Back to kitchen remodel contractors
Zhao Wei Lu Construction Co.
- Based in
- Daly City
- On San Francisco permits
- May 2008 to Aug 2017
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 never finaled. Typically 10 days from filing to permit and 249 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2014 | Never finaled issued Jun 2014, no final | 163 Westgate Dr | revision to appl #2013.12.30.5308: changes to window sizes, skylight additions, remove washer & dryer, half bath reconfigured, kitchen sink moved to wall counter.Details
revision to appl #2013.12.30.5308: changes to window sizes, skylight additions, remove washer & dryer, half bath reconfigured, kitchen sink moved to wall counter. | $1,500 |
| Dec 30, 2013 | Completed final sign-off Feb 2015 | 163 Westgate Dr | legalize basement, kitchen remodel, demo full bath, new 1/2 bath on 1st level, minimize full bath at 2nd level, upgrade elec panel to 200 amps. replace, demo and add new windowsDetails
legalize basement, kitchen remodel, demo full bath, new 1/2 bath on 1st level, minimize full bath at 2nd level, upgrade elec panel to 200 amps. replace, demo and add new windows | $30,000 |
| Jul 12, 2011 | Completed final sign-off Mar 2012 | 1365 Portola Dr | interior remodeling:relocate kitchen interior stair. replace extg closet doors. remodel garage bath and 1st floor bath.legalize 1/2 bath in garage,1/2 bath on 1st floor floor and legalize full bath on 2nd floor.Details
interior remodeling:relocate kitchen interior stair. replace extg closet doors. remodel garage bath and 1st floor bath.legalize 1/2 bath in garage,1/2 bath on 1st floor floor and legalize full bath on 2nd floor. | $14,500 |
| May 15, 2008 | Completed final sign-off Aug 2008 | 1435 41st Av | remodel the kitchen & bathroom & painting the whole house.Details
remodel the kitchen & bathroom & painting the whole house. | $30,000 |