L T Energy Construction Solutions Inc
- Based in
- Groveland
- On San Francisco permits
- Oct 2016 to Jun 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2023 | Completed final sign-off Dec 2023 | 380 Dolores St | revision to pa# 202207128253: add 1 bathroom to unit 1Details
revision to pa# 202207128253: add 1 bathroom to unit 1 | $10,000 |
| Apr 5, 2023 | Completed final sign-off Dec 2023 | 380 Dolores St | unit# 3: revision to pa# 202207128253, add 1 bathroom. revision to permit 202207128253 to correct violation 2021-011257enf.Details
unit# 3: revision to pa# 202207128253, add 1 bathroom. revision to permit 202207128253 to correct violation 2021-011257enf. | $5,000 |
| Jul 12, 2022 | Completed final sign-off Dec 2023 | 380 Dolores St | to comply with nov 202182395 and planning complaint 2021-011257enf. separate 2 units (unit 1 & unit 3) combined into 1 unit. install kitchen in unit #3 and lights and outlets per code.Details
to comply with nov 202182395 and planning complaint 2021-011257enf. separate 2 units (unit 1 & unit 3) combined into 1 unit. install kitchen in unit #3 and lights and outlets per code. | $35,000 |
| Jun 24, 2022 | Never finaled issued Aug 2022, no final | 2534 19th Av | revision to pa# 202202258785. 1st fl: total reconfigure layout. new retaining wall at the yard.Details
revision to pa# 202202258785. 1st fl: total reconfigure layout. new retaining wall at the yard. | $5,000 |
| Feb 25, 2022 | Never finaled issued May 2022, no final | 2534 19th Av | 1st fl: add family room, 1 bedroom, sauna, 1 full bath & laundry. 2nd fl: remodel kitchen, bathroom, add full bath. relocate interior stairs.Details
1st fl: add family room, 1 bedroom, sauna, 1 full bath & laundry. 2nd fl: remodel kitchen, bathroom, add full bath. relocate interior stairs. | $150,000 |
| Mar 11, 2020 | Completed final sign-off Mar 2020 | 3510 26th St | replace steps and risers (50% or less). some materials (wood to wood)Details
replace steps and risers (50% or less). some materials (wood to wood) | $350 |
| Sep 3, 2019 | Completed final sign-off Dec 2019 | 2987 Mission St | all work in unit # 301: bathroom remodeling (nostructural work) all walls stay in place.Details
all work in unit # 301: bathroom remodeling (nostructural work) all walls stay in place. | $15,000 |
| Jun 19, 2019 | Completed final sign-off Oct 2019 | 2154 14th Av | remodel existing (2) bathrooms (5' x 8' each). remodel kitchen area, including flooring area in dining rooms (15' x 8').Details
remodel existing (2) bathrooms (5' x 8' each). remodel kitchen area, including flooring area in dining rooms (15' x 8'). | $20,000 |
| Dec 12, 2018 | Completed final sign-off Mar 2021 | 272 Dalewood Wy | to comply with nov 201887122 to legalize layout at basement level which includes re-configuring of bathroom, addition of bedroom, building of wooden staircase @ exterior, relocation of water heater and furnaceDetails
to comply with nov 201887122 to legalize layout at basement level which includes re-configuring of bathroom, addition of bedroom, building of wooden staircase @ exterior, relocation of water heater and furnace | $5,000 |
| Aug 21, 2018 | Expired or cancelled expired Nov 2022 | 58 Rondel Pl | seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit for 2016 cebc appendix a4. revision to pa# 201508053444Details
seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit for 2016 cebc appendix a4. revision to pa# 201508053444 | |
| Jun 22, 2018 | Completed final sign-off Nov 2018 | 228 Lake Merced Hill No Bl | remodel downstair gameroom with wetbar, build new office at gr fl, new bathroomDetails
remodel downstair gameroom with wetbar, build new office at gr fl, new bathroom | $25,000 |
| Oct 10, 2017 | Completed final sign-off Dec 2017 | 1983 20th Av | kitchen remodel, replace (e) cabinets, install new counter top in same location.Details
kitchen remodel, replace (e) cabinets, install new counter top in same location. | $8,000 |
| Oct 6, 2016 | Completed final sign-off May 2018 | 339 Oak Park Dr | remodeling (e) kitchen. install new lights. remodeling 2 bathrooms, no change on walls.Details
remodeling (e) kitchen. install new lights. remodeling 2 bathrooms, no change on walls. | $35,000 |