Block 2828, lot 050
949 Elizabeth St
- City’s use
- Single Family Residential
- Built
- 1912
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,908 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 27, 2013 | Completed final sign-off Feb 2016 | 949 Elizabeth St | Michael Clarke Construction | foundation upgrade. basement conversion. new staircase. new guest room, new bathroom, new family room, gym. 1st floor: remodel bathroom. 2nd floor: remodel entire floor, new layout, add new bathroom, new replacement windows. 3 relocate bedroom.Details
foundation upgrade. basement conversion. new staircase. new guest room, new bathroom, new family room, gym. 1st floor: remodel bathroom. 2nd floor: remodel entire floor, new layout, add new bathroom, new replacement windows. 3 relocate bedroom. | $200,000 |
| Nov 22, 2011 | Completed final sign-off Dec 2011 | 949 Elizabeth St | to comply with nov 201164507, install trellis at side/front of yard trellis is approx 14 ft long & 9ft tall. this trellis is for the purpose of supporting vires.Details
to comply with nov 201164507, install trellis at side/front of yard trellis is approx 14 ft long & 9ft tall. this trellis is for the purpose of supporting vires. | $800 | |
| Aug 11, 2008 | Completed final sign-off Dec 2009 | 949 Elizabeth St | re-construct and re-configure 3 (e) decks, 1 at gradeDetails
re-construct and re-configure 3 (e) decks, 1 at grade | $45,000 | |
| Jul 23, 2007 | Completed final sign-off Oct 2007 | 949 Elizabeth St | Chen's Construction | repair kitchen. change new cabinets new counter top. electrical work, kitchen put new lighting and new outlet. change panels and circuits, plmg work for kitchen, change new sink, new stove grabage disposal. dishwasher faucet and hood fix gas piper. no structural. 50% lighting to be fluorescentDetails
repair kitchen. change new cabinets new counter top. electrical work, kitchen put new lighting and new outlet. change panels and circuits, plmg work for kitchen, change new sink, new stove grabage disposal. dishwasher faucet and hood fix gas piper. no structural. 50% lighting to be fluorescent | $8,000 |
| Apr 12, 2005 | Completed final sign-off Jul 2005 | 949 Elizabeth St | Home Works Inc/Kitchen Work Inc | relace 1 window and 1 entry door, size for size, alum to wood composite. not visible from streetDetails
relace 1 window and 1 entry door, size for size, alum to wood composite. not visible from street | $3,900 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Chen's Construction, Home Works Inc/Kitchen Work Inc, Michael Clarke Construction
- Architects
- Andrew Morrall, John Git Hoong Lum
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.