G Y Engineering Co
- Based in
- Redwood City
- On San Francisco permits
- Jun 2011 to Jun 2020
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2020 | Completed final sign-off Jun 2021 | 652 Capp St | scope of work: mechanical revision to approved permit # 201902122722 1. change approved gas tankless water heater to heat pump water heater 2. change approved hydronic fan coil space heater to ductless heat pump 3. change prescriptive title 24 report to performance methodDetails
scope of work: mechanical revision to approved permit # 201902122722 1. change approved gas tankless water heater to heat pump water heater 2. change approved hydronic fan coil space heater to ductless heat pump 3. change prescriptive title 24 report to performance method | |
| Dec 31, 2019 | Completed final sign-off Apr 2021 | 2976 23rd St | minor renovation to 5 existing bathroos in kind. replacement of fixtures. w.p. siding, repair roof leaks. interor & exterior handrails added. design/build fire alarm and heating. repair all windowsDetails
minor renovation to 5 existing bathroos in kind. replacement of fixtures. w.p. siding, repair roof leaks. interor & exterior handrails added. design/build fire alarm and heating. repair all windows | $403,800 |
| Dec 22, 2014 | Completed final sign-off Apr 2015 | 1921 Mcallister St | comply with sf wood frame seismic retrofit program (soft story), sfbc chapter 34b, per 2012 iebc appendix a4Details
comply with sf wood frame seismic retrofit program (soft story), sfbc chapter 34b, per 2012 iebc appendix a4 | $40,000 |
| Jul 12, 2011 | Completed final sign-off Nov 2011 | 190 Brewster St | remove stucco at front of house bow, remove & replace rotted or damaged sheathing (7/16" osb). re-stucco & paint. repair sheet rock. install 2 layers of building paper over plywood. revison to pa# 201106137956.Details
remove stucco at front of house bow, remove & replace rotted or damaged sheathing (7/16" osb). re-stucco & paint. repair sheet rock. install 2 layers of building paper over plywood. revison to pa# 201106137956. | $17,000 |
| Jun 13, 2011 | Completed final sign-off Nov 2011 | 190 Brewster St | remove & repair existing stucco, re-seal windows and re-stucco front. paint front of home and repair sheetrock and repaint 2 front rooms. no change to window, walls or doors. approx. 200 sq.ft. repair in kind.Details
remove & repair existing stucco, re-seal windows and re-stucco front. paint front of home and repair sheetrock and repaint 2 front rooms. no change to window, walls or doors. approx. 200 sq.ft. repair in kind. | $27,000 |