Back to kitchen remodel contractors
L T Energy Construction Solutions Inc
- Based in
- Groveland
- On San Francisco permits
- Oct 2016 to Jun 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2022 | Completed final sign-off Dec 2023 | 380 Dolores St | to comply with nov 202182395 and planning complaint 2021-011257enf. separate 2 units (unit 1 & unit 3) combined into 1 unit. install kitchen in unit #3 and lights and outlets per code.Details
to comply with nov 202182395 and planning complaint 2021-011257enf. separate 2 units (unit 1 & unit 3) combined into 1 unit. install kitchen in unit #3 and lights and outlets per code. | $35,000 |
| Feb 25, 2022 | Never finaled issued May 2022, no final | 2534 19th Av | 1st fl: add family room, 1 bedroom, sauna, 1 full bath & laundry. 2nd fl: remodel kitchen, bathroom, add full bath. relocate interior stairs.Details
1st fl: add family room, 1 bedroom, sauna, 1 full bath & laundry. 2nd fl: remodel kitchen, bathroom, add full bath. relocate interior stairs. | $150,000 |
| Jun 19, 2019 | Completed final sign-off Oct 2019 | 2154 14th Av | remodel existing (2) bathrooms (5' x 8' each). remodel kitchen area, including flooring area in dining rooms (15' x 8').Details
remodel existing (2) bathrooms (5' x 8' each). remodel kitchen area, including flooring area in dining rooms (15' x 8'). | $20,000 |
| Oct 10, 2017 | Completed final sign-off Dec 2017 | 1983 20th Av | kitchen remodel, replace (e) cabinets, install new counter top in same location.Details
kitchen remodel, replace (e) cabinets, install new counter top in same location. | $8,000 |
| Oct 6, 2016 | Completed final sign-off May 2018 | 339 Oak Park Dr | remodeling (e) kitchen. install new lights. remodeling 2 bathrooms, no change on walls.Details
remodeling (e) kitchen. install new lights. remodeling 2 bathrooms, no change on walls. | $35,000 |