Danil Botoshansky
- Listed as
- architect, authorized agent-others, engineer
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Aug 2026
23 permits since 2000 (engineer on 20 permits, authorized agent-others on 2 permits, architect on 1 permit): 15 completed, 2 in progress, 4 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 17, 2026 | In progress filed Aug 2026, not yet issued | 1407 Dolores St | convert existing detached storage structure into new adu unit with an area of 580sq ft. no change in footprint or height. new plumbing and electrical per code. project is subject to ab112 all-electric ordinance.Details
convert existing detached storage structure into new adu unit with an area of 580sq ft. no change in footprint or height. new plumbing and electrical per code. project is subject to ab112 all-electric ordinance. | $150,000 | |
| Jul 21, 2025 | Completed final sign-off Mar 2026 | 18 Sanchez St | Ashbury Gen Constructing & Eng | revision to pa#'s 202404119828: relocate and remodel kitchens, remodel (e) bathroom and new master bathrooms. relocate laundries. covert 57 sq ft lightwell into new nook at 3/f. enlarge garage area at the g/f by recapturing 20 sq ft lightwell. new heat pump wh at g/f.Details
revision to pa#'s 202404119828: relocate and remodel kitchens, remodel (e) bathroom and new master bathrooms. relocate laundries. covert 57 sq ft lightwell into new nook at 3/f. enlarge garage area at the g/f by recapturing 20 sq ft lightwell. new heat pump wh at g/f. | |
| Apr 7, 2025 | In progress issued Apr 2025 | 158 Lake Merced Hill St South St | B&I Modernconstr.Inc/Dba Bi Qualty Pntng | demolish of kitchen cabinets. install new kitchen per layout. demo existing walls on the 1st floor between kichen and hallway. frame new floor about the entry.Details
demolish of kitchen cabinets. install new kitchen per layout. demo existing walls on the 1st floor between kichen and hallway. frame new floor about the entry. | $30,000 |
| Sep 4, 2024 | Completed final sign-off Mar 2026 | 3213 Folsom St | Simon & Brother Construction Inc | abate dcp 2023-007701enf. add one new adu in existing detached structure per govt code section 65852.2Details
abate dcp 2023-007701enf. add one new adu in existing detached structure per govt code section 65852.2 | $45,000 |
| Nov 7, 2023 | Completed final sign-off Aug 2024 | 534 Mississippi St | revision to pa 2023-0427-6568 3 sliding window on garden; move kitchen and bathroom.Details
revision to pa 2023-0427-6568 3 sliding window on garden; move kitchen and bathroom. | $10,000 | |
| Jun 20, 2023 | Completed final sign-off Dec 2023 | 380 Dolores St | L T Energy Construction Solutions Inc | revision to pa# 202207128253: add 1 bathroom to unit 1Details
revision to pa# 202207128253: add 1 bathroom to unit 1 | $10,000 |
| May 12, 2023 | Never finaled issued May 2023, no final | 4238 21st St | demo extg partition wall between kitchen and dining room, create opening for new window on the eastern wall, match exterior trim to existing.Details
demo extg partition wall between kitchen and dining room, create opening for new window on the eastern wall, match exterior trim to existing. | $23,000 | |
| Apr 5, 2023 | Completed final sign-off Dec 2023 | 380 Dolores St | L T Energy Construction Solutions Inc | unit# 3: revision to pa# 202207128253, add 1 bathroom. revision to permit 202207128253 to correct violation 2021-011257enf.Details
unit# 3: revision to pa# 202207128253, add 1 bathroom. revision to permit 202207128253 to correct violation 2021-011257enf. | $5,000 |
| Jul 12, 2022 | Completed final sign-off Dec 2023 | 380 Dolores St | L T Energy Construction Solutions Inc | to comply with nov 202182395 and planning complaint 2021-011257enf. separate 2 units (unit 1 & unit 3) combined into 1 unit. install kitchen in unit #3 and lights and outlets per code.Details
to comply with nov 202182395 and planning complaint 2021-011257enf. separate 2 units (unit 1 & unit 3) combined into 1 unit. install kitchen in unit #3 and lights and outlets per code. | $35,000 |
| Jun 8, 2022 | Expired or cancelled suspend Aug 2022 | 225 Farallones St | Global Arch Construction Inc | 2nd fl renovation: relocate living room, dining room, and kitchen. add laundry, master bedroom with bathroom per plan. new water heater. back cottage renovation: relocate (e) bathroom in the (e) bedroom. add laundry, remodel kitchen.Details
2nd fl renovation: relocate living room, dining room, and kitchen. add laundry, master bedroom with bathroom per plan. new water heater. back cottage renovation: relocate (e) bathroom in the (e) bedroom. add laundry, remodel kitchen. | $350,000 |
| Feb 10, 2022 | Completed final sign-off Nov 2023 | 293 Connecticut St | Strong Builders Construction Inc. | the purpose of this permit is to provide interior renovation to 2 extg units: 293 connecticut and 1426 18th st including 2 renovated kitchens. renovated bathrooms, new bathrooms and bedrooms, various mep/ structural. no change to condiioned area or street facing exterior.Details
the purpose of this permit is to provide interior renovation to 2 extg units: 293 connecticut and 1426 18th st including 2 renovated kitchens. renovated bathrooms, new bathrooms and bedrooms, various mep/ structural. no change to condiioned area or street facing exterior. | $50,000 |
| Oct 19, 2021 | Completed final sign-off Oct 2022 | 1426 18th St | change of use from existing vacant office to new specialty grocery in existing ground fl commercial space. renovate (e) restroom.Details
change of use from existing vacant office to new specialty grocery in existing ground fl commercial space. renovate (e) restroom. | $55,000 | |
| Mar 25, 2021 | Completed final sign-off Aug 2021 | 777 Noriega St | Global Arch Construction Inc | new exercise room with bathroom at lower level floor.Details
new exercise room with bathroom at lower level floor. | $40,000 |
| Dec 10, 2020 | Expired or cancelled cancelled Jan 2026 | 816 Victoria St | Global Arch Construction Inc | existing patio conversion into new sunroom.Details
existing patio conversion into new sunroom. | $10,000 |
| Jul 30, 2018 | Completed final sign-off Sep 2018 | 777 Noriega St | A K Home Improvement Inc | to comply with nov#201874493, revision to 201805290311, build new concrete wallDetails
to comply with nov#201874493, revision to 201805290311, build new concrete wall | $1,800 |
| Jul 15, 2016 | Never finaled issued Jul 2016, no final | 835 Darien Wy | Techpro Builders Inc | revision to pa 201604013742 - reinforcement of (e) foundation per plan.Details
revision to pa 201604013742 - reinforcement of (e) foundation per plan. | $18,000 |
| Mar 3, 2016 | Completed final sign-off Sep 2016 | 784 Spruce St | extending the current office into the garage area. add an entertainment room to the office. there is one toilet & sink,in the current office,install also a bike rack to the garage.Details
extending the current office into the garage area. add an entertainment room to the office. there is one toilet & sink,in the current office,install also a bike rack to the garage. | $20,000 | |
| Dec 11, 2014 | Never finaled issued Feb 2015, no final | 568 Hayes St | Strong Builders Construction Inc. | voluntary structural foundation strengthening in basement. no other work.Details
voluntary structural foundation strengthening in basement. no other work. | $75,000 |
| Aug 8, 2014 | Never finaled issued Oct 2014, no final | 4302 17th St | Jerimiah F Deasy/General Contractor | replacement and construction of concrete retaining wall. approx. 28'-0" long.Details
replacement and construction of concrete retaining wall. approx. 28'-0" long. | $10,000 |
| Aug 7, 2014 | Completed final sign-off Feb 2015 | 736 44th Av | A K General | change ceiling beam and post to beam, resting on another beam, supported by two posts.Details
change ceiling beam and post to beam, resting on another beam, supported by two posts. | $2,000 |
| Jul 22, 2014 | Completed final sign-off Sep 2015 | 1630 32nd Av | Peng Fei Tan | garage door widening and push garage door inside & higher, add separate wall in garage area, add decorative balcony & kitchen remodel.Details
garage door widening and push garage door inside & higher, add separate wall in garage area, add decorative balcony & kitchen remodel. | $5,000 |
| Dec 12, 2013 | Completed final sign-off Feb 2015 | 736 44th Av | A K General | work @ 736 only. install hydronic heat. install laminate floor. insulate exterior wall on the inside. remodel bathrooms, remodel kitchen, new concrete slab on ground level. new stairs inside 1st level to ground level, remove wall between kitchen & living room. no exterior work, no windows.Details
work @ 736 only. install hydronic heat. install laminate floor. insulate exterior wall on the inside. remodel bathrooms, remodel kitchen, new concrete slab on ground level. new stairs inside 1st level to ground level, remove wall between kitchen & living room. no exterior work, no windows. | $57,250 |
| Jun 28, 2000 | Completed final sign-off Aug 2000 | 2201 Fillmore St | remove extg low partition counter within food serving area to comply with complaintDetails
remove extg low partition counter within food serving area to comply with complaint | $800 |