Block 0542, lot 085
2831 Laguna St
- City’s use
- Single Family Residential
- Built
- 1890
- Stories
- 2
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,465 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 15, 2022 | Never finaled issued Jun 2022, no final | 2831 Laguna St | Andrew Mark Construction Inc | repair and replace existing rear deck at 2nd floor, same size/in kind. (original pa#8713659) less than 50%Details
repair and replace existing rear deck at 2nd floor, same size/in kind. (original pa#8713659) less than 50% | $15,000 |
| May 26, 2022 | Never finaled issued Jun 2022, no final | 2831 Laguna St | Andrew Mark Construction Inc | replace / rebuild roof deck and windscreen. same size.Details
replace / rebuild roof deck and windscreen. same size. | $35,000 |
| Feb 21, 2020 | Never finaled issued Mar 2020, no final | 2831 Laguna St | Andrew Mark Construction Inc | kitchen remodel, (n) laundry in closet on 3rd flDetails
kitchen remodel, (n) laundry in closet on 3rd fl | $45,000 |
| Feb 7, 2017 | Completed final sign-off Sep 2017 | 2831 Laguna St | Sarris Construction | replace 5 windows units and 3 doors units with marvin wood clad inserts. not visible from the street. u factor max. .32Details
replace 5 windows units and 3 doors units with marvin wood clad inserts. not visible from the street. u factor max. .32 | $6,000 |
| Oct 5, 2016 | Never finaled issued Oct 2016, no final | 2831 Laguna St | Schicker Inc Dba Schicker Luxury Bath | 1 hall bathroom remodel, remove (e) shower pan enclosure, install new, paint wall surround, vanity, toilet, ded ckt, gfci outlet and vacancy sensor. any lighting change requires h.e . lighting or controlled by manual on sensor with h.e. main light. no change in wall layout & openings.Details
1 hall bathroom remodel, remove (e) shower pan enclosure, install new, paint wall surround, vanity, toilet, ded ckt, gfci outlet and vacancy sensor. any lighting change requires h.e . lighting or controlled by manual on sensor with h.e. main light. no change in wall layout & openings. | $24,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.