Permit GraphSan Francisco building permits since 2000

Block 6090, lot 015

597 Naples St

City’s use
Multi-Family Residential
Built
1902
Stories
2
Units
3
Rooms
11 bedrooms, 6 bathrooms
Building
3,996 sq ft
Lot
2,495 sq ft
Zoning
RH2
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

7 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 26, 2019Completed
final sign-off May 2021
597 Naples StArea Development Inc.adding an accessory dwelling unit within a two story auxilary structure to the of an existing two-family, two-story residential dwelling unit per section 207(c)(4) per ordinance 162-16/162-17.
Details
Permit
201911268286
Status
complete
Filed
Nov 26, 2019
Permit issued
Feb 16, 2021
Final sign-off
May 26, 2021
Declared cost
$200,000
Address
597 Naples St

adding an accessory dwelling unit within a two story auxilary structure to the of an existing two-family, two-story residential dwelling unit per section 207(c)(4) per ordinance 162-16/162-17.

Open the permit page

$200,000
Sep 15, 2017Expired or cancelled
withdrawn Apr 2019
599 Naples St(rear building). to convert garage / exercise room to a new 3 bedrooms & 2.5 bath dwelling unit.
Details
Permit
201709158591
Status
withdrawn
Filed
Sep 15, 2017
Declared cost
$35,000
Address
599 Naples St

(rear building). to convert garage / exercise room to a new 3 bedrooms & 2.5 bath dwelling unit.

Open the permit page

$35,000
Feb 22, 2016Never finaled
issued Feb 2016, no final
599 Naples Stdry rot repair at garage area, interior only. in-kind. replace studs each side of garage door.
Details
Permit
201602220156
Status
issued
Filed
Feb 22, 2016
Permit issued
Feb 22, 2016
Declared cost
$4,000
Address
599 Naples St

dry rot repair at garage area, interior only. in-kind. replace studs each side of garage door.

Open the permit page

$4,000
Aug 28, 2009Completed
final sign-off Oct 2009
599 Naples Stcomply w/nov #200992201 -kitchen & bathroom remodel, all work to be performed within the boundaries of the bldg. sheetrock repair in-kind in bathroom & kitchen. provide high efficacy lighting per title-24 requirement.
Details
Permit
200908285811
Status
complete
Filed
Aug 28, 2009
Permit issued
Aug 28, 2009
Final sign-off
Oct 30, 2009
Declared cost
$8,000
Address
599 Naples St

comply w/nov #200992201 -kitchen & bathroom remodel, all work to be performed within the boundaries of the bldg. sheetrock repair in-kind in bathroom & kitchen. provide high efficacy lighting per title-24 requirement.

Open the permit page

$8,000
Aug 27, 2009Completed
final sign-off Aug 2009
599 Naples StOver The Top Roofingreroofing (1/2 inch plywood (sheathing)
Details
Permit
200908275704
Status
complete
Filed
Aug 27, 2009
Permit issued
Aug 27, 2009
Final sign-off
Aug 31, 2009
Declared cost
$7,000
Address
599 Naples St

reroofing (1/2 inch plywood (sheathing)

Open the permit page

$7,000
Dec 30, 2008Completed
final sign-off Oct 2009
599 Naples Stproposed new unit at ground level of existing single family home. all work to be performed within existing boundary of the building.
Details
Permit
200812309364
Status
complete
Filed
Dec 30, 2008
Permit issued
May 13, 2009
Final sign-off
Oct 30, 2009
Declared cost
$120,000
Address
599 Naples St

proposed new unit at ground level of existing single family home. all work to be performed within existing boundary of the building.

Open the permit page

$120,000
Oct 20, 2008Completed
final sign-off Oct 2009
599 Naples Stproposed remodel of (e) detached bldg to include the conversion of (e) second story storage into new exercise room with new 1/2 bath. all change to occur within the (e) envelope of the bldg. new front entry door and rear door.
Details
Permit
200810204627
Status
complete
Filed
Oct 20, 2008
Permit issued
Oct 23, 2008
Final sign-off
Oct 30, 2009
Declared cost
$15,000
Address
599 Naples St

proposed remodel of (e) detached bldg to include the conversion of (e) second story storage into new exercise room with new 1/2 bath. all change to occur within the (e) envelope of the bldg. new front entry door and rear door.

Open the permit page

$15,000

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.

Filter the results