Alex Asli
- Listed as
- architect
- Firm
- Arquitectonica
- Based in
- Los Angeles
- On San Francisco permits
- May 2001 to Jan 2018
16 permits since 2000 (architect on 16 permits): 14 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 9, 2018 | Completed final sign-off Mar 2019 | 1000 03rd St | Lend Lease (Us) Construction Inc | revision & corrections to fsd matrix. revisions & corrections to smoke control panel. revise application #201408133775, addenda 4 mep. maher naDetails
revision & corrections to fsd matrix. revisions & corrections to smoke control panel. revise application #201408133775, addenda 4 mep. maher na | |
| Oct 4, 2017 | Completed final sign-off Mar 2019 | 1000 03rd St | Lend Lease (Us) Construction Inc | revision to fsd matrix & revise fsd tag on mechanical drawings to correct app #201408133775 s-4 addendum 4 - mep. no additional fsd's added. maher naDetails
revision to fsd matrix & revise fsd tag on mechanical drawings to correct app #201408133775 s-4 addendum 4 - mep. no additional fsd's added. maher na | |
| Oct 4, 2017 | Completed final sign-off Mar 2019 | 110 Channel | Lend Lease (Us) Construction Inc | revision to fsd matrix & revise mechanical drawings to correct app #201408133766 s-4 addendum 4 - mep. no additional fsd's added. maher naDetails
revision to fsd matrix & revise mechanical drawings to correct app #201408133766 s-4 addendum 4 - mep. no additional fsd's added. maher na | |
| Aug 30, 2017 | Completed final sign-off Dec 2018 | 1066 Market St | Swinerton Builders | demolition of 2-story commercial and parking. ** maher: exempted - approval from dph attached **Details
demolition of 2-story commercial and parking. ** maher: exempted - approval from dph attached ** | $50,000 |
| Feb 9, 2016 | Never finaled issued Aug 2019, no final | 655 Folsom St | to erect 14 stories, 1 basement, type i-a, 89 residential units with mixed use building. (r-2,a-3,b,m,s-2)Details
to erect 14 stories, 1 basement, type i-a, 89 residential units with mixed use building. (r-2,a-3,b,m,s-2) | $20,000,000 | |
| Jan 20, 2016 | Expired or cancelled cancelled Jan 2020 | 201 Folsom St | interior design for all amenity arear fixtures furnishings & all finishes appliced to archtectural surfaces. this includes all lobbies , public spaces and typical unit corridors. revision to p/a 201207124713 s-3 n/a for maher ordinance no.155-13Details
interior design for all amenity arear fixtures furnishings & all finishes appliced to archtectural surfaces. this includes all lobbies , public spaces and typical unit corridors. revision to p/a 201207124713 s-3 n/a for maher ordinance no.155-13 | ||
| Dec 31, 2015 | Completed final sign-off Mar 2016 | 1415 Mission St | Build Group Inc. | van accessible parking stall at b1 relocated to clear the overhead utility/life safety obstruction along gridline 3 (that encroaches on the required 8'2" height clearance) and 1 accesssible stall relocated to b2. ref app #200810315586s. maher n/aDetails
van accessible parking stall at b1 relocated to clear the overhead utility/life safety obstruction along gridline 3 (that encroaches on the required 8'2" height clearance) and 1 accesssible stall relocated to b2. ref app #200810315586s. maher n/a | $1,000 |
| Dec 21, 2015 | Completed final sign-off Jun 2018 | 338 Main St | tower d- revision to pa#201207124724 work in high rise bldg. on 36/f & 37/f to combine 8 smaller units into 4 larger units. ref. to pa#201512175376 for dwelling unit & story count. there is no 13/f in this building. n/a ordinance #155-13Details
tower d- revision to pa#201207124724 work in high rise bldg. on 36/f & 37/f to combine 8 smaller units into 4 larger units. ref. to pa#201512175376 for dwelling unit & story count. there is no 13/f in this building. n/a ordinance #155-13 | $350,000 | |
| Apr 8, 2015 | Completed final sign-off Mar 2016 | 1415 Mission St | Build Group Inc. | revision to approved pa# 2008/10/31/5586 s-3 (architectural). lower garage door clearance @ loading area from 12'-0" to 11'-0". ** maher: compliance with ordinance no# 155-13 not required **Details
revision to approved pa# 2008/10/31/5586 s-3 (architectural). lower garage door clearance @ loading area from 12'-0" to 11'-0". ** maher: compliance with ordinance no# 155-13 not required ** | |
| Mar 18, 2015 | Completed final sign-off Jul 2018 | 110 Channel | Lend Lease (Us) Construction Inc | foundation associated w/ construction of (n) bldg appln #201408133766-s.gsDetails
foundation associated w/ construction of (n) bldg appln #201408133766-s.gs | $25,000 |
| Mar 18, 2015 | Completed final sign-off Jun 2018 | 1000 03rd St | Lend Lease (Us) Construction Inc | foundation associated w/ appn #201408133775-s construction of (n) bldg.gsDetails
foundation associated w/ appn #201408133775-s construction of (n) bldg.gs | $25,000 |
| Oct 6, 2014 | Completed final sign-off Jan 2016 | 41 Tehama St | Lend Lease (Us) Construction Inc, A & B Construction | demolition of 1 story storage shed.Details
demolition of 1 story storage shed. | $47,000 |
| Sep 10, 2014 | Completed final sign-off Mar 2016 | 1415 Mission St | Build Group Inc. | interior & non-structural revision to level one floor only uner construction. no changes to height, bulk sq. footage or occupancy classification authorized under approved pa# 2008/10/31/5586 's'. relocate retail, fcc, mail room & provide leasing offices, 1 additional bathroom, workroom & office.Details
interior & non-structural revision to level one floor only uner construction. no changes to height, bulk sq. footage or occupancy classification authorized under approved pa# 2008/10/31/5586 's'. relocate retail, fcc, mail room & provide leasing offices, 1 additional bathroom, workroom & office. | $10,000 |
| Jun 12, 2014 | Completed final sign-off Nov 2020 | 1066 Market St | Swinerton Builders | to erect 14 stories, 2 basement, 303 residential & retail building. (r-2,a-2,b,s-2)Details
to erect 14 stories, 2 basement, 303 residential & retail building. (r-2,a-2,b,s-2) | $86,400,000 |
| Apr 30, 2014 | Completed final sign-off May 2018 | 41 Tehama St | Lend Lease (Us) Construction Inc | to erect 35 stories, 3 basement, 403 residential units with mix used & parking building. (r-2,b,a-3,m,h-3,s-2)Details
to erect 35 stories, 3 basement, 403 residential units with mix used & parking building. (r-2,b,a-3,m,h-3,s-2) | $60,000,000 |
| May 30, 2001 | Completed final sign-off Aug 2009 | 353 King St | to erect 17 stories, 260 dwellings of retail, residendital and parking.Details
to erect 17 stories, 260 dwellings of retail, residendital and parking. | $40,300,000 |