Babette Jee
- Listed as
- architect
- Firm
- Asian Neighborhood Design
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to May 2024
7 permits since 2000 (architect on 7 permits): 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 14, 2024 | Completed final sign-off Oct 2024 | 2976 23rd St | L C Builders Inc. | minor dryrot repair. repair/replace (e) deck planks (less than 50%). exterior siding replacement to match (e) wood. remove/refurbish (e) metal structure (remove rust). all work at rear, no work visible from street.Details
minor dryrot repair. repair/replace (e) deck planks (less than 50%). exterior siding replacement to match (e) wood. remove/refurbish (e) metal structure (remove rust). all work at rear, no work visible from street. | $109,000 |
| Dec 31, 2019 | Completed final sign-off Apr 2021 | 2976 23rd St | G Y Engineering Co | minor renovation to 5 existing bathroos in kind. replacement of fixtures. w.p. siding, repair roof leaks. interor & exterior handrails added. design/build fire alarm and heating. repair all windowsDetails
minor renovation to 5 existing bathroos in kind. replacement of fixtures. w.p. siding, repair roof leaks. interor & exterior handrails added. design/build fire alarm and heating. repair all windows | $403,800 |
| Nov 2, 2016 | Completed final sign-off Oct 2018 | 3830 Noriega St | All Best Buildrs.Inc./All Trusty Bldrs. | front facade to receive new windows and doors, insulated wall, new exterior finishes and planter. associated with 2016-1024-0989.Details
front facade to receive new windows and doors, insulated wall, new exterior finishes and planter. associated with 2016-1024-0989. | $57,300 |
| Jun 29, 2016 | Completed final sign-off Dec 2016 | 2846 Folsom St | Arana Group, Inc. | renovation of 2 kitchens, unit 2848 & unit 2846 are an adaptable kitchen, communication features and grab bar improvements per sf/sro ord misc improvements to entry stepsDetails
renovation of 2 kitchens, unit 2848 & unit 2846 are an adaptable kitchen, communication features and grab bar improvements per sf/sro ord misc improvements to entry steps | $20,000 |
| Apr 29, 2016 | Completed final sign-off Oct 2017 | 50 Raymond Av | D.F.P.F Corp Dba Fine Line Construction | provide lift for ada access to 2nd floor. renovate 2 toilet rooms for accessibilitly. related improvements to affected rooms. exterior improvements (minor) path of travelDetails
provide lift for ada access to 2nd floor. renovate 2 toilet rooms for accessibilitly. related improvements to affected rooms. exterior improvements (minor) path of travel | $167,200 |
| Jan 8, 2016 | Expired or cancelled cancelled Jan 2020 | 151 Ney St | 2 story building horizontal addition. shell only, add interior stair , add 2 bedrooms and 1 porch. renovate and expand (e) kitchen.Details
2 story building horizontal addition. shell only, add interior stair , add 2 bedrooms and 1 porch. renovate and expand (e) kitchen. | $75,000 | |
| Jun 28, 2013 | Completed final sign-off Feb 2015 | 2430 Mission St | Rossi Builders Inc. | basemnt/1st/2nd floors-ti for credit union-work includes new partitions, fixtures, finishes, bathrooms, m.e.p, stairs. exterior work under seperate permit. fire protection under seperate permitDetails
basemnt/1st/2nd floors-ti for credit union-work includes new partitions, fixtures, finishes, bathrooms, m.e.p, stairs. exterior work under seperate permit. fire protection under seperate permit | $350,000 |