Back to bathroom remodel contractors
Zhao Wei Lu Construction Co.
- Based in
- Daly City
- On San Francisco permits
- May 2008 to Aug 2017
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 2 never finaled. Typically 3 days from filing to permit and 185 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2014 | Never finaled issued Jun 2014, no final | 163 Westgate Dr | revision to appl #2013.12.30.5308: changes to window sizes, skylight additions, remove washer & dryer, half bath reconfigured, kitchen sink moved to wall counter.Details
revision to appl #2013.12.30.5308: changes to window sizes, skylight additions, remove washer & dryer, half bath reconfigured, kitchen sink moved to wall counter. | $1,500 |
| Dec 30, 2013 | Completed final sign-off Feb 2015 | 163 Westgate Dr | legalize basement, kitchen remodel, demo full bath, new 1/2 bath on 1st level, minimize full bath at 2nd level, upgrade elec panel to 200 amps. replace, demo and add new windowsDetails
legalize basement, kitchen remodel, demo full bath, new 1/2 bath on 1st level, minimize full bath at 2nd level, upgrade elec panel to 200 amps. replace, demo and add new windows | $30,000 |
| Sep 1, 2011 | Never finaled issued Sep 2011, no final | 1365 Portola Dr | revision to pa# 2011-0712-0019-interior remodeling, (e) walls to remain at 1st floor, replace guardrail at 2nd floor, convert 2nd floor study room to master closet, master bathroom remodelingDetails
revision to pa# 2011-0712-0019-interior remodeling, (e) walls to remain at 1st floor, replace guardrail at 2nd floor, convert 2nd floor study room to master closet, master bathroom remodeling | $3,000 |
| Jul 12, 2011 | Completed final sign-off Mar 2012 | 1365 Portola Dr | interior remodeling:relocate kitchen interior stair. replace extg closet doors. remodel garage bath and 1st floor bath.legalize 1/2 bath in garage,1/2 bath on 1st floor floor and legalize full bath on 2nd floor.Details
interior remodeling:relocate kitchen interior stair. replace extg closet doors. remodel garage bath and 1st floor bath.legalize 1/2 bath in garage,1/2 bath on 1st floor floor and legalize full bath on 2nd floor. | $14,500 |
| Mar 4, 2011 | Completed final sign-off Jul 2011 | 747 Gates St | remove front facade 4 bay windows:add new bath at 2nd floor.Details
remove front facade 4 bay windows:add new bath at 2nd floor. | $40,000 |
| May 15, 2008 | Completed final sign-off Aug 2008 | 1435 41st Av | remodel the kitchen & bathroom & painting the whole house.Details
remodel the kitchen & bathroom & painting the whole house. | $30,000 |