Frank Fung
- Listed as
- architect, authorized agent-others
- Firm
- Ed2 International
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Jul 2025
21 permits since 2000 (architect on 20 permits, authorized agent-others on 1 permit): 15 completed, 1 in progress, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2025 | Completed final sign-off Aug 2025 | 1 Zoo Rd | Pacific Pars Construction Llc | revision to 202212239143: delete scope of work for the pelican lagoon holding/exhibit from scope of 202212239143.Details
revision to 202212239143: delete scope of work for the pelican lagoon holding/exhibit from scope of 202212239143. | |
| Jul 1, 2025 | In progress filed Jul 2025, not yet issued | 1 Zoo Rd | renovate(e)animal holding spaces & add new interior rooms for animal indoor playrooms,animal handles preparation stations,storage & trash room.renovate(e)mech,lighting & electrical systems for new animal holding space.renovate(e)outdoor exhibit spaces.Details
renovate(e)animal holding spaces & add new interior rooms for animal indoor playrooms,animal handles preparation stations,storage & trash room.renovate(e)mech,lighting & electrical systems for new animal holding space.renovate(e)outdoor exhibit spaces. | $4,000,000 | |
| Jul 5, 2023 | Never finaled filed Jul 2023, never issued | 651 Geary St | altered site permit for bpa #201706219947 -reduce scope, remove 2 of the 3 basement parking levels.delete all parking.revise ground floor layout & reduce size of remaining basement level.Details
altered site permit for bpa #201706219947 -reduce scope, remove 2 of the 3 basement parking levels.delete all parking.revise ground floor layout & reduce size of remaining basement level. | ||
| Apr 11, 2023 | Completed final sign-off Aug 2023 | 1 Zoo Rd | O R Builders | reconnect (e) demolished portion of the bridge that connect to the terrace level of the pdc building to provide ada accessDetails
reconnect (e) demolished portion of the bridge that connect to the terrace level of the pdc building to provide ada access | $40,000 |
| Dec 23, 2022 | Completed final sign-off Aug 2025 | 1 Zoo Rd | Pacific Pars Construction Llc | two - one story addition of an animal holding spaces and two outdoor animal exhibit spaces adjacent to exisitng animal holding facility.Details
two - one story addition of an animal holding spaces and two outdoor animal exhibit spaces adjacent to exisitng animal holding facility. | $60,000 |
| May 23, 2019 | Completed final sign-off Mar 2020 | 1441 Ocean Av | Amone Corp | sign, "nems north east medical services". wall mounted, single-face, 46 sq ft.Details
sign, "nems north east medical services". wall mounted, single-face, 46 sq ft. | $2,000 |
| Jun 21, 2017 | Never finaled issued Dec 2018, no final | 651 Geary St | erect 13 stories, 3 basement, type 1a, 52 residential with non stacker parking and ground floor commercial/retail building. maher n/a.Details
erect 13 stories, 3 basement, type 1a, 52 residential with non stacker parking and ground floor commercial/retail building. maher n/a. | $20,000,000 | |
| Apr 6, 2017 | Completed final sign-off Jan 2018 | 1422 Noriega St | Transworld Construction | remove (e) partywall,partitoins,ceiling/suffit, entry dr & back stair & install partiitons, finishes, gym bd ceilings,casework, elec power,lighting,mech air distr, replace window. create reception area, member svcs area & exam areas. relocate & upgrade (e) restrm & 1 (n) restrm. footing, shearwallDetails
remove (e) partywall,partitoins,ceiling/suffit, entry dr & back stair & install partiitons, finishes, gym bd ceilings,casework, elec power,lighting,mech air distr, replace window. create reception area, member svcs area & exam areas. relocate & upgrade (e) restrm & 1 (n) restrm. footing, shearwall | $200,000 |
| Sep 14, 2016 | Completed final sign-off Aug 2019 | 3431 Taraval St | Transworld Construction | renov(e)1st story of a type 5 bldg.upgrade(e)foundation to support 1 new story add above(e)1st story.install a new elevator,an auto.sprinklr sym,(n)stair/intr parti/acoustical ceilings/lighting access.restrms, upgrade(e)pwr distribution/plumb/mech sym(n)roof/roof deck (n)flring,windows,drs&storefrtDetails
renov(e)1st story of a type 5 bldg.upgrade(e)foundation to support 1 new story add above(e)1st story.install a new elevator,an auto.sprinklr sym,(n)stair/intr parti/acoustical ceilings/lighting access.restrms, upgrade(e)pwr distribution/plumb/mech sym(n)roof/roof deck (n)flring,windows,drs&storefrt | $600,000 |
| Jul 14, 2016 | Completed final sign-off Mar 2017 | 1434 Noriega St | change of use to medical services-removal of extg finishes and partitions. install new partition, flooring, acoustical ceiling, gyp brd ceiling, casework, electrical power, signal distribution, lighting, plmg for new restroom and sink, mechanical air distribution system.Details
change of use to medical services-removal of extg finishes and partitions. install new partition, flooring, acoustical ceiling, gyp brd ceiling, casework, electrical power, signal distribution, lighting, plmg for new restroom and sink, mechanical air distribution system. | $100,000 | |
| Oct 6, 2015 | Completed final sign-off Mar 2020 | 1441 Ocean Av | Shamrock Engineering Concrete, Amone Corp | chg of use.renovate(e)1st story.upgrade(e)foundation to support 2 new story addition above (e)1st story.install a new elevator,an auto sprinkler sys,new stairs,interior partitions,acoustical ceilings,liting,access restrooms.upgrade(e)power distribution,plum&mech.sys for new renovation&addition wk.Details
chg of use.renovate(e)1st story.upgrade(e)foundation to support 2 new story addition above (e)1st story.install a new elevator,an auto sprinkler sys,new stairs,interior partitions,acoustical ceilings,liting,access restrooms.upgrade(e)power distribution,plum&mech.sys for new renovation&addition wk. | $900,000 |
| Mar 19, 2015 | Completed final sign-off Jun 2015 | 1 Zoo Rd | Nibbi Bros Assoc Inc. | seismic strengthening of exterior wall to support new interior decorating-architectural wall, rock wall. ** maher: compliance with ordinance no# 155-13 not required **Details
seismic strengthening of exterior wall to support new interior decorating-architectural wall, rock wall. ** maher: compliance with ordinance no# 155-13 not required ** | $35,000 |
| Feb 18, 2015 | Completed final sign-off Jul 2015 | 1 Zoo Rd | Nibbi Bros Assoc Inc. | add one bird cage support structure to back of house of the (e) south american tropical forest exhibit building. new mat foundation, steel beam post structure. standing seam roof, drains @ cage area, lights for keeper platform & stair. ** maher: compliance with ordinance no# 155-13 not required **Details
add one bird cage support structure to back of house of the (e) south american tropical forest exhibit building. new mat foundation, steel beam post structure. standing seam roof, drains @ cage area, lights for keeper platform & stair. ** maher: compliance with ordinance no# 155-13 not required ** | $40,000 |
| Jan 16, 2014 | Completed final sign-off Jun 2015 | 1 Zoo Rd | Nibbi Bros Assoc Inc. | demolition to (e) floor slab. replace w/ (n) slab, (n) struct support for (n) exhibit components. (n) custom exhibit faux rock work & tree, mesh enclosure, waterfalls, displace enclosure, (n) work path, casework, painting & graphics. seismic strengthening.Details
demolition to (e) floor slab. replace w/ (n) slab, (n) struct support for (n) exhibit components. (n) custom exhibit faux rock work & tree, mesh enclosure, waterfalls, displace enclosure, (n) work path, casework, painting & graphics. seismic strengthening. | $2,000,000 |
| Sep 12, 2012 | Never finaled issued Sep 2012, no final | 1167 Mission St | Transworld Construction | revision to appl #2012.0801.6295: revised portions are shown per delta 1 set - modify entries to opposite sides of corridor (either end). 1 page drawing a2.0Details
revision to appl #2012.0801.6295: revised portions are shown per delta 1 set - modify entries to opposite sides of corridor (either end). 1 page drawing a2.0 | |
| Feb 9, 2010 | Completed final sign-off Jun 2010 | 1601 Lane St | River View Construction Inc | revision to appl #200809121467: roll-up grilles, concrete curbs, stucco column 7 plaster, courtyard concrete slab, lighting & drainage.Details
revision to appl #200809121467: roll-up grilles, concrete curbs, stucco column 7 plaster, courtyard concrete slab, lighting & drainage. | $50,000 |
| Apr 3, 2009 | Completed final sign-off Oct 2009 | 42 Waller St | Mutual Seiko Construction | tenant improvement: construct (n) non-structural bearing walls, (n) decking and (n) canopy @ breezeway. add (n) lighting fixtures, (n) restrooms fixtures (for children's use) & replace (e) gas furnace. sprinklers under separate permit.Details
tenant improvement: construct (n) non-structural bearing walls, (n) decking and (n) canopy @ breezeway. add (n) lighting fixtures, (n) restrooms fixtures (for children's use) & replace (e) gas furnace. sprinklers under separate permit. | $100,000 |
| Apr 3, 2009 | Completed final sign-off Oct 2009 | 52 Waller St | Mutual Seiko Construction | tenant improvement: construct (n) non-structural bearing walls (n) deck & canopy @ breezeway. (n) restrooms & (n) lighting & plumbing fixtures. sprinklers permit under separate permit.Details
tenant improvement: construct (n) non-structural bearing walls (n) deck & canopy @ breezeway. (n) restrooms & (n) lighting & plumbing fixtures. sprinklers permit under separate permit. | $100,000 |
| Sep 12, 2008 | Completed final sign-off Jun 2010 | 1601 Lane St | Schikore Construction, River View Construction Inc | demo work-1st, 2nd & 3rd floors. tenant alteration-1st, 2nd & 3rd floor. new stairs, elevator structure. new ada restrooms, ada lift. m.e.p, life safety under seperate permitDetails
demo work-1st, 2nd & 3rd floors. tenant alteration-1st, 2nd & 3rd floor. new stairs, elevator structure. new ada restrooms, ada lift. m.e.p, life safety under seperate permit | $993,000 |
| Jun 26, 2008 | Expired or cancelled expired Jun 2010 | 1601 Lane St | demolition work-ground floor (wall & door), tenant alteration-ground floor (new partitions & door), non-structural work.Details
demolition work-ground floor (wall & door), tenant alteration-ground floor (new partitions & door), non-structural work. | $4,000 | |
| Jun 9, 2008 | Never finaled issued Jul 2010, no final | 1601 Lane St | River View Construction Inc | remodel existing office/activity space on 1st floor, to new child care & uni-sex restroom plus, remodel (e) boiler room. tenant improvement, repalce windows with hm doors, (perimeter wall). mep, life safety, sprinklers under separate permit.Details
remodel existing office/activity space on 1st floor, to new child care & uni-sex restroom plus, remodel (e) boiler room. tenant improvement, repalce windows with hm doors, (perimeter wall). mep, life safety, sprinklers under separate permit. | $300,000 |