Permit GraphShortlistSan Francisco building permits since 2000

Michael Terndrup

License
C40160
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect, authorized agent-others
Firm
Eag Studio Architecture
Based in
Sf
On San Francisco permits
Jun 2020 to Nov 2026

40 permits since 2000 (architect on 38 permits, authorized agent-others on 3 permits): 11 completed, 25 in progress, 4 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Flmc Development Corp Dba Adamo Campagna (6), Marquez Builders (6), Citywest Construction Inc. (5), Citadel Inc (2), Miann Builder (2), Arrow Builders Inc, Beyond The Horizon Construction, Burke Construction, Gar-Cal Corporation, Iy Development & Renovation Inc, Javier Magana Construction Services, Level 8 Construction Inc, Orchard Construction
Engineers
Huzma Shahid Chowdhry (5), Donald David, Fareed Himatti, Gregory Paul Wallace, Gregory Paul Wallace, John Voekel

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 18, 2026In progress
filed Nov 2026, not yet issued
460 Fair Oaks Stto comply with nov 202663797 revision to pa#202510076898. 124 cy reduction of excavation, from 595 to 471. new lightwell on south side of building @ level 1 in lieu of the lowered patio.
Details
Permit
202611180934

to comply with nov 202663797 revision to pa#202510076898. 124 cy reduction of excavation, from 595 to 471. new lightwell on south side of building @ level 1 in lieu of the lowered patio.

Open the permit page

Sep 8, 2026In progress
issued Sep 2026
1220 Church Strevision to pa# 202412036100. reconfigure the fenestration at the rear. reduce the width of the 2nd front door. move the rear southwest wall to 3'-0" from the property line. reconfigure the ktichen of the lower unit. reconfigure the bathrooms, closets & laundry room. reconfigure & add skylight.
Details
Permit
202609087801
Permit issued
Sep 30, 2026

revision to pa# 202412036100. reconfigure the fenestration at the rear. reduce the width of the 2nd front door. move the rear southwest wall to 3'-0" from the property line. reconfigure the ktichen of the lower unit. reconfigure the bathrooms, closets & laundry room. reconfigure & add skylight.

Open the permit page

Aug 17, 2026In progress
filed Aug 2026, not yet issued
2316 Leavenworth Stadd (n) bay window to rear facade
Details
Permit
202608176669

add (n) bay window to rear facade

Open the permit page

$47,000
Jul 31, 2026In progress
issued Sep 2026
58 Digby StFlmc Development Corp Dba Adamo Campagnashear wall relocation and enlargement- remove and replace gypsum wall board on interior side of exterior walls to add insulation and upgrade electrical wiring- update bathroom fixtures and finishes in the upper floor bathroom, reconfigure the closet in the den/office- relocate micorwave/ oven & nook
Details
Permit
202607315916
Permit issued
Sep 23, 2026

shear wall relocation and enlargement- remove and replace gypsum wall board on interior side of exterior walls to add insulation and upgrade electrical wiring- update bathroom fixtures and finishes in the upper floor bathroom, reconfigure the closet in the den/office- relocate micorwave/ oven & nook

Open the permit page

$39,624
May 29, 2026In progress
issued Jun 2026
1772 Vallejo StFlmc Development Corp Dba Adamo Campagnarear cottage (detached garage): in kind overhead door replacement, voluntary strengthening by bracing of openings and in kind repair of masonry at garage only.
Details
Permit
202605292192
Permit issued
Jun 2, 2026

rear cottage (detached garage): in kind overhead door replacement, voluntary strengthening by bracing of openings and in kind repair of masonry at garage only.

Open the permit page

$12,000
May 4, 2026In progress
filed May 2026, not yet issued
10 Miller Plminor interior remodel of (e) kitchen. add partition for (n) pantry. remove (e) fireplace and accompanying partition walls at living room, add partition walls for additional closet and (n) laundry, (n) interior finishes and fixtures in line with (e) plumbing.
Details
Permit
202605040626

minor interior remodel of (e) kitchen. add partition for (n) pantry. remove (e) fireplace and accompanying partition walls at living room, add partition walls for additional closet and (n) laundry, (n) interior finishes and fixtures in line with (e) plumbing.

Open the permit page

$166,539
Apr 20, 2026In progress
issued Jul 2026
3641 Clement StCitywest Construction Inc.add a new 479 sq.ft roof patio w/ stair access from (e) garden
Details
Permit
202604209723
Permit issued
Jul 10, 2026

add a new 479 sq.ft roof patio w/ stair access from (e) garden

Open the permit page

$13,000
Apr 9, 2026Completed
final sign-off Apr 2026
1151 Fell Strevise p/a 2019-1122-7984 to include document property line locations per parcel map 12532, revise ground floor plan to show the location of the electric meters to be in a 1-hour enclosure in the adjacent egress component as required by pg&e.
Details
Permit
202604099202
Permit issued
Apr 10, 2026
Final sign-off
Apr 14, 2026

revise p/a 2019-1122-7984 to include document property line locations per parcel map 12532, revise ground floor plan to show the location of the electric meters to be in a 1-hour enclosure in the adjacent egress component as required by pg&e.

Open the permit page

Mar 2, 2026In progress
issued Mar 2026
831 27th StMarquez Buildersrevision 202508072549 to include raise (e) window opening (vertically ) located on balacony facing front. add awning to hang over rear patio doors and waterproofing. relocate and infill (e) bedroom windows from south side and create (n) opening for windows on east side of property
Details
Permit
202603026752
Permit issued
Mar 3, 2026

revision 202508072549 to include raise (e) window opening (vertically ) located on balacony facing front. add awning to hang over rear patio doors and waterproofing. relocate and infill (e) bedroom windows from south side and create (n) opening for windows on east side of property

Open the permit page

$4,200
Feb 19, 2026In progress
issued May 2026
1772 Vallejo StFlmc Development Corp Dba Adamo Campagnareplace driveway in kind. trench for utilities under driveway location w/ replacement of trench drain & collection drain. new landscaping including planting & site wall repair with replacement of (e) french drain. all work under 30" in height.
Details
Permit
202602196180
Permit issued
May 27, 2026

replace driveway in kind. trench for utilities under driveway location w/ replacement of trench drain & collection drain. new landscaping including planting & site wall repair with replacement of (e) french drain. all work under 30" in height.

Open the permit page

$12,000
Dec 1, 2025In progress
issued May 2026
460 Fair Oaks StMarquez Buildersexpand unit on level 1 (#462a) to add a bathroom and relocate bedrooms. interior remodel/reconfigure level 2 (#460) & level 3 (#462). add new 297 sqft roof deck.
Details
Permit
202510076898
Permit issued
May 7, 2026

expand unit on level 1 (#462a) to add a bathroom and relocate bedrooms. interior remodel/reconfigure level 2 (#460) & level 3 (#462). add new 297 sqft roof deck.

Open the permit page

$429,000
Nov 26, 2025In progress
issued Dec 2025
831 27th StMarquez Buildersrevision to pa # 202508072549: add peaked skylight & flat skylight over stairs. revise retaining walls at the ground fl per structural
Details
Permit
202511260524
Permit issued
Dec 9, 2025

revision to pa # 202508072549: add peaked skylight & flat skylight over stairs. revise retaining walls at the ground fl per structural

Open the permit page

$14,500
Nov 21, 2025In progress
issued May 2026
1018 Shrader StOrchard Constructionrevision to pa #202507110631 infill redundant doorway and steps on the lower level. provide verified sffd ladder path which has been confirmed in the field
Details
Permit
202511210184
Permit issued
May 14, 2026

revision to pa #202507110631 infill redundant doorway and steps on the lower level. provide verified sffd ladder path which has been confirmed in the field

Open the permit page

$1,200
Aug 7, 2025In progress
issued Aug 2025
831 27th StMarquez Buildersreconfigure the ground floor layout to add a (n) bedroom & closets. excavate 23 cu.yrd to add a (n) storage/laundry room. remove (e) skylights, remodel kitchen in place. increase 238 sf habitable area.
Details
Permit
202508072549
Permit issued
Aug 21, 2025

reconfigure the ground floor layout to add a (n) bedroom & closets. excavate 23 cu.yrd to add a (n) storage/laundry room. remove (e) skylights, remodel kitchen in place. increase 238 sf habitable area.

Open the permit page

$65,000
Jun 30, 2025In progress
issued Feb 2026
1437 Mason StIy Development & Renovation Incfacade improvements, full interior remodel, remove rear stair, replace front stair w/in (e) envelope, (n) foundation interior conversion of basement, all work w/in (e) envelope.
Details
Permit
202409050181
Permit issued
Feb 25, 2026

facade improvements, full interior remodel, remove rear stair, replace front stair w/in (e) envelope, (n) foundation interior conversion of basement, all work w/in (e) envelope.

Open the permit page

$467,000
Jun 20, 2025Completed
final sign-off Jan 2026
166 10th AvCitywest Construction Inc.unit #3: replace window on front facade w/smaller window to raise sill height
Details
Permit
202506209110
Permit issued
Jul 8, 2025
Final sign-off
Jan 26, 2026

unit #3: replace window on front facade w/smaller window to raise sill height

Open the permit page

$500
Jun 18, 2025Completed
final sign-off Jan 2026
166 10th AvCitywest Construction Inc.unit3; reconfigure and remodel (1) bedroom, (2) bathrooms and the kitchen of unit 3. add (3) new skylights - min 60" from the property line parapets.
Details
Permit
202506188986
Permit issued
Jul 8, 2025
Final sign-off
Jan 26, 2026

unit3; reconfigure and remodel (1) bedroom, (2) bathrooms and the kitchen of unit 3. add (3) new skylights - min 60" from the property line parapets.

Open the permit page

$72,800
May 9, 2025In progress
filed May 2025, not yet issued
1355 Francisco StMiann Builderunit 1355 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition.
Details
Permit
202505096210

unit 1355 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition.

Open the permit page

May 9, 2025In progress
filed May 2025, not yet issued
1357 Francisco StMiann Builderunit 1357 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition.
Details
Permit
202505096212

unit 1357 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition.

Open the permit page

Apr 25, 2025In progress
issued Aug 2025
831 27th StMarquez Builders2nd/fl- primary suite reconfigure bath and closet spaces, add rear facing window in bath. second bathroom replace tub with shower, replace fixtures and finishes. relocate skylight to be min 5 ft from property line. no work visible from street.
Details
Permit
202504255291
Permit issued
Aug 20, 2025

2nd/fl- primary suite reconfigure bath and closet spaces, add rear facing window in bath. second bathroom replace tub with shower, replace fixtures and finishes. relocate skylight to be min 5 ft from property line. no work visible from street.

Open the permit page

$27,000
Apr 10, 2025In progress
issued Aug 2025
1312 South Van Ness Avinterior remodel of all units. new decks under 30" above grade with sliding doors. reconfigure all 3 units including new bathrooms, new kitchens which will subsequently address. nov #202533278 and nov#202297858. all work at existing front building. infill light wells, replace front windows.
Details
Permit
202504104137
Permit issued
Aug 8, 2025

interior remodel of all units. new decks under 30" above grade with sliding doors. reconfigure all 3 units including new bathrooms, new kitchens which will subsequently address. nov #202533278 and nov#202297858. all work at existing front building. infill light wells, replace front windows.

Open the permit page

$129,000
Jan 23, 2025Completed
final sign-off Nov 2025
877 Carolina StCitywest Construction Inc.level 1: remodel (e) bathroom/closet into (n) steam room and sauna level 2: add pocket door in media room no structural work
Details
Permit
202501238915
Permit issued
Jul 10, 2025
Final sign-off
Nov 24, 2025

level 1: remodel (e) bathroom/closet into (n) steam room and sauna level 2: add pocket door in media room no structural work

Open the permit page

$13,500
Oct 3, 2024Completed
final sign-off Dec 2024
1567 Union StJavier Magana Construction Servicesadd island to kitchen at 2nd level. replace induction cooktop w/ gas range. install cabinet doors on (e) shelves above sink, convert (e) cabinet to drawers under sink area.
Details
Permit
202410032263
Permit issued
Oct 3, 2024
Final sign-off
Dec 30, 2024

add island to kitchen at 2nd level. replace induction cooktop w/ gas range. install cabinet doors on (e) shelves above sink, convert (e) cabinet to drawers under sink area.

Open the permit page

$8,700
Sep 6, 2024In progress
filed Sep 2024, not yet issued
3892 19th Streplace window with door to provide access to a (n) private roof deck over (e) garage facing street
Details
Permit
202409060297

replace window with door to provide access to a (n) private roof deck over (e) garage facing street

Open the permit page

$43,000
Jul 23, 2024In progress
issued Sep 2024
22 Jersey StMarquez Buildersinstall new elevator inside a new 1-hour rated elevator shaft enclosure
Details
Permit
202407237122
Permit issued
Sep 17, 2024

install new elevator inside a new 1-hour rated elevator shaft enclosure

Open the permit page

$31,500
Jun 6, 2024Completed
final sign-off Jun 2025
620 El Camino Del MarArrow Builders Increnovation of primary bedroom suite. add pocket door. enlarge closet. replace fireplace and lighting. add skylights.
Details
Permit
202406063874
Permit issued
Jun 24, 2024
Final sign-off
Jun 11, 2025

renovation of primary bedroom suite. add pocket door. enlarge closet. replace fireplace and lighting. add skylights.

Open the permit page

$43,000
Feb 29, 2024In progress
issued Mar 2024
831 27th StFlmc Development Corp Dba Adamo Campagnanotch and repair foundation to allow electrical service upgrae.
Details
Permit
202402296822
Permit issued
Mar 20, 2024

notch and repair foundation to allow electrical service upgrae.

Open the permit page

$1,000
Jan 19, 2024Completed
final sign-off Aug 2025
2762 Filbert StBeyond The Horizon Constructionrevision to approved bpa# 202206277164: to reduce bay window at rear. add (n) windows to resulting bay. (n) 10' fence at property lines at rear yard. 0.30 u factor.
Details
Permit
202401194292
Permit issued
Aug 19, 2024
Final sign-off
Aug 22, 2025

revision to approved bpa# 202206277164: to reduce bay window at rear. add (n) windows to resulting bay. (n) 10' fence at property lines at rear yard. 0.30 u factor.

Open the permit page

Oct 26, 2023In progress
issued Sep 2025
2300 Webster StFlmc Development Corp Dba Adamo Campagnacreat (n) parking space with fencing and curbcut
Details
Permit
202310269603
Permit issued
Sep 26, 2025

creat (n) parking space with fencing and curbcut

Open the permit page

$5,000
Aug 23, 2023Never finaled
issued Aug 2023, no final
3880 19th StCitadel Incinstall pre-fab hot tub in pit in rear yard. top of the hot tub to be level with existing grade.
Details
Permit
202308235097
Permit issued
Aug 31, 2023

install pre-fab hot tub in pit in rear yard. top of the hot tub to be level with existing grade.

Open the permit page

$5,250
Aug 11, 2023Never finaled
issued Sep 2023, no final
40 Sea View TrLevel 8 Construction Incnew landscaping at front and rear yards w/reduction of decks and (n) retaining walls, all modifications are under 36" of (e) grade
Details
Permit
202308114292
Permit issued
Sep 25, 2023

new landscaping at front and rear yards w/reduction of decks and (n) retaining walls, all modifications are under 36" of (e) grade

Open the permit page

$25,000
Jul 7, 2023In progress
issued Oct 2025
428 Collingwood StCitywest Construction Inc.reduce the existing roof deck & convert/expand the stair penthouse in order to add a 4th floor home office.
Details
Permit
202307071655
Permit issued
Oct 14, 2025

reduce the existing roof deck & convert/expand the stair penthouse in order to add a 4th floor home office.

Open the permit page

$200,000
May 23, 2023Completed
final sign-off Mar 2024
1567 Union Strevision to 202010206895- interior reconfigurarion of primary bath, family room, bath 1 & stairs. minor adjustments to front window size. new foundation at bedroom and family room. (no fixture count change)
Details
Permit
202305238417
Permit issued
Aug 22, 2023
Final sign-off
Mar 19, 2024

revision to 202010206895- interior reconfigurarion of primary bath, family room, bath 1 & stairs. minor adjustments to front window size. new foundation at bedroom and family room. (no fixture count change)

Open the permit page

Mar 31, 2023Completed
final sign-off May 2024
3880 19th StCitadel Increbuild surface of rear facade of both units due to water proofing deficiences on previous permit, rear facade-n architectural detailing, minor window & door adjustments, n windows/ doors, no change to interior layout or massing.
Details
Permit
202303314823
Permit issued
Jun 26, 2023
Final sign-off
May 13, 2024

rebuild surface of rear facade of both units due to water proofing deficiences on previous permit, rear facade-n architectural detailing, minor window & door adjustments, n windows/ doors, no change to interior layout or massing.

Open the permit page

$50,000
Mar 13, 2023Completed
final sign-off Dec 2024
38 Rossi AvFlmc Development Corp Dba Adamo Campagnarevision to bpa# 202210194741. reduce excavation and ceiling height of previoiusly permitted lower level. adjust stair location in rear yard under (e) deck.
Details
Permit
202303133577
Permit issued
Mar 23, 2023
Final sign-off
Dec 17, 2024

revision to bpa# 202210194741. reduce excavation and ceiling height of previoiusly permitted lower level. adjust stair location in rear yard under (e) deck.

Open the permit page

Jan 18, 2023Never finaled
filed Jan 2023, never issued
1312 South Van Ness Averect a 5 story, 3 family dwelling with no basement type iv-c
Details
Permit
202301180295

erect a 5 story, 3 family dwelling with no basement type iv-c

Open the permit page

$1,400,000
Jan 12, 2023Completed
final sign-off Feb 2023
1357 Francisco StGar-Cal Corporation2/f: relocation of laundry room (washer and dryer) in kitchen.
Details
Permit
202301120105
Permit issued
Jan 12, 2023
Final sign-off
Feb 1, 2023

2/f: relocation of laundry room (washer and dryer) in kitchen.

Open the permit page

$17,900
May 11, 2021In progress
issued Sep 2024
3271 Baker Sthorizontal expansion of the first and second floors towards the rear. vertical additon to add a 3rd floor consisting of (3) bedrooms and (2) bathrooms. relocate the ktchen to the rear of the 2nd floor. new roof deck and elevator.
Details
Permit
202105110154
Permit issued
Sep 23, 2024

horizontal expansion of the first and second floors towards the rear. vertical additon to add a 3rd floor consisting of (3) bedrooms and (2) bathrooms. relocate the ktchen to the rear of the 2nd floor. new roof deck and elevator.

Open the permit page

$600,000
Apr 22, 2021In progress
issued May 2025
1060 Fulton Stinterior remodel throughout w/ minor expansions under overhanging areas, (n) roof deck. nfpa 13-r fire sprinkler per cbc 903.1.1 shall be installed throughout bldg under seperate submittal.
Details
Permit
202104229137
Permit issued
May 27, 2025

interior remodel throughout w/ minor expansions under overhanging areas, (n) roof deck. nfpa 13-r fire sprinkler per cbc 903.1.1 shall be installed throughout bldg under seperate submittal.

Open the permit page

$275,000
Jun 29, 2020Never finaled
issued Jun 2023, no final
1314 Ocean AvBurke Constructionscope of work is to merge two commercial spaces in a non-sprinkler building. to remove wall between two spaces and refinish concrete floor. building change from b to a-2 occupancy. propose a 2nd exit at rear by utilize (e) easement to exit to public way. not a complete t.i.
Details
Permit
202006299332
Permit issued
Jun 21, 2023

scope of work is to merge two commercial spaces in a non-sprinkler building. to remove wall between two spaces and refinish concrete floor. building change from b to a-2 occupancy. propose a 2nd exit at rear by utilize (e) easement to exit to public way. not a complete t.i.

Open the permit page

$18,000