17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2021 | Completed final sign-off Oct 2022 | 2578 Sutter St | Cranadore Construction Inc | as build for pa# 201204118123. to document changes throughout.Details
as build for pa# 201204118123. to document changes throughout. | |
| Sep 4, 2020 | Completed final sign-off Apr 2021 | 2578 Sutter St | restore original double-hung wdw @ 2/f centered above front entr, wndw to match original size/shape (w/segmental arch @ top) & returned to original location. restore all wndws w/all wood double-hung w/integral ogee lugs. current installed wndws do not meet city planning window replacement standardsDetails
restore original double-hung wdw @ 2/f centered above front entr, wndw to match original size/shape (w/segmental arch @ top) & returned to original location. restore all wndws w/all wood double-hung w/integral ogee lugs. current installed wndws do not meet city planning window replacement standards | $15,000 | |
| Mar 3, 2016 | Completed final sign-off Sep 2016 | 2578 Sutter St | Ampex Engineering & Co | replace door handle & lock to garage, connect 1/2" copper line to floor drain primer change light switch in garageDetails
replace door handle & lock to garage, connect 1/2" copper line to floor drain primer change light switch in garage | $230 |
| Dec 12, 2014 | Completed final sign-off Jan 2016 | 2578 Sutter St | to obtain final inspection for work approved under pa#201009020137 all work is complete.Details
to obtain final inspection for work approved under pa#201009020137 all work is complete. | ||
| Dec 12, 2014 | Completed final sign-off Aug 2016 | 2578 Sutter St | to comply with physical inspection report #cc-7685Details
to comply with physical inspection report #cc-7685 | ||
| Dec 12, 2014 | Completed final sign-off Aug 2016 | 2578 Sutter St | to obtain final inspection for work approved under pa#200702134090 all work is complete.Details
to obtain final inspection for work approved under pa#200702134090 all work is complete. | ||
| Apr 11, 2012 | Completed final sign-off Nov 2012 | 2578 Sutter St | add 1 bedroom, 1 family room, 1 bath, 1 half bath at back of garage, basement level. interior remodel at 1st floor with new bedroom, bath, and half bath and new stairs to basement floor and kitchen relocation. interior remodel of 2nd fl with 1 new bedroom, bath, kitchen remodel.Details
add 1 bedroom, 1 family room, 1 bath, 1 half bath at back of garage, basement level. interior remodel at 1st floor with new bedroom, bath, and half bath and new stairs to basement floor and kitchen relocation. interior remodel of 2nd fl with 1 new bedroom, bath, kitchen remodel. | $60,000 | |
| Mar 28, 2012 | Completed final sign-off Nov 2012 | 2578 Sutter St | Ampex Engineering & Co | remodel bathrooms and kitchen in the units.Details
remodel bathrooms and kitchen in the units. | $21,000 |
| Sep 2, 2010 | Expired or cancelled cancelled Aug 2016 | 2578 Sutter St | Jun's Associates Incorported | repair deck and stairs at rear building, 50% of structure to be replacedDetails
repair deck and stairs at rear building, 50% of structure to be replaced | $7,500 |
| Jul 18, 2007 | Expired or cancelled cancelled Jul 2015 | 2580 Sutter St | Dean Alac | 3rd floor addition as per plans and enlargement of enveloped. add 4th story and change occupancy from r-3 story sprinklers, stand pipe and fire alarm separate permit.Details
3rd floor addition as per plans and enlargement of enveloped. add 4th story and change occupancy from r-3 story sprinklers, stand pipe and fire alarm separate permit. | $190,000 |
| Mar 2, 2007 | Completed final sign-off Mar 2007 | 2578 Sutter St | Dean Alac | renew pa#200605302744 for final inspection.Details
renew pa#200605302744 for final inspection. | |
| Feb 13, 2007 | Expired or cancelled cancelled Aug 2016 | 2578 Sutter St | Dean Alac | rebuilt (e) front stairs in kind.Details
rebuilt (e) front stairs in kind. | $5,000 |
| Nov 14, 2006 | Never finaled issued Nov 2006, no final | 2578 Sutter St | streetspaceDetails
streetspace | ||
| Sep 7, 2006 | Never finaled issued Sep 2006, no final | 2578 Sutter St | street space permitDetails
street space permit | ||
| Aug 10, 2006 | Completed final sign-off Mar 2007 | 2578 Sutter St | rebuilt perimeter retaining walls in kind. no excavation to increase head room.Details
rebuilt perimeter retaining walls in kind. no excavation to increase head room. | $30,000 | |
| Jun 5, 2006 | Never finaled issued Jun 2006, no final | 2578 Sutter St | street space permit only.Details
street space permit only. | ||
| May 30, 2006 | Expired or cancelled expired Mar 2007 | 2578 Sutter St | Dean Alac | rebuild existing foundation as shown on planDetails
rebuild existing foundation as shown on plan | $25,000 |