Andrew Morrall
- Listed as
- architect, authorized agent-others
- Firm
- Andrew Morrall Architect
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Mar 2026
77 permits since 2000 (architect on 76 permits, authorized agent-others on 3 permits): 54 completed, 7 in progress, 6 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2026 | In progress issued May 2026 | 1304 Valencia St | Pacific Edge Construction Inc | structural revision to pa# 202204202645-s1, replace an existing unreinforced masonry foundation in poor condition along property line with poured reinforced concrete foundation. add 1-bathroom with 1-sink and 1-toilet within (e) floor plan on 3rd floor.Details
structural revision to pa# 202204202645-s1, replace an existing unreinforced masonry foundation in poor condition along property line with poured reinforced concrete foundation. add 1-bathroom with 1-sink and 1-toilet within (e) floor plan on 3rd floor. | $13,201 |
| Oct 31, 2025 | In progress filed Oct 2025, not yet issued | 2126 18th St | a 610 s.f. vertical, 94 s.f.front & 80 s.f. rear addition. 134 sq. ft. of (e) garage to convert to habitable space. 392 s.f. studio adu proposed on g/f per gov. sec. 65852.2. interior remodel to kitchen and (3) baths at main residence. extensive facade alterations proposed.Details
a 610 s.f. vertical, 94 s.f.front & 80 s.f. rear addition. 134 sq. ft. of (e) garage to convert to habitable space. 392 s.f. studio adu proposed on g/f per gov. sec. 65852.2. interior remodel to kitchen and (3) baths at main residence. extensive facade alterations proposed. | $1,200,000 | |
| Sep 5, 2025 | Completed final sign-off Feb 2026 | 2112 18th St | Pacific Edge Construction Inc | spiral stair connection for a spiral stair. ref pa #202204202653 (s1)Details
spiral stair connection for a spiral stair. ref pa #202204202653 (s1) | $100 |
| Apr 28, 2025 | In progress issued May 2025 | 3020 20th Av | Big Boys Construction Inc. | g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added.Details
g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added. | $195,000 |
| Jan 16, 2025 | In progress issued Aug 2025 | 2339 37th Av | Hammerhouse Construction | 3rd story horiz 116sf addition to (e) to include a closet, not visible to the street. demo (e) 2nd story roof deck, infill (e) 46sf center atrium. interior remodel of (e) 2nd story and kitchen.Details
3rd story horiz 116sf addition to (e) to include a closet, not visible to the street. demo (e) 2nd story roof deck, infill (e) 46sf center atrium. interior remodel of (e) 2nd story and kitchen. | $154,000 |
| Nov 25, 2024 | In progress issued Mar 2025 | 1304 Valencia St | administrative permit to correct the proposed occupancy classification code as "r-2/b" for approved permit application #202204202645.Details
administrative permit to correct the proposed occupancy classification code as "r-2/b" for approved permit application #202204202645. | ||
| Aug 23, 2024 | Completed final sign-off Apr 2026 | 1345 Masonic Av | Pacific Edge Construction Inc | remodel (e) second bathroom on 3rd story. to include removal of glass block non bearing wall and replace with pony wall with glassDetails
remodel (e) second bathroom on 3rd story. to include removal of glass block non bearing wall and replace with pony wall with glass | $15,000 |
| Dec 7, 2023 | In progress filed Dec 2023, not yet issued | 32 Laidley St | a 3rd & 4th story addition to an existing 3 story home to include: (1) office, (1) full bath, (2) roof decks and a partial remodel of an existing bath.Details
a 3rd & 4th story addition to an existing 3 story home to include: (1) office, (1) full bath, (2) roof decks and a partial remodel of an existing bath. | $312,000 | |
| Jul 26, 2022 | Completed final sign-off Nov 2024 | 1583 18th Av | Pacific Edge Construction Inc | interior remodel of 1 kitchen and 3 baths. taking sf from the (e) garage to become conditioned space. infill (1) lightwell facing a blank wall.Details
interior remodel of 1 kitchen and 3 baths. taking sf from the (e) garage to become conditioned space. infill (1) lightwell facing a blank wall. | $130,000 |
| Apr 20, 2022 | Completed final sign-off Feb 2026 | 2112 18th St | Pacific Edge Construction Inc | re-build existing rear main level deck. add a roof deck with spiral staircases in the rear yard.Details
re-build existing rear main level deck. add a roof deck with spiral staircases in the rear yard. | $40,000 |
| Apr 20, 2022 | In progress issued Jan 2024 | 1304 Valencia St | Pacific Edge Construction Inc | remodel existing ground level and second level. add a rear addition. demolish existing attic level storage and attic. create a new residential unit atop the existing second level.Details
remodel existing ground level and second level. add a rear addition. demolish existing attic level storage and attic. create a new residential unit atop the existing second level. | $600,000 |
| Jul 28, 2021 | Completed final sign-off Apr 2023 | 8 Miguel St | Pacific Edge Construction Inc | interior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building.Details
interior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building. | $62,000 |
| Jun 7, 2021 | Completed final sign-off Oct 2023 | 127 12th Av | Pacific Edge Construction Inc | revision to pa #202009234814 - remove 1 non-structural, non-bearing wall from the scope of work. refer to sheets s2.2, s2.3, and a2.0Details
revision to pa #202009234814 - remove 1 non-structural, non-bearing wall from the scope of work. refer to sheets s2.2, s2.3, and a2.0 | |
| May 28, 2021 | Never finaled issued Aug 2022, no final | 94 Denslowe Dr | Jva Management Corp | 1-story rear yard addition. included in the addition is an exercise rm, bedrm, laundry rm and 2 full baths. remodel of (e) kitchen & baths. enclose from porch and relocate front door. site plans.Details
1-story rear yard addition. included in the addition is an exercise rm, bedrm, laundry rm and 2 full baths. remodel of (e) kitchen & baths. enclose from porch and relocate front door. site plans. | $85,000 |
| Apr 9, 2021 | Completed final sign-off May 2024 | 2909 26th Av | Pacific Edge Construction Inc | excavation of (e) crawlspace to add 1,080 gross sqft to include 3 bedrooms, 1 bath and an excercise room. condition a portion of an (e) garage for a family room. add a bay window at the rear. no work at front exterior.Details
excavation of (e) crawlspace to add 1,080 gross sqft to include 3 bedrooms, 1 bath and an excercise room. condition a portion of an (e) garage for a family room. add a bay window at the rear. no work at front exterior. | $197,000 |
| Sep 23, 2020 | Completed final sign-off Oct 2023 | 125 12th Av | Pacific Edge Construction Inc | interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.garage door replaced and widened 1 foot to 8'w. x 7'h. footing & struct work for interior work on 2nd flr above. concurrent work on third level 127 12th ave. is being submitted under separate permit.Details
interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.garage door replaced and widened 1 foot to 8'w. x 7'h. footing & struct work for interior work on 2nd flr above. concurrent work on third level 127 12th ave. is being submitted under separate permit. | $188,400 |
| Sep 23, 2020 | Completed final sign-off Oct 2023 | 127 12th Av | Pacific Edge Construction Inc | 3rd level-interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.no new square footage.concurrent work at the ground level and second level at 125 12th avenue will be submitted under separate building permit.Details
3rd level-interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.no new square footage.concurrent work at the ground level and second level at 125 12th avenue will be submitted under separate building permit. | $158,400 |
| Nov 22, 2019 | Completed final sign-off May 2021 | 511 Webster St | Hammerhouse Construction | interior remodel of (e) residential unit 2 at the top level to include a remodeled kitchen and bath. 1 full bath to be addedDetails
interior remodel of (e) residential unit 2 at the top level to include a remodeled kitchen and bath. 1 full bath to be added | $94,000 |
| Sep 24, 2019 | Completed final sign-off Jan 2026 | 521 Capp St | Barron Construction Inc. | excavate existing garage, demolish existing enclosed porch & deck. a 2 story addition and remodel that includes a guest bedroom, bathroom and kitchen.Details
excavate existing garage, demolish existing enclosed porch & deck. a 2 story addition and remodel that includes a guest bedroom, bathroom and kitchen. | $240,000 |
| Aug 12, 2019 | Completed final sign-off Mar 2021 | 2112 18th St | Pacific Edge Construction Inc | 231 sq ft ground flr addition under an (e) room and remodel to incl 1 bed, 1 bath, fam room and garage. 15 sq ft 2nd flr addition and remodel to incl (e) kitchen and baths.Details
231 sq ft ground flr addition under an (e) room and remodel to incl 1 bed, 1 bath, fam room and garage. 15 sq ft 2nd flr addition and remodel to incl (e) kitchen and baths. | $225,000 |
| Apr 30, 2019 | Completed final sign-off Jan 2021 | 901 Elizabeth St | Hammerhouse Construction | a 55 sq ft in-fill addition @ garage under an existing room, a 444 sq ft interior remodel at ground floor adding 1 bedroom and 1 bath, a second floor remodel of an existing bathroom.Details
a 55 sq ft in-fill addition @ garage under an existing room, a 444 sq ft interior remodel at ground floor adding 1 bedroom and 1 bath, a second floor remodel of an existing bathroom. | $86,000 |
| Jun 30, 2017 | Never finaled issued Apr 2018, no final | 21 Cora St | a 828 sq.ft. first & second flr addition with second flr roof deck at rear of building an interior remodel including kitchens & baths. addition shall include 2 bedrooms, 2 baths and family room.Details
a 828 sq.ft. first & second flr addition with second flr roof deck at rear of building an interior remodel including kitchens & baths. addition shall include 2 bedrooms, 2 baths and family room. | $268,715 | |
| May 10, 2017 | Expired or cancelled cancelled Nov 2022 | 836 Page St | rear horizontal addition with roof deck at building 454 sq ft, total new addition with 2 bedrooms, interior remodel including kitchen & bathroom.Details
rear horizontal addition with roof deck at building 454 sq ft, total new addition with 2 bedrooms, interior remodel including kitchen & bathroom. | $125,000 | |
| Apr 18, 2017 | Completed final sign-off Jan 2020 | 158 Dolores St | Pacific Edge Construction Inc | a (2) story rear addition with deck at grade. interior remodeling.Details
a (2) story rear addition with deck at grade. interior remodeling. | $265,000 |
| Dec 20, 2016 | Completed final sign-off Dec 2018 | 324 Elsie St | Chl Construction Company | a 3 story rear addition with decks. rooms added are recreation room, family area, bedrooms & bath.Details
a 3 story rear addition with decks. rooms added are recreation room, family area, bedrooms & bath. | $145,000 |
| Dec 20, 2016 | Completed final sign-off Aug 2018 | 84 Levant St | Pacific Edge Construction Inc | a 205 sq ft 4th story addition & 333 sq ft roof deck within existing building foot print.Details
a 205 sq ft 4th story addition & 333 sq ft roof deck within existing building foot print. | $80,000 |
| Nov 22, 2016 | Never finaled issued Feb 2021, no final | 3817 26th St | *revised-interior remodel, including kitchen and baths, new roof deck.*Details
*revised-interior remodel, including kitchen and baths, new roof deck.* | $413,000 | |
| Jun 24, 2016 | Completed final sign-off Oct 2018 | 605 Elizabeth St | Division Sf Inc Dba: Hawke Bldg Company | horizontal addition. 320 sq ft 2-story addition @ rear of bldg converting 457 sq ft of (e) garage into habitable space. (1) bedroom & (1) bath to be added. (e) kitchen remodel.new play area on ground level.Details
horizontal addition. 320 sq ft 2-story addition @ rear of bldg converting 457 sq ft of (e) garage into habitable space. (1) bedroom & (1) bath to be added. (e) kitchen remodel.new play area on ground level. | $139,000 |
| Nov 30, 2015 | Expired or cancelled cancelled Jan 2026 | 1033 Fell St | interior remodel of an existing residential unit including a kitchen & (2) existing baths. n/a ordinance #155-13Details
interior remodel of an existing residential unit including a kitchen & (2) existing baths. n/a ordinance #155-13 | $70,000 | |
| Jun 30, 2015 | Completed final sign-off Oct 2020 | 380 Warren Dr | Mulhall Construction Inc. | a 3 story horizontal addition at rear with decks, exterior egress stairs and a roof deck. interior remodel of existing house. addition includes 2 bedrooms and 2 1/2 baths.Details
a 3 story horizontal addition at rear with decks, exterior egress stairs and a roof deck. interior remodel of existing house. addition includes 2 bedrooms and 2 1/2 baths. | $434,951 |
| Feb 6, 2015 | Completed final sign-off Jul 2016 | 764 Guerrero St | Mulhall Construction Inc. | remodel existing lower level including add family room & bathroom. add an internal stair to the level above.Details
remodel existing lower level including add family room & bathroom. add an internal stair to the level above. | $40,000 |
| Jul 31, 2014 | Never finaled issued Jun 2017, no final | 1318 Hampshire St | Liang General Construction Inc | remodel interior of (e) residential building, including kitchens & baths. add (1) residential unit within (e) envelope at ground level.Details
remodel interior of (e) residential building, including kitchens & baths. add (1) residential unit within (e) envelope at ground level. | $225,000 |
| Apr 7, 2014 | Completed final sign-off Mar 2016 | 70 Martha Av | Mulhall Construction Inc. | interior remodel of existing house to include kitchens and baths. add allowable bay window projections, add allowable rear spiral stair. add lower story within existing house and crawl space. sprinkler under separate permit.Details
interior remodel of existing house to include kitchens and baths. add allowable bay window projections, add allowable rear spiral stair. add lower story within existing house and crawl space. sprinkler under separate permit. | $250,000 |
| Mar 14, 2014 | Completed final sign-off Mar 2016 | 70 Martha Av | Mulhall Construction Inc. | a 3 story rear deck.Details
a 3 story rear deck. | $19,000 |
| Dec 17, 2013 | Expired or cancelled expired Sep 2022 | 16 Fountain St | Mulhall Construction Inc. | a 2nd story & 2 story addition of 1,548 sq ft with 462 sq ft storage at basement. remodel existing kitchen and baths. rebuild and add 405 sq ft to garage. addition shall include (1) bedroom, expanded bedrooms, expanded kitchen & dining (3) bathrooms.Details
a 2nd story & 2 story addition of 1,548 sq ft with 462 sq ft storage at basement. remodel existing kitchen and baths. rebuild and add 405 sq ft to garage. addition shall include (1) bedroom, expanded bedrooms, expanded kitchen & dining (3) bathrooms. | $450,000 |
| Dec 13, 2013 | Completed final sign-off Feb 2017 | 178 Los Palmos Dr | Mulhall Construction Inc. | a 820 sq ft 3rd story addition atop an existing 2 story house interior remodel of (e) 2nd story. rear decks.Details
a 820 sq ft 3rd story addition atop an existing 2 story house interior remodel of (e) 2nd story. rear decks. | $350,000 |
| Oct 18, 2013 | Completed final sign-off Jun 2015 | 1327 35th Av | Mulhall Construction Inc. | interior remodel of an (e) 2 unit residence including kitchens & bathrooms. demolish 210sq ft of ground level. re-build deck & egress stairsDetails
interior remodel of an (e) 2 unit residence including kitchens & bathrooms. demolish 210sq ft of ground level. re-build deck & egress stairs | $100,000 |
| Sep 19, 2013 | Completed final sign-off May 2016 | 543 20th Av | Hammerhouse Construction | a 600 s.f 2 story addition at the rear of the house. converting 400 s.f of an existing garage into conditioned living space. remodel kitchen . add deck at rear of house.Details
a 600 s.f 2 story addition at the rear of the house. converting 400 s.f of an existing garage into conditioned living space. remodel kitchen . add deck at rear of house. | $150,000 |
| Sep 5, 2013 | Completed final sign-off Jan 2015 | 10 Jade Pl | Mulhall Construction Inc. | 187 sq ft 2nd story addition a top an existing attached 1 story garage. the addition will be an expanded master bath & sitting area. an interior remodel of an existing kitchen & bath.Details
187 sq ft 2nd story addition a top an existing attached 1 story garage. the addition will be an expanded master bath & sitting area. an interior remodel of an existing kitchen & bath. | $50,000 |
| Apr 30, 2013 | Completed final sign-off Feb 2014 | 57 Fernwood Dr | Hawke Construction | horizontal addition. add one story 51 sqft. addition at the rear house within the buildable area.Details
horizontal addition. add one story 51 sqft. addition at the rear house within the buildable area. | $6,000 |
| Apr 16, 2013 | Completed final sign-off Feb 2014 | 57 Fernwood Dr | Hawke Construction | kitchen remodel 3 bathrooms remodel & laundry room. replace garage door. add balcony guardrails.Details
kitchen remodel 3 bathrooms remodel & laundry room. replace garage door. add balcony guardrails. | $65,000 |
| Feb 8, 2013 | Completed final sign-off Oct 2015 | 2335 15th Av | Mulhall Construction Inc. | interior remodel of existing kitchen, master bedroom add 1 interior bath. enclose an existing rear deck, enclose an existing lightwell.Details
interior remodel of existing kitchen, master bedroom add 1 interior bath. enclose an existing rear deck, enclose an existing lightwell. | $99,000 |
| Aug 28, 2012 | Completed final sign-off Mar 2014 | 362 Waller St | add 376 sqft 2 story addition w/roof deck to include a bedroom, study/tv room & bath.Details
add 376 sqft 2 story addition w/roof deck to include a bedroom, study/tv room & bath. | $98,000 | |
| Jul 2, 2012 | Completed final sign-off Sep 2012 | 15 Divisadero St | Mulhall Construction Inc. | interior kitchen & bath remodel, new skylights & new garden window at kitchen.Details
interior kitchen & bath remodel, new skylights & new garden window at kitchen. | $50,000 |
| Jun 26, 2012 | Completed final sign-off Mar 2013 | 49 Capra Wy | Lokman Construction | interior remodel of (e) kitchen & 2 (e) bathrooms, create interior connecting stair from (e) 2nd fl level to new conditioned space of the ground level, which includes a master bedroom, 1 bathroom & closet. install new high eff. furnaces for each unitDetails
interior remodel of (e) kitchen & 2 (e) bathrooms, create interior connecting stair from (e) 2nd fl level to new conditioned space of the ground level, which includes a master bedroom, 1 bathroom & closet. install new high eff. furnaces for each unit | $120,000 |
| Apr 5, 2012 | Completed final sign-off Mar 2013 | 237 28th St | Hawke Construction | replace & reconfigure existing dilapidated non-code complying egress stair with new code complying egress stair & small deck at 3rd level for dwelling unit 239 28th street.Details
replace & reconfigure existing dilapidated non-code complying egress stair with new code complying egress stair & small deck at 3rd level for dwelling unit 239 28th street. | $25,000 |
| Mar 27, 2012 | Completed final sign-off Oct 2016 | 2529 Post St | Palmera Construction Co | demolish (e) dilapidated deck & stair. replace with new deck & stair.Details
demolish (e) dilapidated deck & stair. replace with new deck & stair. | $35,000 |
| Dec 20, 2011 | Completed final sign-off Mar 2013 | 237 28th St | Hawke Construction | remodel interior-kitchens & bathrooms, add 590 sq ft of conditioned living space at (e) ground level for unit #237. add a connecting stair at unit #237, add a total of 3 new bathrooms, replace windows & add, reconfigure windows at the rear of the building, add beams & shear wallsDetails
remodel interior-kitchens & bathrooms, add 590 sq ft of conditioned living space at (e) ground level for unit #237. add a connecting stair at unit #237, add a total of 3 new bathrooms, replace windows & add, reconfigure windows at the rear of the building, add beams & shear walls | $300,000 |
| Dec 6, 2011 | Completed final sign-off Jul 2012 | 319 Montcalm St | Houseworks Enterprises Inc. | interior remodel of (e) 2nd level bedroom & bathroom creating 2 bedrooms where there was 1, add 1 shear wall at the 2nd level, replace 2/f window sash in kind.Details
interior remodel of (e) 2nd level bedroom & bathroom creating 2 bedrooms where there was 1, add 1 shear wall at the 2nd level, replace 2/f window sash in kind. | $55,000 |
| Aug 18, 2011 | Completed final sign-off Jun 2015 | 1587 18th Av | Hammerhouse Construction | add a 3rd story addition. reconfigure front garage door remodel existing kitchen & bath.Details
add a 3rd story addition. reconfigure front garage door remodel existing kitchen & bath. | $300,000 |
| Jul 8, 2011 | Completed final sign-off Oct 2011 | 335 Joost Av | Lokman Construction | amend permit to include new window.revision to app#201103303057Details
amend permit to include new window.revision to app#201103303057 | $2,000 |
| Jun 27, 2011 | Never finaled issued Sep 2011, no final | 3528 23rd St | Hammerhouse Construction | interior remodel including kitchen and bath remodel, new windows at e sunroom, 3 new skylights, add one full bath. maintaining existing size windows at rear north wall of sunroom, all work at 3rd floor unit onlyDetails
interior remodel including kitchen and bath remodel, new windows at e sunroom, 3 new skylights, add one full bath. maintaining existing size windows at rear north wall of sunroom, all work at 3rd floor unit only | $140,000 |
| Mar 30, 2011 | Completed final sign-off Oct 2011 | 335 Joost Av | Lokman Construction | interior kitchen remodel and adding a bathroom at the basement level with in the extg buildingDetails
interior kitchen remodel and adding a bathroom at the basement level with in the extg building | $65,000 |
| Oct 7, 2010 | Completed final sign-off Feb 2011 | 222 Hermann St | Hmm's Gc Inc | interior kitchen & bath remodel. adding a bath, adding a shearwall, first floor onlyDetails
interior kitchen & bath remodel. adding a bath, adding a shearwall, first floor only | $80,000 |
| Aug 5, 2010 | Never finaled issued Aug 2010, no final | 952 Capp St | Houseworks Enterprises Inc. | revision to 200912183451. add skylight 4x4. delete reconstruction of walls at 2nd level. strengthening existing structure at area of remodelDetails
revision to 200912183451. add skylight 4x4. delete reconstruction of walls at 2nd level. strengthening existing structure at area of remodel | $8,000 |
| May 21, 2010 | Completed final sign-off Feb 2011 | 1351 31st Av | Houseworks Enterprises Inc. | interior remodel of existing kitchen & baths. enclose atrium within bldg foot print. add laundry room at ground level. replace windows add stair near grade at rear of house.Details
interior remodel of existing kitchen & baths. enclose atrium within bldg foot print. add laundry room at ground level. replace windows add stair near grade at rear of house. | $140,000 |
| Apr 15, 2010 | Completed final sign-off Feb 2011 | 605 Elizabeth St | Thomas Construction | add a new bathroom addition atop an (e) 2-story bump-out @ rear of bldg. enclose ground level of bump-out. remodel (e) bathrooms. add fire rated window w/ obscured glass @ east property line, add skylight.Details
add a new bathroom addition atop an (e) 2-story bump-out @ rear of bldg. enclose ground level of bump-out. remodel (e) bathrooms. add fire rated window w/ obscured glass @ east property line, add skylight. | $68,000 |
| Mar 25, 2010 | Expired or cancelled withdrawn Oct 2017 | 217 Arkansas St | strengthen (e) retaining walls at rear of property. build a new deck 1 story above grade for unit# 2 at rear of building.Details
strengthen (e) retaining walls at rear of property. build a new deck 1 story above grade for unit# 2 at rear of building. | $65,000 | |
| Feb 5, 2010 | Completed final sign-off Jul 2010 | 173 Collins St | Hammerhouse Construction | adding a master bath within the existing house at the third level. repalce existing windows at rear of bldg.Details
adding a master bath within the existing house at the third level. repalce existing windows at rear of bldg. | $19,000 |
| Feb 19, 2009 | Completed final sign-off Sep 2009 | 1125 Leavenworth St | J K Construction Co | #1127- remodel existing kitchen & bathroom. add 1 bathroom, relocate select non-bearing partitions. replace water heater & furnace. install recess lighting. refinish hardwood floor. scope of work inside unit 1127.Details
#1127- remodel existing kitchen & bathroom. add 1 bathroom, relocate select non-bearing partitions. replace water heater & furnace. install recess lighting. refinish hardwood floor. scope of work inside unit 1127. | $116,000 |
| Feb 13, 2009 | Completed final sign-off Oct 2009 | 601 04th St | unit 217: remodel existing kitchen and bath, relocate 1 bearing wall, strengthen joists for existing sleeping loftDetails
unit 217: remodel existing kitchen and bath, relocate 1 bearing wall, strengthen joists for existing sleeping loft | $40,000 | |
| Feb 6, 2009 | Expired or cancelled cancelled May 2020 | 421 Alvarado St | add a residential unit at the rear of an existing single family residence.Details
add a residential unit at the rear of an existing single family residence. | $260,000 | |
| Jan 27, 2009 | Completed final sign-off Aug 2009 | 1122 Stanyan St | Metzler Brothers, Inc. | kitchen & bathroom remodel-new tile in tub, new vinyl bathroom floor, new kitchen cabinets, replace 3 windows (lightwell), 1 exterior door, new opening to dining room, new wainscotting to matchDetails
kitchen & bathroom remodel-new tile in tub, new vinyl bathroom floor, new kitchen cabinets, replace 3 windows (lightwell), 1 exterior door, new opening to dining room, new wainscotting to match | $51,000 |
| Jan 15, 2009 | Completed final sign-off Dec 2009 | 743 Rhode Island St | remodel existing kitchen and bath. minor alterations to interior non bearing walls. replace windows. strengthen and replace new roof and roof deck, new interior stair and sliding glass door at rear, new 44" high 1 hour rated wall at deck. all work in top unitDetails
remodel existing kitchen and bath. minor alterations to interior non bearing walls. replace windows. strengthen and replace new roof and roof deck, new interior stair and sliding glass door at rear, new 44" high 1 hour rated wall at deck. all work in top unit | $75,000 | |
| Dec 19, 2008 | Completed final sign-off Apr 2009 | 130 Hernandez Av | replace and modify a front entry stoop (stairs). & retaining walls 2 to 6" high.Details
replace and modify a front entry stoop (stairs). & retaining walls 2 to 6" high. | $15,000 | |
| Aug 11, 2008 | Completed final sign-off Dec 2009 | 947 Elizabeth St | reconstruct and reconfigure 2 existing decks: 1 at gradeDetails
reconstruct and reconfigure 2 existing decks: 1 at grade | $28,000 | |
| Aug 11, 2008 | Completed final sign-off Dec 2009 | 945 Elizabeth St | reconstruct and reconfigure 2 existing decks: 1 at grade, 1 in kind, and construct fenceDetails
reconstruct and reconfigure 2 existing decks: 1 at grade, 1 in kind, and construct fence | $27,000 | |
| Aug 11, 2008 | Completed final sign-off Dec 2009 | 949 Elizabeth St | re-construct and re-configure 3 (e) decks, 1 at gradeDetails
re-construct and re-configure 3 (e) decks, 1 at grade | $45,000 | |
| Jul 31, 2008 | Completed final sign-off Dec 2008 | 955 Valencia St | Bliss Construction A Partnership | change an existing spa and bathhouse into its original use as a residence. demolish existing jacuzz and re-frame floor.Details
change an existing spa and bathhouse into its original use as a residence. demolish existing jacuzz and re-frame floor. | $11,000 |
| Mar 13, 2008 | Completed final sign-off Mar 2009 | 369 Bocana St | remove 6 ex windows at the so wall at side property line. remove portion of existing wall damaged by water and dryrot. replace with 3 new 45 min rated fixed dble insulated windows and replace portion of damaged wall w new framing & 1 hour construction. replace window at e wall.install skylightDetails
remove 6 ex windows at the so wall at side property line. remove portion of existing wall damaged by water and dryrot. replace with 3 new 45 min rated fixed dble insulated windows and replace portion of damaged wall w new framing & 1 hour construction. replace window at e wall.install skylight | $20,000 | |
| Dec 18, 2007 | Expired or cancelled expired Feb 2009 | 8 Prospect Av | Logan Design & Construction | demolish ex. non-bearing walls. cut a new opening and install a new spiral staircase that will connect the main level with the lower level. add a shear wall. all work interior, no new glazing.Details
demolish ex. non-bearing walls. cut a new opening and install a new spiral staircase that will connect the main level with the lower level. add a shear wall. all work interior, no new glazing. | $18,000 |
| Jun 18, 2007 | Expired or cancelled cancelled Jun 2016 | 2325 Ocean Av | barrier removal (voluntary) consisting of removing gate at front entry, adding handrails at front entry. adding a stair from the lower level to grade adding 2 non bearing walls at side elevation level. replacing 1 window in kind at the lower level at side elevation.Details
barrier removal (voluntary) consisting of removing gate at front entry, adding handrails at front entry. adding a stair from the lower level to grade adding 2 non bearing walls at side elevation level. replacing 1 window in kind at the lower level at side elevation. | $15,000 | |
| Dec 4, 2006 | Completed final sign-off Jul 2007 | 1364 Union St | Timberline Const Co | install new cabinets in kitchen-redo 2 bathrooms.Details
install new cabinets in kitchen-redo 2 bathrooms. | $80,000 |
| Sep 8, 2006 | Completed final sign-off Oct 2007 | 2325 Ocean Av | remove illegal construction in basement. remove and demolish gas lines and plumbing. demolish and remove exterior rear deck and stairs. replace drywall in basement. install new guardrail at rear sliding door.Details
remove illegal construction in basement. remove and demolish gas lines and plumbing. demolish and remove exterior rear deck and stairs. replace drywall in basement. install new guardrail at rear sliding door. | $2,500 | |
| Jul 28, 2006 | Expired or cancelled expired Mar 2009 | 2577 Post St | replace windows front & back in kind. revision of appl#200607267664Details
replace windows front & back in kind. revision of appl#200607267664 | $9,500 | |
| Mar 4, 2005 | Expired or cancelled expired Nov 2006 | 449 Mississippi St | removal of wall & restructure of kitchen,minor move of plumbing & electrical.work at top floor unitDetails
removal of wall & restructure of kitchen,minor move of plumbing & electrical.work at top floor unit | $40,000 | |
| Dec 16, 2004 | Expired or cancelled revoked Dec 2012 | 834 44th Av | addition of new 3/f & addition of new dwelling unitDetails
addition of new 3/f & addition of new dwelling unit | $140,000 |