Reza Khoshnevisan
- Listed as
- architect, attorney, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Sia Consulting Corp.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2022
279 permits since 2000 (engineer on 183 permits, architect on 88 permits, authorized agent-others on 9 permits, designer on 3 permits, attorney on 1 permit, pmt consultant/expediter on 1 permit): 179 completed, 2 in progress, 35 never finaled, 63 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 279.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2022 | Never finaled filed Aug 2022, never issued | 345 06th St | Area Development Inc. | conversion of commercial space to residential unit (adu).Details
conversion of commercial space to residential unit (adu). | $15,000 |
| Jun 24, 2022 | In progress issued Mar 2025 | 1354 York St | Area Development Inc. | to erect 4 stories, no basement, type v-a, 3 units residential building.Details
to erect 4 stories, no basement, type v-a, 3 units residential building. | $900,000 |
| Jun 24, 2022 | In progress issued Mar 2025 | 1356 York St | Area Development Inc. | to erect 4 stories, no basement, type v-a, 3 units residential building.Details
to erect 4 stories, no basement, type v-a, 3 units residential building. | $900,000 |
| Jan 31, 2022 | Never finaled issued Feb 2022, no final | 1655 La Salle Av | Area Development Inc. | retrofit foundation. ref adu pa# 202001212359.Details
retrofit foundation. ref adu pa# 202001212359. | $20,000 |
| Sep 28, 2021 | Expired or cancelled cancelled Oct 2024 | 4758 Mission St | Area Development Inc. | proposed interior remodeling of (e) 3-story over basement building to accomodate (8) (n) residential units. all work to be performed within (e) boundary of the building.Details
proposed interior remodeling of (e) 3-story over basement building to accomodate (8) (n) residential units. all work to be performed within (e) boundary of the building. | $1,200,000 |
| Sep 4, 2020 | Completed final sign-off Apr 2021 | 2578 Sutter St | restore original double-hung wdw @ 2/f centered above front entr, wndw to match original size/shape (w/segmental arch @ top) & returned to original location. restore all wndws w/all wood double-hung w/integral ogee lugs. current installed wndws do not meet city planning window replacement standardsDetails
restore original double-hung wdw @ 2/f centered above front entr, wndw to match original size/shape (w/segmental arch @ top) & returned to original location. restore all wndws w/all wood double-hung w/integral ogee lugs. current installed wndws do not meet city planning window replacement standards | $15,000 | |
| Aug 25, 2020 | Completed final sign-off Nov 2020 | 363 06th St | Area Development Inc. | revision to mech #2017 0228 0331 s4 for fire dept to review.Details
revision to mech #2017 0228 0331 s4 for fire dept to review. | |
| Feb 20, 2019 | Completed final sign-off Sep 2019 | 170 Yukon St | install non-structural 63"x12x12" concrete grade beam at 180's north wall; install non-structural 63"x72" 1 hr fire rated wall assembly at north wall above; install non-structural 63"x92" 1 hr fire rated wall assembly at north wall aboveDetails
install non-structural 63"x12x12" concrete grade beam at 180's north wall; install non-structural 63"x72" 1 hr fire rated wall assembly at north wall above; install non-structural 63"x92" 1 hr fire rated wall assembly at north wall above | $600 | |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 750 Harrison St | emergency evacuation signs at 750 harrison st. all floors.Details
emergency evacuation signs at 750 harrison st. all floors. | $500 | |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 1335 Folsom St | Area Development Inc. | revision to approve bpa #201406269545 to comply with storm water control requirementDetails
revision to approve bpa #201406269545 to comply with storm water control requirement | |
| Oct 26, 2017 | Completed final sign-off Oct 2019 | 2510 Folsom St | Area Development Inc. | proposed addition of two studio,(2) two bedroom units as adu per ordiance #162-16 at first floor. all work to be performed with (e) boundary of the bldgDetails
proposed addition of two studio,(2) two bedroom units as adu per ordiance #162-16 at first floor. all work to be performed with (e) boundary of the bldg | $150,000 |
| Sep 15, 2017 | Expired or cancelled withdrawn Apr 2019 | 599 Naples St | (rear building). to convert garage / exercise room to a new 3 bedrooms & 2.5 bath dwelling unit.Details
(rear building). to convert garage / exercise room to a new 3 bedrooms & 2.5 bath dwelling unit. | $35,000 | |
| Sep 5, 2017 | Expired or cancelled cancelled Nov 2025 | 1450 Howard St | erect (n) 6-story residential & commercial building.Details
erect (n) 6-story residential & commercial building. | $1,900,000 | |
| Feb 28, 2017 | Completed final sign-off Nov 2020 | 363 06th St | Area Development Inc., Crime Watch Security Sys Llc | to erect 9 stories, no basement, type i-a, 104 residential units wtih commercial & garage building. ** maher: yes. please route to dph **Details
to erect 9 stories, no basement, type i-a, 104 residential units wtih commercial & garage building. ** maher: yes. please route to dph ** | $7,000,000 |
| Dec 16, 2016 | Never finaled issued Mar 2017, no final | 1335 Folsom St | Area Development Inc. | to demolish 1 story of a commercial manufacturing bldgDetails
to demolish 1 story of a commercial manufacturing bldg | $15,000 |
| Oct 5, 2016 | Completed final sign-off Oct 2020 | 345 06th St | Area Development Inc. | demolish of one story storage builing in parking lot.Details
demolish of one story storage builing in parking lot. | $10,000 |
| May 17, 2016 | Completed final sign-off Nov 2016 | 750 Harrison St | Area Development Inc. | to demolish 1 story club building. ** maher: n/a **Details
to demolish 1 story club building. ** maher: n/a ** | $8,000 |
| Feb 17, 2016 | Completed final sign-off Nov 2020 | 345 06th St | Area Development Inc., Crime Watch Security Sys Llc | to erect 9-story, 102 dwelling units apartment, parking, retail, mix use building. n/a for maher ordinance no.155-13.Details
to erect 9-story, 102 dwelling units apartment, parking, retail, mix use building. n/a for maher ordinance no.155-13. | $6,000,000 |
| Jul 27, 2015 | Completed final sign-off Mar 2016 | 280 Brighton Av | fire sprinkler 332 heads. pa# 2013-08-30-5729.Details
fire sprinkler 332 heads. pa# 2013-08-30-5729. | $10,000 | |
| Jul 15, 2015 | Completed final sign-off Jul 2016 | 480 Potrero Av | administrative correction to clarify residential unit count from 77 to 75 per r-1 drawings, 201306250465 sDetails
administrative correction to clarify residential unit count from 77 to 75 per r-1 drawings, 201306250465 s | ||
| Mar 3, 2015 | Never finaled issued Oct 2015, no final | 2059 Golden Gate Av | proposed conversion of (e) storage to conditioned living space at first floor. relocate unit #1 from 2nd flr to 1st floor, enlarge unit #2. all work to be performed within (e) boundary of the buildingDetails
proposed conversion of (e) storage to conditioned living space at first floor. relocate unit #1 from 2nd flr to 1st floor, enlarge unit #2. all work to be performed within (e) boundary of the building | $25,000 | |
| Feb 25, 2015 | Completed final sign-off Nov 2017 | 1637 Hyde St | legalization of groud floor unit #7 - per ordinance 43-14. removal of rear stairs at 2nd floor.Details
legalization of groud floor unit #7 - per ordinance 43-14. removal of rear stairs at 2nd floor. | $5,000 | |
| Dec 1, 2014 | Completed final sign-off Feb 2018 | 50 Lucky St | O Donoghue Construction Inc. | construct (n) 4-story single family dwelling residence.Details
construct (n) 4-story single family dwelling residence. | $800,000 |
| Dec 1, 2014 | Completed final sign-off Apr 2020 | 50 Lucky St | O Donoghue Construction Inc. | demolish (e) garage/storage.Details
demolish (e) garage/storage. | $10,000 |
| Dec 1, 2014 | Completed final sign-off Feb 2018 | 2877 Folsom St | proposed horizontal & vertical addition to (e) 2-story 2-unit building to accomodate additional habitable space.Details
proposed horizontal & vertical addition to (e) 2-story 2-unit building to accomodate additional habitable space. | $600,000 | |
| Oct 28, 2014 | Completed final sign-off Oct 2016 | 2059 Golden Gate Av | Ampex Engineering & Co | revision to appl #2013.0403.3663. 1. floor plans modification at unit #3, unit #4 and unit #5 per plan. 2. add two new dormers at roof as per plan. entire building to be sprinklered per nfpa-13 under a separate permit.Details
revision to appl #2013.0403.3663. 1. floor plans modification at unit #3, unit #4 and unit #5 per plan. 2. add two new dormers at roof as per plan. entire building to be sprinklered per nfpa-13 under a separate permit. | $150,000 |
| Oct 21, 2014 | Completed final sign-off Jan 2015 | 453 Hayes St | Ampex Engineering & Co | revision to comply with complaint 201497811. windows, accessibility and roof deck. proposed revision to approved bpa# 200710185839 under original address, 350 linden street, block 0817, lot 089.Details
revision to comply with complaint 201497811. windows, accessibility and roof deck. proposed revision to approved bpa# 200710185839 under original address, 350 linden street, block 0817, lot 089. | |
| Oct 15, 2014 | Completed final sign-off Oct 2018 | 1560 Dolores St | horizontal & vertical addition to existing single family home, one addition unit @ third and four floor.Details
horizontal & vertical addition to existing single family home, one addition unit @ third and four floor. | $500,000 | |
| Oct 14, 2014 | Completed final sign-off Nov 2014 | 65 Prosper St | H T H Construction | revision to appl #2013.0618.9877 to install railing @ north side of 2nd & 3rd floor roof decks. all work to be with (e) boundry of bldg.Details
revision to appl #2013.0618.9877 to install railing @ north side of 2nd & 3rd floor roof decks. all work to be with (e) boundry of bldg. | |
| Sep 10, 2014 | Completed final sign-off Feb 2016 | 3368 22nd St | revision to 201406279887 to add new garage lift at existing 2 unit building.no expansion of building.wood panel garage door.as built revision per plan.Details
revision to 201406279887 to add new garage lift at existing 2 unit building.no expansion of building.wood panel garage door.as built revision per plan. | $100,000 | |
| Sep 9, 2014 | Completed final sign-off Jan 2016 | 2060 Great Hy | interior remodel @ kitchen and reduction of southern lightwell @ 2 stories.Details
interior remodel @ kitchen and reduction of southern lightwell @ 2 stories. | $75,000 | |
| Jun 30, 2014 | Completed final sign-off Jul 2015 | 412 Murray St | interior remodel of two units as follows: #414, adjustment of floor plan and full remodel as per plan. at #412, adjustment of floor plan at main level and connection of lower level storage area to habitable space in conjunction w/main level. partial foundation replacement/structural work per plan.Details
interior remodel of two units as follows: #414, adjustment of floor plan and full remodel as per plan. at #412, adjustment of floor plan at main level and connection of lower level storage area to habitable space in conjunction w/main level. partial foundation replacement/structural work per plan. | $225,000 | |
| Jun 27, 2014 | Completed final sign-off Feb 2016 | 3368 22nd St | interior remodel, floor plan adjustment & conversion of basement area to condiitoned space including one bath, three bedrooms, new stair @ rear & seismic upgrade. all work to be confined to existing boundary of the bldg.Details
interior remodel, floor plan adjustment & conversion of basement area to condiitoned space including one bath, three bedrooms, new stair @ rear & seismic upgrade. all work to be confined to existing boundary of the bldg. | $500,000 | |
| May 30, 2014 | Completed final sign-off Feb 2019 | 1532 Howard St | S F Bay Construction Inc | erect 6-story, no basement, type 1, 15 dwelling units building. compliance w/ ordinance no. 155-13 not required.Details
erect 6-story, no basement, type 1, 15 dwelling units building. compliance w/ ordinance no. 155-13 not required. | $1,500,000 |
| May 30, 2014 | Completed final sign-off Oct 2017 | 4126 17th St | Ampex Engineering & Co | (rear building) to erect 2 storie, 1 basement, single family dwelling.Details
(rear building) to erect 2 storie, 1 basement, single family dwelling. | $150,000 |
| May 30, 2014 | Completed final sign-off Sep 2017 | 1532 Howard St | S F Bay Construction Inc | demolish one story commercial restaurant. compliance w/ ordinance no. 155-13 not required.Details
demolish one story commercial restaurant. compliance w/ ordinance no. 155-13 not required. | $35,000 |
| May 21, 2014 | Completed final sign-off Mar 2019 | 985 Powhattan Av | erect 2 stories, 1 basement, type 5, single family dwelling building.Details
erect 2 stories, 1 basement, type 5, single family dwelling building. | $350,000 | |
| May 21, 2014 | Completed final sign-off Mar 2019 | 40 Bernal Heights Bl | erect 2 stories, 1 basement, type 5, single family dwelling building.Details
erect 2 stories, 1 basement, type 5, single family dwelling building. | $350,000 | |
| May 21, 2014 | Completed final sign-off Mar 2019 | 1025 Powhattan Av | erect 2 stories, 1 basement, type 5, single family dwelling building.Details
erect 2 stories, 1 basement, type 5, single family dwelling building. | $350,000 | |
| May 21, 2014 | Completed final sign-off Mar 2019 | 965 Powhattan Av | erect 2 stories, 1 basement, type 5, single family dwelling building.Details
erect 2 stories, 1 basement, type 5, single family dwelling building. | $350,000 | |
| May 8, 2014 | Completed final sign-off Oct 2024 | 2420 03rd St | Ampex Engineering & Co | erect 4 stories , 9 dwelling units,. and retail. type iiia building.Details
erect 4 stories , 9 dwelling units,. and retail. type iiia building. | $1,000,000 |
| May 8, 2014 | Completed final sign-off Jan 2017 | 1501 Folsom St | O Donoghue Construction Inc. | proposed interior remodel at first and second floors. proposed vertical addition to add a roof top restaurant and a roof deck. maher-compliance with ordinance no. 155-13 not required.Details
proposed interior remodel at first and second floors. proposed vertical addition to add a roof top restaurant and a roof deck. maher-compliance with ordinance no. 155-13 not required. | $500,000 |
| May 1, 2014 | Completed final sign-off Jun 2014 | 47 Prospect Av | Occidental Express | partial compliance w/nov #201306912 & 201451931 - removal of unpermitted deck at rear of property. (legalizing of retaining walls under separate permit)Details
partial compliance w/nov #201306912 & 201451931 - removal of unpermitted deck at rear of property. (legalizing of retaining walls under separate permit) | $2,500 |
| Apr 24, 2014 | Expired or cancelled expired Mar 2023 | 2615 Sutter St | Ampex Engineering & Co | proposed horizontal & vertical addition. new family room & bedroom at rear of 1st flr. interior remodel & new addition on 2nd flr (at rear) & 3rd flr (rear) new habitable space on 4th flr with proposed roof deck.Details
proposed horizontal & vertical addition. new family room & bedroom at rear of 1st flr. interior remodel & new addition on 2nd flr (at rear) & 3rd flr (rear) new habitable space on 4th flr with proposed roof deck. | $500,000 |
| Mar 24, 2014 | Completed final sign-off May 2016 | 1123 Folsom St | upgrade existing doors and windows to fire rating perm plans. 90 mins fire door and 45 mins fire window. this is not a tenant improvement work.Details
upgrade existing doors and windows to fire rating perm plans. 90 mins fire door and 45 mins fire window. this is not a tenant improvement work. | $5,000 | |
| Feb 10, 2014 | Completed final sign-off Feb 2014 | 4631 Balboa St | O Donoghue Construction Inc. | proposed revisoin to approved pa #2013.0626.0539 & 2014.01.16.6432 to reflect as built condition @4631 balboa - to show foundation & framing plan.Details
proposed revisoin to approved pa #2013.0626.0539 & 2014.01.16.6432 to reflect as built condition @4631 balboa - to show foundation & framing plan. | |
| Jan 29, 2014 | Completed final sign-off Jan 2015 | 221 Craut St | San Francisco Developers | proposed new batroom & laundry closet at garage level. all work to be performed within the boundary of existing building.Details
proposed new batroom & laundry closet at garage level. all work to be performed within the boundary of existing building. | $20,000 |
| Jan 28, 2014 | Completed final sign-off Jun 2016 | 615 Minna St | interior remodel and change in floor layout of 4 unit building with 4 guest room as per plan. proposed voluntary structural upgrade. reduction of size of both lightwell. maher ordinance not applicable, no disturbance of at least 50 cu yd of soil.Details
interior remodel and change in floor layout of 4 unit building with 4 guest room as per plan. proposed voluntary structural upgrade. reduction of size of both lightwell. maher ordinance not applicable, no disturbance of at least 50 cu yd of soil. | $150,000 | |
| Jan 24, 2014 | Completed final sign-off Sep 2015 | 237 Shipley St | North Tipp Construction | demo 1 story storage bldg. ** maher: compliance with ordinance no# 155-13 not required **Details
demo 1 story storage bldg. ** maher: compliance with ordinance no# 155-13 not required ** | $5,000 |
| Jan 24, 2014 | Completed final sign-off Apr 2017 | 237 Shipley St | O Donoghue Construction Inc. | to erect 4 stories, no basement, 21 units multi family residential buidling. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect 4 stories, no basement, 21 units multi family residential buidling. ** maher: compliance with ordinance no# 155-13 not required ** | $1,000,000 |
| Jan 23, 2014 | Completed final sign-off Feb 2014 | 126 Bronte St | O Donoghue Construction Inc. | partial replacement of existing retaining wall.Details
partial replacement of existing retaining wall. | $10,000 |
| Jan 22, 2014 | Completed final sign-off May 2014 | 430 Noriega St | A B J Construction | revision to appl #2013.1105.1180 for use of shotcrete.Details
revision to appl #2013.1105.1180 for use of shotcrete. | |
| Jan 16, 2014 | Completed final sign-off Feb 2014 | 4631 Balboa St | O Donoghue Construction Inc. | proposed interior remodel to convert garage space to storage, all within the (e) bldg. boundary.Details
proposed interior remodel to convert garage space to storage, all within the (e) bldg. boundary. | $1,000 |
| Nov 8, 2013 | Completed final sign-off Dec 2015 | 298 Alabama St | proposed subdivision of the existing commercial space (warehouse) to four new spaces & adding disabled access bathrooms. all works to be performed within existing boundary of the bldg with no change in occupancy group. space remaining vacant.Details
proposed subdivision of the existing commercial space (warehouse) to four new spaces & adding disabled access bathrooms. all works to be performed within existing boundary of the bldg with no change in occupancy group. space remaining vacant. | $200,000 | |
| Nov 5, 2013 | Completed final sign-off Mar 2016 | 778 Vallejo St | proposed conversion of (e) storage to condition livings space to accomadate one additional unit @ 1st & 2nd flr. proposed in fill of (e) two side ligh wells. proposed kitchen & bathrooms remodeling at 3rd floor unit and 4th floor unit.Details
proposed conversion of (e) storage to condition livings space to accomadate one additional unit @ 1st & 2nd flr. proposed in fill of (e) two side ligh wells. proposed kitchen & bathrooms remodeling at 3rd floor unit and 4th floor unit. | $300,000 | |
| Oct 21, 2013 | Never finaled issued May 2016, no final | 233 States St | rear bldg. erect 4-story, 1 unit, type 5, residential building.Details
rear bldg. erect 4-story, 1 unit, type 5, residential building. | $350,000 | |
| Oct 21, 2013 | Never finaled issued Feb 2016, no final | 22 Ord Ct | Bc United Construction Inc | horizontal additon to front bldg. proposed horizontal additon to an existing single family home. there is new storage at 1/fl, new living room, dining room, 3 new bedrooms & 2 bathrooms added.Details
horizontal additon to front bldg. proposed horizontal additon to an existing single family home. there is new storage at 1/fl, new living room, dining room, 3 new bedrooms & 2 bathrooms added. | $250,000 |
| Oct 21, 2013 | Expired or cancelled withdrawn Aug 2016 | 24 Ord Ct | erect 4-story, 1 unit, type 5, residential building.Details
erect 4-story, 1 unit, type 5, residential building. | $350,000 | |
| Oct 15, 2013 | Never finaled issued Jan 2014, no final | 2200 Market St | as built plans to interior space as a result of modification to interior layout of units. no change to dwelling unit and bedroom count.Details
as built plans to interior space as a result of modification to interior layout of units. no change to dwelling unit and bedroom count. | ||
| Aug 30, 2013 | Completed final sign-off Nov 2014 | 270 Brighton Av | to erect 4-story, no basement, type 5, 2 dwelling units building.Details
to erect 4-story, no basement, type 5, 2 dwelling units building. | $500,000 | |
| Aug 30, 2013 | Completed final sign-off Mar 2016 | 280 Brighton Av | bldg b. erect 4-story, type 5, 27 apts/retail/parking building.Details
bldg b. erect 4-story, type 5, 27 apts/retail/parking building. | $1,500,000 | |
| Aug 22, 2013 | Completed final sign-off Sep 2019 | 735 Clayton St | convert unconditioned storage space previously used as a social room/storage on top floor (fourth) to accomodate one new dwelling unit. all work to be performed within existing boundary of the building.Details
convert unconditioned storage space previously used as a social room/storage on top floor (fourth) to accomodate one new dwelling unit. all work to be performed within existing boundary of the building. | $250,000 | |
| Aug 8, 2013 | Completed final sign-off Oct 2013 | 751 41st Av | infill under extg overhang to accomodate new storage area with new deck.Details
infill under extg overhang to accomodate new storage area with new deck. | $15,000 | |
| Jul 26, 2013 | Completed final sign-off Apr 2017 | 564 Valley St | proposed horizontal & vertical addition to existing single family house. new master bedroom @ new 3rd floor with office & interior remodel @ proposed 2nd floor & new garage @ proposed 1st floor with 2 new baths & 2 new bedrooms.Details
proposed horizontal & vertical addition to existing single family house. new master bedroom @ new 3rd floor with office & interior remodel @ proposed 2nd floor & new garage @ proposed 1st floor with 2 new baths & 2 new bedrooms. | $100,000 | |
| Jul 17, 2013 | Never finaled issued Sep 2013, no final | 212 Chattanooga St | revision to pa #2012.11.09.3927 - minor interior floor modification, proposed change of unoccupied roof to roof deck & stair at rear of 2nd floor.Details
revision to pa #2012.11.09.3927 - minor interior floor modification, proposed change of unoccupied roof to roof deck & stair at rear of 2nd floor. | $10,000 | |
| Jul 17, 2013 | Expired or cancelled expired Sep 2020 | 3352 23rd St | proposed bath & kitchen remodel & relocation of on (e) wall. all work @ 1st floor. all work to be done witin the existing boundry of the bldg.Details
proposed bath & kitchen remodel & relocation of on (e) wall. all work @ 1st floor. all work to be done witin the existing boundry of the bldg. | $15,000 | |
| Jun 21, 2013 | Completed final sign-off Apr 2014 | 712 Junipero Serra Bl | proposed interior remodel of (e) single fan home. relocation of (e) garage. conversion of (e) garage to storage area.Details
proposed interior remodel of (e) single fan home. relocation of (e) garage. conversion of (e) garage to storage area. | $10,000 | |
| May 1, 2013 | Completed final sign-off Sep 2013 | 931 Cayuga Av | proposed remodel to strengthen (e) foundation, dryrot repair, sheetrock repair, roof replacement, siding repair & waterproofing. remodel kitchen & bathroom on 2nd floor. all work within (e) boundry of bldg.Details
proposed remodel to strengthen (e) foundation, dryrot repair, sheetrock repair, roof replacement, siding repair & waterproofing. remodel kitchen & bathroom on 2nd floor. all work within (e) boundry of bldg. | $25,000 | |
| Apr 24, 2013 | Completed final sign-off May 2014 | 4595 18th St | Construction Unlimited | proposed revision to appl #2012.06.08.2228 - for minor adjustments of interior stairs. reduced size of penthouse. no other exterior changesDetails
proposed revision to appl #2012.06.08.2228 - for minor adjustments of interior stairs. reduced size of penthouse. no other exterior changes | |
| Mar 12, 2013 | Completed final sign-off Oct 2015 | 248 09th St | O Donoghue Construction Inc. | to erect 5 stories, 15 units multi-family residential with 1 commercial unit.Details
to erect 5 stories, 15 units multi-family residential with 1 commercial unit. | $2,000,000 |
| Mar 4, 2013 | Completed final sign-off Dec 2016 | 268 Capitol Av | Fong's Construction & Plumbing, Glc And Company | to erect 4 stories, no basement, 2 family dwelling units.Details
to erect 4 stories, no basement, 2 family dwelling units. | $400,000 |
| Mar 4, 2013 | Completed final sign-off Dec 2016 | 278 Capitol Av | Glc And Company | to erect 4 stories, no basement, 2 family dwellings.Details
to erect 4 stories, no basement, 2 family dwellings. | $400,000 |
| Jan 29, 2013 | Completed final sign-off Apr 2013 | 2680 Great Hy | O Donoghue Construction Inc. | proposed interior remodel for 2 bedrooms, 1 full bath at rear of 1st floor with kitchen and bath remodel at 2nd flr and add 1 bath. structural upgrades to accomodate interior modifications per plan. all work performed within e boundry of buildingDetails
proposed interior remodel for 2 bedrooms, 1 full bath at rear of 1st floor with kitchen and bath remodel at 2nd flr and add 1 bath. structural upgrades to accomodate interior modifications per plan. all work performed within e boundry of building | $75,000 |
| Jan 24, 2013 | Completed final sign-off Jan 2017 | 928 Toland St | O Donoghue Construction Inc. | to erect 1 story commercial building.Details
to erect 1 story commercial building. | $700,000 |
| Jan 24, 2013 | Completed final sign-off Nov 2014 | 928 Toland St | Ace Drilling & Excavation, O Donoghue Construction Inc. | to demolish shed / concrete.Details
to demolish shed / concrete. | $5,000 |
| Jan 15, 2013 | Completed final sign-off Sep 2013 | 56 Danvers St | San Francisco Developers | proposed interior work, kitchen & bathroom remodeling w/structural upgrades to accomodate new roof deck & interior modifications as per plan. all work to be dorn within (e) boundry of building.Details
proposed interior work, kitchen & bathroom remodeling w/structural upgrades to accomodate new roof deck & interior modifications as per plan. all work to be dorn within (e) boundry of building. | $160,000 |
| Nov 13, 2012 | Completed final sign-off Aug 2013 | 86 Wool St | Kevin Lehane Construction | add hbitable space @ 1st floor to accomodate two (n) bedrooms & two (n) bathrooms. interior remodeling at 2nd floor w/kitchen & stairs relocating & add one (n) family room by relocating one bedroom to first floor.Details
add hbitable space @ 1st floor to accomodate two (n) bedrooms & two (n) bathrooms. interior remodeling at 2nd floor w/kitchen & stairs relocating & add one (n) family room by relocating one bedroom to first floor. | $75,000 |
| Nov 9, 2012 | Completed final sign-off May 2016 | 3032 Clement St | to erect 4-story, 6 units apartments, retail & parking.Details
to erect 4-story, 6 units apartments, retail & parking. | $1,000,000 | |
| Nov 9, 2012 | Completed final sign-off May 2016 | 3032 Clement St | demolish 1 story retail buildingDetails
demolish 1 story retail building | $20,000 | |
| Nov 9, 2012 | Completed final sign-off Jun 2014 | 212 Chattanooga St | proposed interior remodel of e single family home. convert e storage area at 1st fl into conditioned space,2 bedrooms, 2 full baths, exterior entry at garage. bedroom and full bath at basement level. convert e attic space into conditioned space by adding dormers. proposed foundation and structuralDetails
proposed interior remodel of e single family home. convert e storage area at 1st fl into conditioned space,2 bedrooms, 2 full baths, exterior entry at garage. bedroom and full bath at basement level. convert e attic space into conditioned space by adding dormers. proposed foundation and structural | $200,000 | |
| Oct 30, 2012 | Completed final sign-off Oct 2013 | 270 Crestlake Dr | B R S Construction | conversion of existing storage to habitable space with stair connection to 1st fl. remodel to accomodate 1 new bdroom, 2 new baths and relocation of 2 bedrooms from 1st fl to basement level. foundation and structural upgrade. all work done within e building envelope. remodel kitchen & bath @ 1/f.Details
conversion of existing storage to habitable space with stair connection to 1st fl. remodel to accomodate 1 new bdroom, 2 new baths and relocation of 2 bedrooms from 1st fl to basement level. foundation and structural upgrade. all work done within e building envelope. remodel kitchen & bath @ 1/f. | $150,000 |
| Oct 16, 2012 | Never finaled issued May 2013, no final | 616 Cambridge St | erect 3 stories, single familyDetails
erect 3 stories, single family | $300,000 | |
| Jul 24, 2012 | Expired or cancelled cancelled Jan 2026 | 4595 18th St | proposed foundation & slab repalcement.Details
proposed foundation & slab repalcement. | $25,000 | |
| Jul 13, 2012 | Completed final sign-off Mar 2015 | 67 Linda St | San Francisco Developers | vertical addition on new 3rd floor. interior remodel, (n) family room & (n) bathroom @ 1st fl. two (n) bedrooms & bathroom on new 3rd floor.Details
vertical addition on new 3rd floor. interior remodel, (n) family room & (n) bathroom @ 1st fl. two (n) bedrooms & bathroom on new 3rd floor. | $220,000 |
| Jun 27, 2012 | Completed final sign-off Feb 2013 | 2192 Funston Av | Area Development Inc. | revision to appl #2010.02.26.7262-s1/r2: modification of approved floor plan (basement, 1st, 2nd & 3rd floor).Details
revision to appl #2010.02.26.7262-s1/r2: modification of approved floor plan (basement, 1st, 2nd & 3rd floor). | |
| Jun 12, 2012 | Completed final sign-off Oct 2012 | 1067 Tennessee St | San Francisco Developers | to comply with planing complaint 11740 - replacement of one window & re-finishing of exterior stairs.Details
to comply with planing complaint 11740 - replacement of one window & re-finishing of exterior stairs. | $5,000 |
| Jun 8, 2012 | Completed final sign-off May 2014 | 4595 18th St | Construction Unlimited | proposed one story horizontal addition @ rear of first floor to accomodate more habitable space for second unit. proposed conversion of (e) commerical unit to accomdodate more habitable space for the first unit. replace of (e) wood windows in kind.Details
proposed one story horizontal addition @ rear of first floor to accomodate more habitable space for second unit. proposed conversion of (e) commerical unit to accomdodate more habitable space for the first unit. replace of (e) wood windows in kind. | $90,000 |
| May 30, 2012 | Completed final sign-off May 2013 | 430 Central Av | interior remodel w/kitchen & bathroom relocation @ 2nd floor. interior remodeling to enlarge master bathroom by eliminating one bedroom @ 3rd floor, bathroom remodeling & two new dormers @ 4th floor.Details
interior remodel w/kitchen & bathroom relocation @ 2nd floor. interior remodeling to enlarge master bathroom by eliminating one bedroom @ 3rd floor, bathroom remodeling & two new dormers @ 4th floor. | $110,000 | |
| Apr 24, 2012 | Expired or cancelled cancelled Jan 2026 | 127 Clearfield Dr | add habitable space-1 family room, 1 bathroom, 1 office & 1 exercise room at 1st floor (garage). minor interior remodeling with kitchen & stair relocation at 2nd floorDetails
add habitable space-1 family room, 1 bathroom, 1 office & 1 exercise room at 1st floor (garage). minor interior remodeling with kitchen & stair relocation at 2nd floor | $90,000 | |
| Apr 11, 2012 | Completed final sign-off Nov 2012 | 2578 Sutter St | add 1 bedroom, 1 family room, 1 bath, 1 half bath at back of garage, basement level. interior remodel at 1st floor with new bedroom, bath, and half bath and new stairs to basement floor and kitchen relocation. interior remodel of 2nd fl with 1 new bedroom, bath, kitchen remodel.Details
add 1 bedroom, 1 family room, 1 bath, 1 half bath at back of garage, basement level. interior remodel at 1st floor with new bedroom, bath, and half bath and new stairs to basement floor and kitchen relocation. interior remodel of 2nd fl with 1 new bedroom, bath, kitchen remodel. | $60,000 | |
| Apr 11, 2012 | Never finaled issued Apr 2012, no final | 26 Ocean Av | O Donoghue Construction Inc. | upgrade (e) bathroom to ada compliant bathroom.Details
upgrade (e) bathroom to ada compliant bathroom. | $20,000 |
| Mar 7, 2012 | Completed final sign-off Nov 2012 | 40 Pope St | Umanzor Construction Inc. | proposed foundation replacement.Details
proposed foundation replacement. | $30,000 |
| Feb 21, 2012 | Completed final sign-off Mar 2012 | 47 Moss St | to comply w/n.o.v. #201175654 to legalize partition walls @ the 2nd floor. as built, non load bearing wallsDetails
to comply w/n.o.v. #201175654 to legalize partition walls @ the 2nd floor. as built, non load bearing walls | $10,000 | |
| Feb 7, 2012 | Completed final sign-off May 2013 | 134 Ord St | Edward P. Gama ( Lic Cancele By Cslb) | revision to approved foundation plan and detail-bpa# 200907142604 per plan.Details
revision to approved foundation plan and detail-bpa# 200907142604 per plan. | |
| Nov 28, 2011 | Completed final sign-off Feb 2012 | 87 Denslowe Dr | kitchen and bath remodel resulting in 1 additional new bath. no change to building.Details
kitchen and bath remodel resulting in 1 additional new bath. no change to building. | $15,000 | |
| Nov 21, 2011 | Completed final sign-off Jul 2013 | 444 Ivy St | erect 4 story single family dwelling.Details
erect 4 story single family dwelling. | $450,000 | |
| Nov 21, 2011 | Completed final sign-off Jan 2013 | 136 Ord St | Ace Drilling & Excavation, Edward P. Gama ( Lic Cancele By Cslb) | foundation replacement at rear of the buildingDetails
foundation replacement at rear of the building | $40,000 |
| Nov 8, 2011 | Completed final sign-off Dec 2012 | 1030 Hyde St | Area Development Inc. | proposed modification to approved app#201109195018. modification framing plan.Details
proposed modification to approved app#201109195018. modification framing plan. | |
| Nov 8, 2011 | Never finaled issued Nov 2011, no final | 2230 42nd Av | O Donoghue Construction Inc. | proposed foundation replacement per plan.Details
proposed foundation replacement per plan. | $50,000 |
| Sep 19, 2011 | Completed final sign-off Dec 2012 | 1030 Hyde St | Area Development Inc. | proposed interior remodeling of 4 units, proposed foundation repalcement & seismic upgrade. infill lightwell @ south face, extend lightwell on north face to 2nd floor, reconfiguration of (e) floor plan @ 2nd & 3rd floor.Details
proposed interior remodeling of 4 units, proposed foundation repalcement & seismic upgrade. infill lightwell @ south face, extend lightwell on north face to 2nd floor, reconfiguration of (e) floor plan @ 2nd & 3rd floor. | $350,000 |