 9th ave (ref pa #200912183521). | $144,000 | |
| May 20, 2011 | Completed final sign-off Jan 2013 | 1998 Market St | demolish 1 story, gas station.Details
demolish 1 story, gas station. | $10,000 | |
| May 17, 2011 | Completed final sign-off Sep 2011 | 845 Market St | core and shell. add new communicating stair and 2 stop elevator. ti under separate permit. between 2nd and 3rd floors retail space.Details
core and shell. add new communicating stair and 2 stop elevator. ti under separate permit. between 2nd and 3rd floors retail space. | $310,000 | |
| Apr 27, 2011 | Completed final sign-off May 2013 | 1395 Van Ness Av | Lusardi Construction Co | window replacement on levels 3-6Details
window replacement on levels 3-6 | $65,000 |
| Apr 26, 2011 | Completed final sign-off Feb 2012 | 115 Sansome St | Arg Conservation Services | repair/restore (e) brick facade in kind.Details
repair/restore (e) brick facade in kind. | $65,000 |
| Apr 25, 2011 | Completed final sign-off Mar 2012 | 1355 Market St | to complete work & obtain for final inspection for work approved under app#2008-09-22-2258Details
to complete work & obtain for final inspection for work approved under app#2008-09-22-2258 | $95,000 | |
| Apr 22, 2011 | Never finaled issued Apr 2011, no final | 299 Bay Shore Bl | repair/replace existing metal door & panic hardward in kind, interior painting & decorative panneling, replace (e) vinyl flooring with (n) vinyl flooring. barrier removal per 1134b.2.1 except #3.Details
repair/replace existing metal door & panic hardward in kind, interior painting & decorative panneling, replace (e) vinyl flooring with (n) vinyl flooring. barrier removal per 1134b.2.1 except #3. | $15,000 | |
| Apr 8, 2011 | Expired or cancelled cancelled Jan 2020 | 410 Bush St | Hathaway Dinwiddie Co. | respond to nov issued 7/20/2010 by sffd. verify occupancy classification and use. remove or relocate obstructions of fire alarm & exit egress. obtain use permit for kilns. revise basement egress.Details
respond to nov issued 7/20/2010 by sffd. verify occupancy classification and use. remove or relocate obstructions of fire alarm & exit egress. obtain use permit for kilns. revise basement egress. | $96,000 |
| Apr 7, 2011 | Completed final sign-off May 2011 | 460 Townsend St | Hathaway Dinwiddie Co. | revision to appl #201005051801 to provide structural details for (n) stair. no change of use & no change to approve design of stair.Details
revision to appl #201005051801 to provide structural details for (n) stair. no change of use & no change to approve design of stair. | |
| Mar 25, 2011 | Completed final sign-off Oct 2012 | 626 14th St | Webcor Construction Lp | demolish 2 units with garage, 3 stories, type 5 building.Details
demolish 2 units with garage, 3 stories, type 5 building. | $10,000 |
| Mar 25, 2011 | Completed final sign-off Oct 2012 | 2001 Market St | Webcor Construction Lp | demolish commercial, type 1, 1 & 1/2 stories building.Details
demolish commercial, type 1, 1 & 1/2 stories building. | $40,000 |
| Mar 25, 2011 | Completed final sign-off Oct 2012 | 632 14th St | Webcor Construction Lp | demolish 2 units w/ basement, type 5, 2 stories building.Details
demolish 2 units w/ basement, type 5, 2 stories building. | $10,000 |
| Mar 7, 2011 | Completed final sign-off Nov 2012 | 1525 Mission St | obtain final inspection for 200809040820Details
obtain final inspection for 200809040820 | ||
| Mar 7, 2011 | Completed final sign-off Nov 2012 | 1525 Mission St | Mc Millan Electric | complete work and obtain final inspection for 200811035693Details
complete work and obtain final inspection for 200811035693 | $10,000 |
| Mar 7, 2011 | Completed final sign-off Nov 2012 | 1525 Mission St | obtain final inspection for 200910088586Details
obtain final inspection for 200910088586 | ||
| Mar 7, 2011 | Never finaled issued Mar 2011, no final | 1525 Mission St | obtain final inspection for 200712241208Details
obtain final inspection for 200712241208 | ||
| Apr 20, 2005 | Completed final sign-off Jan 2008 | 1300 Eddy St | bldg #9 - to erect 3 stories of 1 family dwelling.Details
bldg #9 - to erect 3 stories of 1 family dwelling. | $200,000 |