Andre Rothblatt
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Andre Rothblatt Architecture
- Based in
- San Francisco
- On San Francisco permits
- Dec 2002 to Oct 2026
106 permits since 2000 (architect on 98 permits, authorized agent-others on 5 permits, engineer on 4 permits): 80 completed, 9 in progress, 13 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 106.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 439 Bowdoin St | side yard horizontal addition,(n) 8'x8'dormer,interior remodel.Details
side yard horizontal addition,(n) 8'x8'dormer,interior remodel. | $185,000 | |
| Aug 19, 2026 | In progress issued Aug 2026 | 166 Bonview St | Frederic Grasset Design-Build | 2nd revision to pa#202603036872, minor changes to layout and non-load baring walls, new overhang at the rear. replace window with glassblock.Details
2nd revision to pa#202603036872, minor changes to layout and non-load baring walls, new overhang at the rear. replace window with glassblock. | $8,500 |
| May 13, 2026 | In progress issued May 2026 | 8 Sears St | Sps Remodeling & Painting Inc | interior remodel: kitchen & bathroom remodel @ the upper level, new + relocated windows in the lightwell. (n) family room, bedroom + bathroom @ the lower level.Details
interior remodel: kitchen & bathroom remodel @ the upper level, new + relocated windows in the lightwell. (n) family room, bedroom + bathroom @ the lower level. | $95,000 |
| Apr 15, 2026 | In progress issued Apr 2026 | 166 Bonview St | Frederic Grasset Design-Build | revision to 202603036872, remnove & replace portions of (e) foundation, revisions to stairs & bathroom @ lower level, remove/replace stucco siding in front.Details
revision to 202603036872, remnove & replace portions of (e) foundation, revisions to stairs & bathroom @ lower level, remove/replace stucco siding in front. | $45,000 |
| Mar 3, 2026 | In progress issued Mar 2026 | 166 Bonview St | Frederic Grasset Design-Build | interior remodel to include kit. and bathroom remodel at the upper level. relocate int. stair case. new family room, study and 2 new bathrooms on the lower level. remodel existing rear yard deck. replace windows in front, relocate nw windows in the rear.Details
interior remodel to include kit. and bathroom remodel at the upper level. relocate int. stair case. new family room, study and 2 new bathrooms on the lower level. remodel existing rear yard deck. replace windows in front, relocate nw windows in the rear. | $129,000 |
| Dec 1, 2025 | In progress issued Dec 2025 | 1499 Sanchez St | revision to pa # 202510167489: repair, replace & strengthen (e) sub standard framing & foundation in the garage & bedroom roof.Details
revision to pa # 202510167489: repair, replace & strengthen (e) sub standard framing & foundation in the garage & bedroom roof. | $9,500 | |
| Oct 16, 2025 | Completed final sign-off Jun 2026 | 1499 Sanchez St | Reliable Construction Inc | kitchen remodel, bathrooms remodel, remove wall between kitchen and dining room.Details
kitchen remodel, bathrooms remodel, remove wall between kitchen and dining room. | $100,000 |
| Sep 9, 2025 | Completed final sign-off Mar 2026 | 12 Mateo St | S A Baxter Inc. | bathroom remodel, convert living room to bedroom. misc. interior improvements.Details
bathroom remodel, convert living room to bedroom. misc. interior improvements. | $40,000 |
| Aug 14, 2025 | Completed final sign-off Jul 2026 | 1467 Funston Av | Bay Build Design Inc | bathroom remodel. remove rear yard deck & stairs and replace with new landing w/ stairs. new hallway in family room. replace foundation and damaged wall at lightwell. (n) windows are rear and side.Details
bathroom remodel. remove rear yard deck & stairs and replace with new landing w/ stairs. new hallway in family room. replace foundation and damaged wall at lightwell. (n) windows are rear and side. | $90,000 |
| Apr 15, 2025 | Completed final sign-off Nov 2025 | 475 Valley St | Mizen Construction Inc | remove bathroom on 2nd fl; relocate kitchen, alter window at rear, new bathroom on 3rd fl. add 3 skylights.Details
remove bathroom on 2nd fl; relocate kitchen, alter window at rear, new bathroom on 3rd fl. add 3 skylights. | $125,000 |
| Feb 7, 2025 | In progress issued Jul 2025 | 831 Hampshire St | Frederic Grasset Design-Build | remodel and alteration to a two-unit duplex. convert ground level to habitable space w/ new interior staircase to connect with lower unit. minor improvements to upper level. less than 50 c.y. of excavation. (n) conditioned area 855 sq.ft.Details
remodel and alteration to a two-unit duplex. convert ground level to habitable space w/ new interior staircase to connect with lower unit. minor improvements to upper level. less than 50 c.y. of excavation. (n) conditioned area 855 sq.ft. | $425,000 |
| Dec 11, 2024 | Completed final sign-off Jun 2026 | 883 28th Av | O'shea Co. Home Grown Construction | infill (e) lightwell, interior remodel. convert portion of garage to conditional space to include 2 new bedrooms and bathrooms on the lower level. foundation and slab repair/replacment.Details
infill (e) lightwell, interior remodel. convert portion of garage to conditional space to include 2 new bedrooms and bathrooms on the lower level. foundation and slab repair/replacment. | $175,000 |
| Nov 20, 2024 | Completed final sign-off Nov 2025 | 2450 41st Av | Perez Construction Llc. | kitchen and bath remodel on the upper floor, new bath on lower floor at existing bedroom. internal interior foyer expansion.Details
kitchen and bath remodel on the upper floor, new bath on lower floor at existing bedroom. internal interior foyer expansion. | $125,000 |
| Sep 3, 2024 | Completed final sign-off Jan 2025 | 616 Arlington St | O'shea Co. Home Grown Construction | non structural bathroom remodel.Details
non structural bathroom remodel. | $22,500 |
| Jun 25, 2024 | Completed final sign-off Sep 2025 | 12 Eugenia Av | Frederic Grasset Design-Build | kitchen, bathroom & laundry room remodel. new closets on upper fl. new windows in the rear not street visible from the streetDetails
kitchen, bathroom & laundry room remodel. new closets on upper fl. new windows in the rear not street visible from the street | $65,000 |
| Feb 29, 2024 | Completed final sign-off Jul 2024 | 128 Kirkham St | Modern Green Constructions Inc | 1 new bathroom & closet on upper lvlDetails
1 new bathroom & closet on upper lvl | $40,000 |
| Dec 22, 2023 | In progress issued Feb 2025 | 642 22nd Av | 3-story rear yard additional. new dormer & interior remodel.Details
3-story rear yard additional. new dormer & interior remodel. | $249,000 | |
| Dec 21, 2023 | Completed final sign-off Jul 2024 | 616 Arlington St | O'shea Co. Home Grown Construction | revision to pa# 202307182397: increase height of foundation at rear wall.Details
revision to pa# 202307182397: increase height of foundation at rear wall. | $9,000 |
| Dec 5, 2023 | In progress issued Aug 2024 | 373 Chenery St | replace and enlarge rear yard deck to including new firewall & infill lightwell, interior remodel (n) internal stair to second floor w/ rated wall at garage,replace/add windows, replace interior slab & foundation. kitchen, bathroom remodel w/o building area increase. replace/add windows.Details
replace and enlarge rear yard deck to including new firewall & infill lightwell, interior remodel (n) internal stair to second floor w/ rated wall at garage,replace/add windows, replace interior slab & foundation. kitchen, bathroom remodel w/o building area increase. replace/add windows. | $149,000 | |
| Jul 19, 2023 | Completed final sign-off May 2024 | 430 Gates St | Frederic Grasset Design-Build | 2/f: remodel to create open floor plan kitchen, structural improvements throughoutDetails
2/f: remodel to create open floor plan kitchen, structural improvements throughout | $95,000 |
| Jul 18, 2023 | Completed final sign-off Jul 2024 | 616 Arlington St | convert family room to bedroom & den. new closet. relocate lower level bathroom. new window at rear not visible from street. new confitioned area 145 sf.Details
convert family room to bedroom & den. new closet. relocate lower level bathroom. new window at rear not visible from street. new confitioned area 145 sf. | $70,000 | |
| May 31, 2023 | Completed final sign-off Oct 2023 | 133 Lundys Ln | Frederic Grasset Design-Build | to comply with nov 202305175: replace ship ladder with spiral stairs. replace 3 vinyl windows with wood windows, legalize lower level family room; study and bathroom and hot tub in side yard.Details
to comply with nov 202305175: replace ship ladder with spiral stairs. replace 3 vinyl windows with wood windows, legalize lower level family room; study and bathroom and hot tub in side yard. | $85,000 |
| Dec 8, 2022 | Completed final sign-off Mar 2024 | 2651 16th Av | Frederic Grasset Design-Build | interior remodel to include: (n) bedroom in lower level, relocate bathroom on the lower level. remodel kitchen and bathroom on upper level. (n) conditioned space = 241 sqft. remove ext. staircase for passageway.Details
interior remodel to include: (n) bedroom in lower level, relocate bathroom on the lower level. remodel kitchen and bathroom on upper level. (n) conditioned space = 241 sqft. remove ext. staircase for passageway. | $175,000 |
| Sep 7, 2022 | Never finaled issued Sep 2022, no final | 130 Vicksburg St | new 8' high wood fence @ south property line.Details
new 8' high wood fence @ south property line. | $3,500 | |
| May 26, 2022 | Never finaled issued Jun 2022, no final | 2831 Laguna St | Andrew Mark Construction Inc | replace / rebuild roof deck and windscreen. same size.Details
replace / rebuild roof deck and windscreen. same size. | $35,000 |
| Feb 11, 2022 | Never finaled issued Aug 2023, no final | 777 Moultrie St | vertical addition on the rear to include new bath and bedroom extension, new dormer for enlarged closet. new floor area 180 sq ftDetails
vertical addition on the rear to include new bath and bedroom extension, new dormer for enlarged closet. new floor area 180 sq ft | $95,000 | |
| Dec 28, 2021 | Completed final sign-off Mar 2023 | 120 Forest Knolls Dr | Frederic Grasset Design-Build | kitchen remodel, new tile, and fixtures in bathrooms, alter (e) stairs to be code compliant, remodel & expand (e) family room, relocat powder roomDetails
kitchen remodel, new tile, and fixtures in bathrooms, alter (e) stairs to be code compliant, remodel & expand (e) family room, relocat powder room | $120,000 |
| Nov 23, 2021 | Completed final sign-off Dec 2022 | 140 Granville Wy | kitchen & bath remodel,remove wall & add beam.Details
kitchen & bath remodel,remove wall & add beam. | $60,000 | |
| Jul 21, 2021 | Completed final sign-off Aug 2022 | 240 Morningside Dr | in-kind remodel 3 full bathroom and 1 powder room. replace fireplace surround with granite. install 5/8in gyp brd in dining room. no layout changes or wall mods.Details
in-kind remodel 3 full bathroom and 1 powder room. replace fireplace surround with granite. install 5/8in gyp brd in dining room. no layout changes or wall mods. | $85,000 | |
| Jul 19, 2021 | Never finaled issued Jul 2021, no final | 2324 Greenwich St | new roof deck, skylight hatch and new interior stair way exempt from section 311. new moment frame in garage.Details
new roof deck, skylight hatch and new interior stair way exempt from section 311. new moment frame in garage. | $85,000 | |
| Feb 8, 2021 | Never finaled issued May 2021, no final | 130 Vicksburg St | interior remodel: new bathroom and dormer (exempt from section 311), dmeo rear pop-out. replace windows (alum to wood-clad. new exterior stairs in rear.Details
interior remodel: new bathroom and dormer (exempt from section 311), dmeo rear pop-out. replace windows (alum to wood-clad. new exterior stairs in rear. | $120,000 | |
| Jan 4, 2021 | Completed final sign-off Aug 2021 | 9 Vasquez Av | revision to pa# 202008071309. add 3 skylights inside (e) joist bays, not visible from street. remove & replace living room ceiling with 5/8" thk gyd bd. minor change to (e) closet.Details
revision to pa# 202008071309. add 3 skylights inside (e) joist bays, not visible from street. remove & replace living room ceiling with 5/8" thk gyd bd. minor change to (e) closet. | $7,500 | |
| Nov 20, 2020 | Completed final sign-off Apr 2021 | 672 Moultrie St | Frederic Grasset Design-Build | revision to pa# 201911147287. new foundation and framing reinforcement. change front fence and railing design.Details
revision to pa# 201911147287. new foundation and framing reinforcement. change front fence and railing design. | $8,000 |
| Nov 9, 2020 | Completed final sign-off Oct 2021 | 412 Pioche St | convert portion of garage into new bedroom, bathroom & closet. new interior stairs. remove (e) windscreen at deck. increase deck railing to 42". reduce size of one garage door. replace front windows.Details
convert portion of garage into new bedroom, bathroom & closet. new interior stairs. remove (e) windscreen at deck. increase deck railing to 42". reduce size of one garage door. replace front windows. | $95,000 | |
| Nov 9, 2020 | Completed final sign-off Jun 2021 | 166 Anderson St | revision to pa# 202008252563 (no plan kitchen/bath remodel) reconfigure kitchen & bathroom. remove wall between kitchen & living room. raise ceiling in kitchen & living room. (n) windows at rear, not visible from the street.Details
revision to pa# 202008252563 (no plan kitchen/bath remodel) reconfigure kitchen & bathroom. remove wall between kitchen & living room. raise ceiling in kitchen & living room. (n) windows at rear, not visible from the street. | $20,000 | |
| Aug 25, 2020 | Completed final sign-off Jun 2021 | 166 Anderson St | Frederic Grasset Design-Build | kitchen & bathroom remodelDetails
kitchen & bathroom remodel | $85,000 |
| Feb 21, 2020 | Never finaled issued Mar 2020, no final | 2831 Laguna St | Andrew Mark Construction Inc | kitchen remodel, (n) laundry in closet on 3rd flDetails
kitchen remodel, (n) laundry in closet on 3rd fl | $45,000 |
| Dec 19, 2019 | Never finaled issued Dec 2019, no final | 125 Tiffany Av | infill light wells, kitchen remodel, bathroom remodel, new bathroom at light well infillDetails
infill light wells, kitchen remodel, bathroom remodel, new bathroom at light well infill | $70,000 | |
| Dec 4, 2019 | Completed final sign-off Jan 2021 | 101 Appleton Av | Frederic Grasset Design-Build | infill lightwell, convert rear portion of garage into new bedroom, bathroom, and office. remodel (e) bathroom and stairs.Details
infill lightwell, convert rear portion of garage into new bedroom, bathroom, and office. remodel (e) bathroom and stairs. | $95,000 |
| Nov 14, 2019 | Completed final sign-off Apr 2021 | 672 Moultrie St | Frederic Grasset Design-Build | alt to the facade and front stairs to include new windows, remove protruding bay window & new siding and railings.Details
alt to the facade and front stairs to include new windows, remove protruding bay window & new siding and railings. | $40,000 |
| Sep 19, 2019 | Completed final sign-off Sep 2020 | 1081 Church St | Rua Woods Construction Inc | lower level remodel, infill space under kitchen, new interior staircase, kitchen remodel, new conditioned space = 268 sf.Details
lower level remodel, infill space under kitchen, new interior staircase, kitchen remodel, new conditioned space = 268 sf. | $95,000 |
| Jun 6, 2019 | Completed final sign-off Feb 2020 | 140 Granville Wy | excavate crawl space for new master bedroom and bathroom, remodel entry and staircase. new conditioned space: 294 sq ft.. approx 45 cubid yard of excavationDetails
excavate crawl space for new master bedroom and bathroom, remodel entry and staircase. new conditioned space: 294 sq ft.. approx 45 cubid yard of excavation | $125,000 | |
| Jan 7, 2019 | Completed final sign-off Dec 2019 | 2527 42nd Av | J K Construction Co | infill (e) lightwell (not visible from street), new rear yard deck. convert rear portion of garage into family, bed rm, bath rm, media rm, remodel kitchen and upstairs bathrooms.Details
infill (e) lightwell (not visible from street), new rear yard deck. convert rear portion of garage into family, bed rm, bath rm, media rm, remodel kitchen and upstairs bathrooms. | $190,000 |
| Dec 12, 2018 | Completed final sign-off Oct 2019 | 639 Elizabeth St | Frederic Grasset Design-Build | new half bath on main floor. no other work.Details
new half bath on main floor. no other work. | $9,500 |
| Dec 4, 2018 | Completed final sign-off May 2019 | 320 Castenada Av | new bathrooms (2 total); new bathroom on 2nd floor, new bathroom & hallway on 1st floorDetails
new bathrooms (2 total); new bathroom on 2nd floor, new bathroom & hallway on 1st floor | $17,500 | |
| Oct 19, 2018 | Completed final sign-off Aug 2019 | 1331 Columbus Av | J K Construction Co | repair fire damage at property line and repair the 1-hr wall. to comply with nov#201876913, in-kind repair & 20% disabled access upgrades.Details
repair fire damage at property line and repair the 1-hr wall. to comply with nov#201876913, in-kind repair & 20% disabled access upgrades. | $50,000 |
| Sep 10, 2018 | Completed final sign-off Apr 2019 | 700 Miramar Av | kitchen remodel, modify window sizes plus locations at side of house(not visible from the street) remove inerior stairs to basement.Details
kitchen remodel, modify window sizes plus locations at side of house(not visible from the street) remove inerior stairs to basement. | $95,000 | |
| Jul 25, 2018 | Completed final sign-off Oct 2021 | 1994 36th Av | kitchen & family room remodel, relocate stairs to lower level, bathroom remodels, relocate/reconfigure windows at side & rear (not visible from street)Details
kitchen & family room remodel, relocate stairs to lower level, bathroom remodels, relocate/reconfigure windows at side & rear (not visible from street) | $95,000 | |
| May 15, 2018 | Completed final sign-off Feb 2019 | 2477 21st Av | kitchen and family room remoel, relocate room. new and relocated windows at the rear (not visible from the street).Details
kitchen and family room remoel, relocate room. new and relocated windows at the rear (not visible from the street). | $65,000 | |
| May 15, 2018 | Completed final sign-off Feb 2019 | 2477 21st Av | remodel existing shed (12'x15') in rear yard, enlarge window on left side.Details
remodel existing shed (12'x15') in rear yard, enlarge window on left side. | $7,500 | |
| Apr 24, 2018 | Completed final sign-off Sep 2018 | 355 Highland Av | revision to 201712267368 replace sub standard footing with new foundationDetails
revision to 201712267368 replace sub standard footing with new foundation | $14,500 | |
| Dec 28, 2017 | Completed final sign-off Feb 2019 | 3946 California St | kitchen, bathroom, and pantry remodel on 2nd floor. remove skylight and new skylight in kitchen. new windows throughout.Details
kitchen, bathroom, and pantry remodel on 2nd floor. remove skylight and new skylight in kitchen. new windows throughout. | $90,000 | |
| Dec 26, 2017 | Completed final sign-off Sep 2018 | 355 Highland Av | Elite Engineering Contractors | convert rear portion of garage to family room and half bath. maher naDetails
convert rear portion of garage to family room and half bath. maher na | $45,000 |
| Dec 7, 2017 | Completed final sign-off Jul 2018 | 2633 Harrison St | new bathroom in garage.Details
new bathroom in garage. | $16,500 | |
| Apr 26, 2017 | Completed final sign-off Jan 2018 | 175 Forest Side Av | kitchen remodel, relocate interior staircase, rebuild existing rear yard deck, new & relocated windows at rear of house ( not visible from the street).Details
kitchen remodel, relocate interior staircase, rebuild existing rear yard deck, new & relocated windows at rear of house ( not visible from the street). | $75,000 | |
| Aug 10, 2016 | Expired or cancelled cancelled Oct 2022 | 320 Castenada Av | convert attic to bedroom, bathroom & closet. two dormers @ rear to increase head height.Details
convert attic to bedroom, bathroom & closet. two dormers @ rear to increase head height. | $95,000 | |
| Jul 19, 2016 | Completed final sign-off Mar 2017 | 34 Pond St | revision to pa 201603243021 & 201603243020; remove and replace substandard floor joists & portion of rear roof, & foundation which are at the common areas of the building,not visible to the street. replace in kind.Details
revision to pa 201603243021 & 201603243020; remove and replace substandard floor joists & portion of rear roof, & foundation which are at the common areas of the building,not visible to the street. replace in kind. | $15,000 | |
| Jul 6, 2016 | Completed final sign-off Apr 2017 | 1455 21st Av | remove extg stairs at side, provide new interior stairs, remodel bathroom on lower level, new closet, laundry and misc. improvements.Details
remove extg stairs at side, provide new interior stairs, remodel bathroom on lower level, new closet, laundry and misc. improvements. | $55,000 | |
| Jun 22, 2016 | Completed final sign-off May 2017 | 162 Putnam St | kitchen, bathroom bedroom remodel on the upper level. new bathroom & bedroom expansion on lower level.Details
kitchen, bathroom bedroom remodel on the upper level. new bathroom & bedroom expansion on lower level. | $75,000 | |
| May 19, 2016 | Completed final sign-off Jan 2017 | 36 Bache St | kitchen remodel, 2 bedrooms & bathroom remodel on the lower floor.Details
kitchen remodel, 2 bedrooms & bathroom remodel on the lower floor. | $55,000 | |
| Mar 24, 2016 | Completed final sign-off Mar 2017 | 34 Pond St | reconstruction of substandard rear walls, kitchen remodel, new and reconfigured windows at rear. not visible from streetDetails
reconstruction of substandard rear walls, kitchen remodel, new and reconfigured windows at rear. not visible from street | $75,000 | |
| Feb 18, 2016 | Completed final sign-off Mar 2017 | 180 Carnelian Wy | remodel 3 existing bathrooms on 2nd and 3rd floor (non-structural)Details
remodel 3 existing bathrooms on 2nd and 3rd floor (non-structural) | $25,000 | |
| Aug 20, 2015 | Completed final sign-off May 2019 | 457 Anderson St | site permit - new dormers at upper level, (n) master bathroom & closet to increase headroom in bedroom, reconfigured interior stairsDetails
site permit - new dormers at upper level, (n) master bathroom & closet to increase headroom in bedroom, reconfigured interior stairs | $75,000 | |
| Aug 4, 2015 | Completed final sign-off Feb 2016 | 30 El Mirasol Pl | Throne Builders Inc | kitchen remodel, convert rear portion of garage into family room & laundry room. new exterior stairs @ rear.Details
kitchen remodel, convert rear portion of garage into family room & laundry room. new exterior stairs @ rear. | $55,000 |
| Mar 12, 2015 | Never finaled issued Dec 2015, no final | 844 Lombard St | erect 1-story, type 5, garage/carport.Details
erect 1-story, type 5, garage/carport. | $60,000 | |
| Mar 12, 2015 | Completed final sign-off Nov 2017 | 844 Lombard St | site permit for a reconfigure deck with a new firewall at the property. 30 sq ft. minor expansion at front of building for bedroom. new roof deck. interior remodel.Details
site permit for a reconfigure deck with a new firewall at the property. 30 sq ft. minor expansion at front of building for bedroom. new roof deck. interior remodel. | $95,000 | |
| Mar 10, 2015 | Completed final sign-off Nov 2015 | 325 Banks St | interior remodel to include relocation of interior stairs, new family room, bathroom, closet & laundry room at the lower level.Details
interior remodel to include relocation of interior stairs, new family room, bathroom, closet & laundry room at the lower level. | $92,000 | |
| Nov 19, 2014 | Completed final sign-off Dec 2017 | 1426 46th Av | Snyder Construction | 725 sq ft 2-story rear yard addition. remodel kitchen & bathroom on upper level, (2)(n) bedrooms & (1) bathroom on lower level. (n) interior staircase.Details
725 sq ft 2-story rear yard addition. remodel kitchen & bathroom on upper level, (2)(n) bedrooms & (1) bathroom on lower level. (n) interior staircase. | $145,000 |
| Sep 8, 2014 | Never finaled issued Sep 2014, no final | 3534 24th St | new retaining walls in rear yard. replace windows in front and side in kind size for size wood for wood. 7 windows in front and 3 at the side with ogee lugsDetails
new retaining walls in rear yard. replace windows in front and side in kind size for size wood for wood. 7 windows in front and 3 at the side with ogee lugs | $5,000 | |
| Aug 21, 2014 | Completed final sign-off Jun 2015 | 12 Putnam St | facade restoration, rebuild front stairs & porch. remove roof cover & columns in front. pa#201405155888 to take care of ces nov #201220141Details
facade restoration, rebuild front stairs & porch. remove roof cover & columns in front. pa#201405155888 to take care of ces nov #201220141 | $15,000 | |
| May 22, 2014 | Never finaled issued May 2014, no final | 2486 15th Av | legalize (e) bedroom & bathroom at the lower level, new corridors at the lower level.Details
legalize (e) bedroom & bathroom at the lower level, new corridors at the lower level. | $5,000 | |
| Apr 24, 2014 | Completed final sign-off Sep 2016 | 21 Jersey St | Trim Fit Constr. - O'reilly Engineering | site permit for 900 sq. ft. vertical addition to include new 1 bedroom, new family room, 1 bathroom, roof deck, exterior stairs at rear.Details
site permit for 900 sq. ft. vertical addition to include new 1 bedroom, new family room, 1 bathroom, roof deck, exterior stairs at rear. | $195,000 |
| Mar 19, 2014 | Completed final sign-off Aug 2014 | 1425 Shotwell St | remove rear yard stairs, new and enlarged windows at rear, not visible from the street. new railing at existing rear patioDetails
remove rear yard stairs, new and enlarged windows at rear, not visible from the street. new railing at existing rear patio | $15,000 | |
| Nov 21, 2013 | Completed final sign-off Nov 2014 | 1487 28th Av | interior alterations to include kitchen & bathroom remodel on the upper floor & new family room & bathroom, laundry room on the ground floor.Details
interior alterations to include kitchen & bathroom remodel on the upper floor & new family room & bathroom, laundry room on the ground floor. | $90,000 | |
| Aug 30, 2013 | Completed final sign-off May 2014 | 638 Oak St | bathroom remodel & add skylightsDetails
bathroom remodel & add skylights | $9,000 | |
| Nov 27, 2012 | Completed final sign-off Mar 2014 | 4570 19th St | expansion of rear yard. detached garage. reference variance appln #v20121373vDetails
expansion of rear yard. detached garage. reference variance appln #v20121373v | $19,500 | |
| Aug 30, 2012 | Never finaled issued Aug 2012, no final | 2127 28th Av | lower level improvements to include reconfigure & legalize storage room, bathroom, closet & laundry room. remodel upstairs bathroomDetails
lower level improvements to include reconfigure & legalize storage room, bathroom, closet & laundry room. remodel upstairs bathroom | $60,000 | |
| Aug 9, 2012 | Completed final sign-off Dec 2012 | 2324 Greenwich St | new master bedroom, bathroom, (n) hallway @ lower level. remdoel kitchen & remove wall @ upper level & lower level.Details
new master bedroom, bathroom, (n) hallway @ lower level. remdoel kitchen & remove wall @ upper level & lower level. | $65,000 | |
| May 11, 2011 | Completed final sign-off Jul 2011 | 122 Funston Av | revision to appl #201012287473: increase cost of job per inspector's correction notice.Details
revision to appl #201012287473: increase cost of job per inspector's correction notice. | $40,000 | |
| May 2, 2011 | Never finaled issued Mar 2012, no final | 3534 24th St | site permit for a 896 sq. ft. rear yard addition.Details
site permit for a 896 sq. ft. rear yard addition. | $170,000 | |
| Dec 28, 2010 | Completed final sign-off Jul 2011 | 122 Funston Av | interior remodel of kitchen, bathroom on 2nd floor unit. add w/d, new full bathroom, replace windows visible from street.Details
interior remodel of kitchen, bathroom on 2nd floor unit. add w/d, new full bathroom, replace windows visible from street. | $60,000 | |
| Nov 1, 2010 | Completed final sign-off Jan 2012 | 2862 Folsom St | revision to appl #201006144472: remove & rebuild rear walls o futility reooms. add 2 windows at rear not visible at street.Details
revision to appl #201006144472: remove & rebuild rear walls o futility reooms. add 2 windows at rear not visible at street. | $2,500 | |
| Oct 27, 2010 | Completed final sign-off Feb 2012 | 68 Rosewood Dr | convert crawl space into habitable space. add windows 3 (n) windows visible from street. legalize (e) fam rm and bathrm, remodel upper level bathrmDetails
convert crawl space into habitable space. add windows 3 (n) windows visible from street. legalize (e) fam rm and bathrm, remodel upper level bathrm | $90,000 | |
| Jun 14, 2010 | Completed final sign-off Jan 2012 | 2862 Folsom St | rebuild rear and front stairs, and roof deck per plan. see pa # 9818929 for referenceDetails
rebuild rear and front stairs, and roof deck per plan. see pa # 9818929 for reference | $45,000 | |
| May 14, 2009 | Completed final sign-off Nov 2010 | 306 Chattanooga St | comply w/n.o.v. #200999169: new 6'-0" high lattice fence at property line & new 9'-0" high arbor @ front yard. n ov 199710094 & 199710202.Details
comply w/n.o.v. #200999169: new 6'-0" high lattice fence at property line & new 9'-0" high arbor @ front yard. n ov 199710094 & 199710202. | $1,000 | |
| Mar 20, 2009 | Completed final sign-off Oct 2009 | 1121 Lincoln Wy | interior remodel to kitchen, merge split bathroom, and bathroom remodel.Details
interior remodel to kitchen, merge split bathroom, and bathroom remodel. | $40,000 | |
| Feb 27, 2009 | Completed final sign-off Aug 2010 | 106 Nevada St | facade renovation, reconfigure entrances with minor expansion of living area, new planters and stairsDetails
facade renovation, reconfigure entrances with minor expansion of living area, new planters and stairs | $30,000 | |
| Dec 4, 2008 | Completed final sign-off Dec 2008 | 2139 39th Av | revision to 200810164416: changes to stairs, railing, and landings indicated by clouded/delta 1 itemsDetails
revision to 200810164416: changes to stairs, railing, and landings indicated by clouded/delta 1 items | $2,500 | |
| May 19, 2008 | Completed final sign-off Sep 2009 | 47 Mirabel Av | J K Construction Co | 2 story rear yard addition to include: new family room, bedroom, bathroom, and rear yard deck at 2nd floor, new rec room, storage, and bath at 1st floor.Details
2 story rear yard addition to include: new family room, bedroom, bathroom, and rear yard deck at 2nd floor, new rec room, storage, and bath at 1st floor. | $200,000 |
| Feb 15, 2008 | Completed final sign-off Apr 2009 | 4362 24th St | revision to pa# 2007-0201-3143, note & clouded as delta 1 1. provide moment frame in lieu of shear wall, relocate gas fire place/ 2. lower slab in storage room by 6 inches.Details
revision to pa# 2007-0201-3143, note & clouded as delta 1 1. provide moment frame in lieu of shear wall, relocate gas fire place/ 2. lower slab in storage room by 6 inches. | $12,000 | |
| Feb 12, 2008 | Completed final sign-off Dec 2008 | 818 43rd Av | kitchen & bathroom remodel to include removing walls & replacing them with beams. replacement & alteration of windows ( total 33 windows - 8 windows to be re-sized)wood for wood. replacement of exterior wood shingles on 3 sides.Details
kitchen & bathroom remodel to include removing walls & replacing them with beams. replacement & alteration of windows ( total 33 windows - 8 windows to be re-sized)wood for wood. replacement of exterior wood shingles on 3 sides. | $65,000 | |
| Dec 28, 2007 | Completed final sign-off Sep 2008 | 121 Peralta Av | convert storage area into family room w/ full bathroom. new interior staircase. new patio at front of building.Details
convert storage area into family room w/ full bathroom. new interior staircase. new patio at front of building. | $45,000 | |
| Jul 11, 2007 | Completed final sign-off Jan 2009 | 2139 39th Av | interior remodeling: reconfigure layout of kitchen and bathroom, and add 1 more bathroom at the upper story. at the lower story, remodel bedroom, create 1 more bedroom and relocate bathroom.Details
interior remodeling: reconfigure layout of kitchen and bathroom, and add 1 more bathroom at the upper story. at the lower story, remodel bedroom, create 1 more bedroom and relocate bathroom. | $85,000 | |
| Feb 1, 2007 | Completed final sign-off Apr 2009 | 4362 24th St | site permit for a rear yard addition (488 s.f) horizontal addition.Details
site permit for a rear yard addition (488 s.f) horizontal addition. | $95,000 | |
| Nov 2, 2006 | Never finaled issued Nov 2006, no final | 1193 Oak St | interior remodel of one unit in apartment to include: relocation 1 kitchen, remodel 2 existing bathrooms, add new bathroom, add 2 new windows, reduce height of 2 existing windows, remove 2 walls in living room and misc. improvements thru out 1 unit.Details
interior remodel of one unit in apartment to include: relocation 1 kitchen, remodel 2 existing bathrooms, add new bathroom, add 2 new windows, reduce height of 2 existing windows, remove 2 walls in living room and misc. improvements thru out 1 unit. | $90,000 | |
| Apr 11, 2006 | Completed final sign-off Aug 2006 | 42 Bonview St | remove/replace 9 windows, size for size, aluminum for aluminum except for 1 wondow (h), enlarge window as indicated on drawings. min. u factor 0.67.Details
remove/replace 9 windows, size for size, aluminum for aluminum except for 1 wondow (h), enlarge window as indicated on drawings. min. u factor 0.67. | $15,000 | |
| Sep 28, 2005 | Expired or cancelled expired Jul 2008 | 3869 26th St | rear yard addition (horizontal ).Details
rear yard addition (horizontal ). | $125,000 | |
| Sep 6, 2005 | Expired or cancelled expired Mar 2007 | 518 Oak St | facede improvements to include neew wood siding & wod dr windows, add connice at top of bldg. rebuilDetails
facede improvements to include neew wood siding & wod dr windows, add connice at top of bldg. rebuil | $35,000 | |
| Jul 13, 2005 | Completed final sign-off May 2006 | 1667 Page St | kitchen remodel, remove non load bearing walls. bathroom remodel.Details
kitchen remodel, remove non load bearing walls. bathroom remodel. | $35,000 | |
| Jun 8, 2005 | Completed final sign-off Jun 2005 | 317 Harriet St | Podesta Construction Inc | constructi no bearing int. wa.. 5'long 8'high w/ provacy door within unit , no electic,no plumb.Details
constructi no bearing int. wa.. 5'long 8'high w/ provacy door within unit , no electic,no plumb. | $1,000 |