Tracy A Wong
- License
- C25234
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C25234 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Des Architects Engineers
- Based in
- Redwood City
- On San Francisco permits
- Apr 2005 to Feb 2022
9 permits since 2000 (architect on 7 permits, engineer on 2 permits): 9 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Novo Construction Inc (4), Level 10 Construction Lp (3), Turner Construction Co
- Engineers
- Joseph Fay, Juan Francisco Orosco, Michael Andrew Hynding, Patrick H. Chow, Raymond Shahabi, Rudolfo P Bustos Iii, Selinda Avenenti Martinez, Thomas Parrish
- Authorized agents
- Jacob Christie
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 9
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2022 | Completed final sign-off Mar 2022 | 215 Fremont St | Novo Construction Inc | fire only evacuation maps 6th floor.Details
fire only evacuation maps 6th floor. | $1,000 |
| Dec 10, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | 6/f: rev to pa202101273406: updates including exiting plan, room names, rcp update, ceilinghts and conf room dimension changes.Details
6/f: rev to pa202101273406: updates including exiting plan, room names, rcp update, ceilinghts and conf room dimension changes. | $2,500 |
| Jan 27, 2021 | Completed final sign-off Jul 2022 | 215 Fremont St | Novo Construction Inc | level 6 t.i: update lobby, core/shell restrooms, conference rooms, library and micro kitchen. demolition under separate permit.Details
level 6 t.i: update lobby, core/shell restrooms, conference rooms, library and micro kitchen. demolition under separate permit. | $10,000,000 |
| Jan 19, 2021 | Completed final sign-off Jul 2022 | 215 Fremont St | Novo Construction Inc | 6/f: demo of (e) walls, safe-off of mep. removal of glass, millwork, celing grid and hard lid.Details
6/f: demo of (e) walls, safe-off of mep. removal of glass, millwork, celing grid and hard lid. | $300,000 |
| Feb 7, 2017 | Completed final sign-off Jun 2017 | 4 Embarcadero Center | Level 10 Construction Lp | suite 36 - enclosing existing plan room #3621 in previousl permitted project by adding one partition wall & 1 set of sliding telescoping glass doors; modifying (e) ceiling grid, changing ceiling tiles; replacing two lay-in light fixtures and added (2) wall mounted light fixtures. n/a maherDetails
suite 36 - enclosing existing plan room #3621 in previousl permitted project by adding one partition wall & 1 set of sliding telescoping glass doors; modifying (e) ceiling grid, changing ceiling tiles; replacing two lay-in light fixtures and added (2) wall mounted light fixtures. n/a maher | $70,000 |
| Nov 27, 2013 | Completed final sign-off Jun 2014 | 717 Market St | Turner Construction Co | tenant improvements, 1 small ti closet, furniture, 1 small split unit for ac. electrical outlets. 4th fl, partition 3rd floor.Details
tenant improvements, 1 small ti closet, furniture, 1 small split unit for ac. electrical outlets. 4th fl, partition 3rd floor. | $250,000 |
| May 15, 2012 | Completed final sign-off Oct 2012 | 4 Embarcadero Center | Level 10 Construction Lp | 36th floor tenant improvement for office space which includes creating 16 offices, one large conference room, & a few accessory rooms with finish upgrades throughout.Details
36th floor tenant improvement for office space which includes creating 16 offices, one large conference room, & a few accessory rooms with finish upgrades throughout. | $963,000 |
| Apr 23, 2012 | Completed final sign-off Oct 2012 | 4 Embarcadero Center | Level 10 Construction Lp | 36th floor demolition of partitions, doors, casework, sinks where occurs at break rooms, ceiling w/lights, diffusers, accessories, floor finish throughout, see sheet d2-01. per ab-017, space remain vacant.Details
36th floor demolition of partitions, doors, casework, sinks where occurs at break rooms, ceiling w/lights, diffusers, accessories, floor finish throughout, see sheet d2-01. per ab-017, space remain vacant. | $24,000 |
| Apr 1, 2005 | Completed final sign-off May 2005 | 3040 Taraval St | to comply w/nov #200503167613, revision to 200503248345, install 1hr parapet to protect roof openingDetails
to comply w/nov #200503167613, revision to 200503248345, install 1hr parapet to protect roof opening | $2,500 |