Zhao Wei Lu Construction Co.
- Based in
- Daly City
- On San Francisco permits
- May 2008 to Aug 2017
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 8 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2015 | Completed final sign-off Jul 2016 | 1007 Rhode Island St | reconfigure master suite, guest suite and laundry; re-frame (correction stair to 2nd floor; add skulights and replace windows; new lighting at remokdel areas; new tank-less water heater.Details
reconfigure master suite, guest suite and laundry; re-frame (correction stair to 2nd floor; add skulights and replace windows; new lighting at remokdel areas; new tank-less water heater. | $70,000 |
| Feb 13, 2012 | Completed final sign-off Jul 2012 | 1365 Portola Dr | paint/color all 4 sides (exterior), landscape front yard-add gardening & entry stair remodelingDetails
paint/color all 4 sides (exterior), landscape front yard-add gardening & entry stair remodeling | $60,000 |
| Jul 14, 2011 | Completed final sign-off Aug 2011 | 747 Gates St | repair rear deck & stair:- replace guardrails at deck and stair.Details
repair rear deck & stair:- replace guardrails at deck and stair. | $3,000 |
| Jul 12, 2011 | Completed final sign-off Mar 2012 | 1365 Portola Dr | interior remodeling:relocate kitchen interior stair. replace extg closet doors. remodel garage bath and 1st floor bath.legalize 1/2 bath in garage,1/2 bath on 1st floor floor and legalize full bath on 2nd floor.Details
interior remodeling:relocate kitchen interior stair. replace extg closet doors. remodel garage bath and 1st floor bath.legalize 1/2 bath in garage,1/2 bath on 1st floor floor and legalize full bath on 2nd floor. | $14,500 |